PHENIX UPGRADE -2005 Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.

Slides:



Advertisements
Similar presentations
Star kW NEW. Star kW Star kW Instantaneous wall-hung gas boilers Conventional flue Sealed room fan assisted NIKE Star 23 kW EOLO Star 23 kW.
Advertisements

Customer Service – International dept. STAR 24 3 E.
GLOVE BOX For HADRON Blind Detector Upgrade for Phenix Richard W Hutter,5 July 2005 with thanks to Bill Anderson.
WIRED TYPE MULTI ZONE FANCOIL CONTROL SYSTEM MODEL : WSF- 700 SYSTEM
 1) The front coach lights are controlled by the photo switch.  2) Water heater breaker is labeled.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
Search and Rescue Trailer Bungay Fire Brigade 2013.
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Mechanical Assembly High Purity-Atmospheric Pressure Glove Box Dean.
KOREA KIYON COMPANY PROFILE. COMPANY PROFILE Korea Kiyon Company, established in 1985, with the highest quality and most technology advanced inert atmosphere.
Chemigation. Chemigation Chemigation is the process of applying pesticides and fertilizer through irrigation waterChemigation is the process of applying.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Engineer Presentation
Vacuum Box Systems.
Normal Operating Parameters Maintenance Schedule Common Problems Normal Operating Parameters Maintenance Schedule Common Problems ClearWater Tech, LLC.
HVACR416 - Design Humidification. Relative Humidity 1.Air in the home is artificially dried out when it is heated. 2.Because warm air expands, this expansion.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
Installing & Maintaining Irrigation Systems Ms. Gripshover Landscaping Unit 15.
3. Cooling a. Introduction 1) Definition reduce temperature of air entering greenhouse Why? –Reduce stress –Uniformity –Better growth.
STEAM HEATING.
Sea Water Scrubber. INTRODUCTION Crystallox has developed a new generation of horizontal and vertical scrubbers for marine and land based applications.
Exploring CAD - Architectural Electrical Design. OVERVIEW TWO COMPONENTS –POWER –LIGHTS Power to House –Meter –Distribution Panel Box.
1 Some Water Extreme Calculations TK Hemmick for the Tent Crew.
High Pressure Lifting Bags
Water Handling Operations
HETS 4-1 M1070 HET LEFT FRONT VIEW RIGHT REAR VIEW.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
Volume word problems Part 2.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Energy Exchanges in the Atmosphere Atmosphere - blanket of gas that surrounds the earth (the air around us)
Throw Pole Throw Pole nc no. Electric symbols Single pole single throw normally open Single pole single throw normally closed double pole single throw.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
A box with a square base and top has a volume of 10 meters cubed. The material for the base costs $12 per square meter and the material for the sides.
Volume of Rectangular Prisms and Cylinders. Question 1 What is volume? * the number of cubic units needed to fill the space inside a figure.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
Volume of a Rectangular Prism
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
CMS Muon detectors for the GIF++ DRAFT Needs discussion within CMS Muon community A. Sharma.
Electrical Plans.
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Facilities 31Aug05.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
Multiple Module Vacuum Oven Productivity Enhancement System.
Notes Over 3.4Volume The volume of a box is the number of cubic units it can hold. Rectangular box: Cube: Sphere:
Planning The Electrical System  Safe means for the entrance of electrical supply into a building  Means of disconnecting all electrical power in a building.
FRENCH DOOR SIDE BY SIDE
REDA Production Systems
Drafting 2 (Arch) Quiz Review #3 Quiz Review. 1.Dashed lines that follow the counters in a kitchen floor plan most likely represent: A dishwasher Upper.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
S A Griffiths CM42 June 2015 Electrical & Control.
Engineering II – August 2016
Wet / Dry Vacuums.
IT-4189 Supply and installation of a cryogenic distribution system
T-6B On-Board Oxygen Generation System (OBOGS)
Vertical Pressure Filters
Hot water Systems Heaters.
Warm Up Problem of the Day Lesson Presentation Lesson Quizzes.
Door Heat Exchanger: Specification
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05

Box Dry, N 2, Double Sided GLOVEBOX, With Airlock and Equipment Hatch. Interior Dimensions Length 4 meters Height 1.5m Floor Width 1.2 Preferred to1.3Max Top Width 1m Min Main Hatch- must pass a 1 Meter Cube, will be used normally at the beginning and end of assembly process [Box not operating]. Weight Loading- Glove Box Must be able to take a load of 50 Kg/30cm2

Box Gloves- Min 8 pairs [1pair/m if design allows (for10 pairs)], 3 (4) on each side along the length with a second pair above the pair at the Vessel assembly Area on each side to allow easier mid-height access. Operational Pressure Range - 1 Atm [Local] +-10 MilliBar Water <10ppm Particulates 100/cubic meter, < 1 Micron Dia. Leak Rate < 0.05% Operating Temperature – Room [65 to 80 F] Lighting –Main lighting will be Exterior to box Windows- Box is to be Double sided, with a clear top if possible Over pressure Relief Valve - For N2 gun {Approx 10cfm -60psi} will be used in Short Bursts for cleaning inside the box.

Box Instrumentation: H2O [Humidity] Monitor Pressure, Temp Electrical Supply- Interior - Min 2 Duplex outlets at each box end 120V/20A Exterior- We would prefer all systems [pumps, fans, instruments, ect.] to run on 120V, have there own circuit breakers on the box and a Master Shutoff Switch for all power Feed Through Panels –Electrical & Gas 1-Panel at airlock end of 1ft 2 1-Panel at hatch end of 1ft 2 1- Panel in the center on one side,1ft Dehumidification system Glove Box to operate for a Min of 14 days uninterrupted during the Assembly process without regeneration. ½”dia. Swagelok Fittings in Corners of the ends of the glove box for additions N2 Management as Back up.

Airlock- Must pass a cm edge Cube (16”) at minimum into the Glove Box. Weighing 50kg We prefer to be able to pump to vacuum, if this is not possible then the Airlock must have ability to be pumped through [Gas In = Gas being Pumped out, with the manufacture stating a Maximum pressure difference during pumping]. Operation of the Air Lock Should not Degrade the Main Box’s Environment. Fitting for Vacuum operations KF N2 Gas input/outputs Swagelok. Operation – Manual Instrumentation: H2O [Humidity] Monitor Pressure, Temp