1 page 1 Discussion on Intraday Capacity Pricing NWE ID project 2011-10-10.

Slides:



Advertisements
Similar presentations
Den Hague 10/10/11 Yves Langer Capacity pricing workshop.
Advertisements

How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Planning for allocation rules and the auction platform NRAs propose to follow a two-steps approach:. 2013: » Based on the wish-list and within the scope.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Draft document – Work in progress
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Towards Regional Independent Operators – a main driver for successful market integration.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
Energy Agency of the Republic of Serbia
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
Medium-term TEC Trading ARODG Seminars Glasgow & London February 2007.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
COMMENTS TO THE SOUTH-WEST EUROPE ELECTRICITY REGIONAL ENERGY MARKET Draft detailed action plan version 1, 22 June 2007.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Doug Wood GTE-CEER transit workshop Brussels, 24 January 2007 Doug Wood GTE-CEER transit workshop, 24 Jan 2007 European Federation of.
Public Consultation : main conclusions (1/2)
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft for factual comments, suggestions on overlaps welcome.
Continuous Cross-Border Implicit Intraday Trade Status update
Background and Process
NWE Cross Border Intraday
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
29th April 2014 Teleconference
Incentives for electricity infrastructure – ERGEG view
Presentation transcript:

1 page 1 Discussion on Intraday Capacity Pricing NWE ID project

2 page 2 The following slides are still work in progress. The presentation reflects the current status of discussions between NWE TSOs and an initial exchange of ideas with NWE PXs. There are some issues that still or after a second thought need to be clarified, eg. definition of scarcity, congestion rent in relation to additional capacity

3 page 3 Content 1.Introduction a.Objective b.Terminology c.Ranking vs. Pricing d.Legal background 2.Ranking a.Allocation principles b.Implicit access (SOB) c.Summary 3.Pricing of Capacity Appendix

4 page 4 The objectives of this set of slide is to describe the areas where capacity has a value, and to list how this value should be reflected in the IDXB solution Further the slides shall demonstrate that TSOs are making a clear distinction between Ranking (mechanism to meet an efficient allocation of capacity) and Pricing (mechanism to generate revenues when network congestion) Ranking and Pricing of intraday capacity should be assessed against some main, non exhaustive criteria such as: –Short term: allocate capacity efficiently in a market-based manner, ensuring that capacity is allocated to who is valuing the capacity the most –Mid term: ensure consistency between the different timeframes such as day-ahead (notably in order to run an orderly market and avoid liquidity leakages due to incoherencies in the different timeframes) –Long term: provide the right investments incentives in terms of generation, consumption and capacity –Ensure that the maximum of capacity is allocated in the most efficient and least costly manner, while guaranteeing a certain level of security of supply –Ensure compatibility with the general IDXB solution based on a continuous implicit allocation scheme in terms of e.g. performance –Ensure the operational feasibility of the implementation, and the proportional cost of the mechanism with regards to the economic benefits expected 1. Introduction 1. a Objectives

5 page 5 Aggressor –In continuous market under paid-as-bid scheme, the participant who performed the last action on the platform which triggered a deal is called the aggressor Economic surplus (in terms of welfare) –In continuous market under paid-as-bid scheme, the remaining money of a deal after all matched orders are paid the price of the bids is called the surplus. –The surplus - which is by construction non-negative (otherwise there is no deal) - is allocated to the aggressor Intraday network congestion problem –Situation where there is more demand for transmission capacity than available Congestion income –In the specific context of IDXB, the surplus generated by matching orders at their bid price following an increase of the available capacity is called the congestion income. At this stage 1. Introduction 1.b Terminology

