Control configulation for S1G module operation H. Hayano 07102009 version 1.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Ray Larsen Chris Adolphsen Chris Nantista ARD Division SLAC National Accelerator Lab ILC GDE Meeting Beijing March
EXPERIENCE FROM KEK Norihito Ohuchi 2009/11/9-101 Workshop on cryogenic and vacuum sectorisations of the SPL.
Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
Cryomodule requirements Hitoshi Hayano, KEK for CFS consideration Asian Single Tunnel Design June 1-2,2010.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Heat load study of cryomodule in STF
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
STF status, April 2011 H. Hayano March 11, 2011: 14:46 Earthquake, AC power down. 16:00~18:00 visual check of STF infrastructure, no severe.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
1 LCWS10 Beijing S1 Global RF Prep (S. Fukuda) 29/3/ S1-Global RF Preparation KEK S. Fukuda Content Time Schedule of S1 Global in KEK Achieving Goal.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
● Offer the reliable system to the Asian regional facility STF. ● Improve TTF design and demonstrate in the beam line for RDR / TDR. ● Establish industrial.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
BCD input from WG2 WG2 12/08/2005 H. Hayano Chris Adolphsen Terry Garvey Hitoshi Hayano.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
STF phase 2 plan H. Hayano, STF phase 2 Accelerator Layout cavities: 2 capture cavities with short ILC-cross-section cryomodule + 26 cavities.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
1 S1Global Experiment Writeup Outlining WIP A N.Toge +
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
LCLS-II LLRF Documentation Sandeep Babel. 2 LLRF Documentation/Budget/Schedule Most Documentation and Budget exists – need to assimilate, review and put.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
S2 Progress Report for EC H. Padamsee and Tom Himel For the S2 Task Force.
ESS LLRF and Beam Interaction
Areal RF Station A. Vardanyan
S1G Experiment Schedule Plan
Cryomodule test stand at ESS site
WP5 Elliptical cavities
S1-G Webex meeting Global Design Effort
352MHz Klystron Control for the 3MeV Linac test stand
Test plan of ESS HB elliptical cavity
The spoke CM tests at FREIA
Breakout Session SC3 – Undulator
Presentation transcript:

Control configulation for S1G module operation H. Hayano version 1

STF main component assignment and function Klystron #1 station S 1 G operationQuantum-beam / phase2 Klystron #2 station Klystron #3 station TL5MW(max:3MW) TL5MW(max:5MW) MBK10MW(max:10MW) coupler process/ RFgun process S1G cryomodule (8 cavities) start-up/stand-alone coupler process/ RFgun operation capture cryomodule (2 cavities) phase2 cryomodules (26 cavities) Cryogenic station Vertical test station EP station main component S1Gcryomodule cooling capture cryomodule cooling then, phase2 cryomodule cooling 1 or 2 cryostat operation2 cryostat operation 1 or 2 EP-bed operation2 EP-bed operation

overall configulation of S1Global module RF signal generation timing generation Modulator cavity PIEZO HV driver Tuner motor driver Vacuum, Temp, RF monitors Digital LLRF klystron driver amp RF-SW on/off control (RFamplitude reference) (RFphase reference) scopes STF-net cryomodule Temp monitors cryomodule

cavity PIEZO HV driver Tuner motor driver Vacuum, Temp, RF monitors cryomodule Temp monitors cryomodule digital LLRF LAN (STF-net) Klystron#2 station surface building S1G cryomodule tunnel Temp Feedthrough for Temp Feedthrough T-tube extention RF power meter RF monitors tuner motor tuner piezo RF cables piezo signal generation vector sum control pulse motor drive wire HV coaxial cable RF cables Which Lab covers which component? control racks in surface control racks in tunnel pulse motor drive wire HV coaxial cable

KEK-network STF building inside STF-net console terminal 1 STF-gate STF-control Main (EPICS) STF-data logger control room near local device #1 RF station LLRF #1 RF station modulator storage #1 RF station RFcontrol, monitor #1 RF station scopes #2 RF station LLRF #2 RF station modulator #2 RF station RFcontrol, monitor #2 RF station scopes #3 RF station LLRF #3 RF station modulator #3 RF station RFcontrol, monitor #3 RF station scopes #1 RF station #2 RF station #3 RF station cryomodule T-monitors cryogenics control/monitor timing, beam control/monitor Vertical test data logger EP data logger STF-net connection from outside; password controled log-in radiation safty Vacuum monitors stf-nt1.kek.jp stfco3 stfcob1 stfcob2 stfco2 stfsv1 console terminal 2 console terminal N

Control software configulation Software Control (1) Write a control and read back it (2) Data logging, trend plot, display and analysis of logged data Fast logging : second interval logging into 1day circular buffer. Dump and storage function by command. Long-term data storage: minute interval data storage from the fast logger. STF Main Menu #1 RF station Beam control #2 RF station #3 RF station Cryogenics monitor Cryomodule monitor VT monitor Vacuum monitor EP monitor safety Laser control Timing control Magnet control beam monitor modulator control RF control Timing control digital LLRF control waveform monitor Data logging control BUttons for popup window Control console window structure

Example of trend plot window example of selection menu window for trend data plot