6 page 6 1. Introduction 1. c. Difference between “Ranking” and “Pricing” Ranking of capacity requests based on timestamps, i.e. on a first-come-first-served basis. –As this mechanism enables also the implicit valorization of the capacity through PXs cross-border markets – and in some cases subject to cross-border arbitrage with the OTC market –, it is today accepted as an efficient one (see Directive 714/2009, art. 2.1) Ranking capacity requests based on willingness to pay –this means that capacity value - explicit (explicit price for capacity) or implicit (spread of energy orders) - is a criteria for allocated capacity. Capacity will be first allocated to the highest capacity value –This criteria can be mixed with other criteria, for example a time criteria, which is the case in continuous trading with automatic matching Pricing –this means that the capacity value (or congestion rent) is extracted from an allocation. This concept refers to the pricing mechanism for a trade or capacity  It is possible to allocate capacity based on willingness to pay (market-based) and not to extract a congestion rent (ex: pay-as-cleared in an auction)  It is possible to extract a congestion rent and to allocate capacity on another basis than willingness to pay (ex: pay-as-bid in a pure first-come-first-served mechanism)  Ranking and Pricing are two different features that are not necessarily associated

7 page 7 1. Introduction 1.d Legal Background (i) The following articles of the directive 714/2009 deal with the market-based aspect of allocation –Article 16.1: "Network congestion problems shall be addressed with non-discriminatory market-based solutions which give efficient economic signals to the market participants and transmission system operators involved. Network congestion problems shall preferentially be solved with non-transaction based methods, i.e. methods that do not involve a selection between the contracts of individual market participants.“ –" Congestion-management methods shall be market-based in order to facilitate efficient cross-border trade. For that purpose, capacity shall be allocated only by means of explicit (capacity) or implicit (capacity and energy) auctions. Both methods may coexist on the same interconnection. For intra-day trade continuous trading may be used."

8 page 8 The FG CACM deals with pricing of intraday transmission capacity “The CACM Network Code(s) shall set out all necessary provisions for the implementation of the pan-European intraday target model supporting continuous implicit trading, with reliable pricing of intraday transmission capacity reflecting congestion (i.e. in case of scarce capacity). The method for pricing capacity and the allocation of congestion rents shall be subject to approval by the NRAs concerned.” “As a transitional measure, direct explicit access to the capacity will also be allowed, subject to the approval by the relevant NRAs […] The removal of direct explicit access for each border shall be subject to consultation with market parties and then approval of the relevant NRAs.” 1. Introduction 1.d Legal Background (ii) Following the FG CACM it is currently assumed that the removal of explicit access and the introduction of pricing of capacity will occur at the same time.

9 page 9 NWE regulators position: By December 2011, NWE TSOs and power exchanges should present options for pricing intraday capacity in the case of congestion. Broad consultation on the options for intraday pricing should take place in The European target model for intraday cross-border trade is for intraday capacity pricing reflecting congestion to be introduced by It is not yet clear what the best approach will be to facilitate intraday capacity pricing and this will depend on a number of factors. Therefore TSOs, PXs and Regulators need to investigate the different options for intraday capacity pricing and their associated costs and benefits This relates also to another part of the final draft of the FG CACM (5.1): “ (…) Regulators will require a good understanding of the options and associated costs and benefits for each significant step in the implementation of the approved intraday roadmap.” 1. Introduction 1.d Legal Background (iii) Capacity pricing must be subject to an in-depth analysis including a costs-benefits one, to allow a good understanding of its impacts and enable regulatory decision in that respect

10 page 10 page 1.Introduction a.Objective b.Terminology c.Ranking vs. Pricing d.Legal background 2.Ranking a.Allocation principles b.Implicit access (SOB) c.Summary 3.Pricing of Capacity Appendix

11 page 11 page A question of efficiency: Who should get capacity if a congestion occurs and based on which criteria? 2. Ranking

12 page 12 page 2. Ranking 2. a. Allocation principles 1.No capacity available => no allocation 2.Sufficient* available capacity (i.e. no congestion) => Allocation based on pure FCFS 3.“New” capacity becomes available => allocation based on willingness to pay (idem at opening of ID market) 4.Limited* capacity available (i.e. congestion)  allocation based on willingness to pay Market “A” Market “B” Available Capacity? * compared to demand for capacity

13 page 13 page 2. Ranking 2.b Implicit access (SOB) – No capacity available Offers / sellers: €30 €31 €32 Market “A” Market “B” Capacity = 0 No capacity, therefore it is not possible to match offers in A, with Bids in B. Bids / buyers: €35 €34 €33

14 page 14 page Offers: €30 €31 €32 Market “A” Market “B” Capacity = 200 Bids: €35 €34 €33 New capacity becomes available (200MW), energy order matches are now possible. 2. Ranking 2.b Implicit access (SOB) – Additional capacity (i)

15 page 15 page MW € MW Energy Orders Matched: Market AMarket B Allocation takes place in accordance with price (willingness to pay). €30with€35 €31with €34 2. Ranking 2.b Implicit access (SOB) – Additional capacity (ii)

16 page 16 page No congestionIn case of congestion Capacity Allocation Pure FCFS SOB Automatic matching OTC Balancing Capacity Allocation -Ranking based on value criteria SOB Automatic matching OTC Balancing 2. Ranking 2. c. Summary

17 page 17 page 1.Introduction a.Objective b.Terminology c.Legal background d.Ranking vs. Pricing 2.Ranking a.Allocation principles b.Implicit access (SOB) c.Summary 3.Pricing of Capacity Appendix

18 page 18 page WILL THERE BE PRICING OF CAPACITY I.E. EXTRACTION OF A CONGESTION RENT? 3. Pricing of Capacity

19 page 19 page Ensuring efficient capacity allocation (done with ranking on the willingness to pay) –Short term efficiency: ensures demand is served by the least cost generator (capacity allocated to trade with the highest buy-sell spread) –Long term efficiency: incentives to invest generation in deficit areas, as well as increased incentives for network expansion –How? Capacity must be allocated to the most economically efficient energy offers –When capacity is scarce*, this involves that capacity is valued by the requesters (willingness to pay / adjustment of the underlying energy orders) Therefore, under which conditions capacity pricing would be needed ? –If capacity is a scarce good –If it is a mean of valorization of capacity that can enhance the welfare by a more efficient allocation (better selection of the requests) –If it follows a transparent pricing mechanism for the market participants (who will need to buy the capacity product to the TSOs) The aim of pricing capacity in the intraday market should not be to maximize TSO's income, but to enhance the capacity allocation 3. Pricing of Capacity * Capacity may be a scarce good in the intraday time frame even though there is capacity left after the day-ahead allocation because a congestion may appear during an intraday session

20 page 20 page How to evaluate the added value of capacity pricing? –Benefits in terms of capacity allocation efficiency - factor of: o Added welfare gains –Benefits in terms of congestion rent* - factor of: o Expected amount of recalculated intraday capacity o Expected number of hours of congested cases following recalculation of intraday capacity o Expected price differences between hubs – i.e. willingness to pay for the capacity Vs. –Costs - factor of: o Expected costs for the implementation of the pricing mechanism o Expected negative impact on the trading mechanism efficiency 3. Pricing of Capacity * Legitimate only if associated with higher welfare gains

21 page 21 page Thanks for your attention!

22 page 22 page Backup Potential solution to collect explicit price for explicit requests (OTC)

23 page 23 page Ranking Explicit access Offers: €30 €31 €32 Market “A” Market “B” Capacity = 0 Bids: €35 €34 €33 Explicit request for 100 MW Capacity at a price of €4. How to consider the explicit request alongside the Energy Market orders?

24 page 24 page Ranking Explicit & Implicit access – Additional capacity € MW Energy order pairs can be viewed as making explicit capacity requests: First Pair of energy orders value the capacity at (€35-€30)=€5 Second Pair of energy orders value the capacity at (€34-€31)=€3 Third Pair of energy orders value the capacity at (€33-€32)=€1 Results in 3 implicit requests for capacity: 100 €5 100 €3 100 €1

25 page 25 page Can be ranked along with the pending explicit request for Capacity: 100 €4. i)100 €5 ii)100 €4 iii)100 €3 iv)100 €1 Capacity allocated according willingness to pay, thus available capacity (200MW) is allocated to top two ranked requests. The 3 ‘implicit’ requests for Capacity: i)100 €5 ii)100 €3 iii)100 €1 Ranking Explicit & Implicit access