AREP GAW Section 14 – Daily Air Quality Forecast Operations 1 Overview of Course Course Content: Background –Introduction and Overview of Course –What.

Slides:



Advertisements
Similar presentations
How Well Forecast Were the 2004 and 2005 Atlantic and U. S
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Climate Prediction Applications Science Workshop
Weather Forecasting This chapter discusses: 1.Various weather forecasting methods, their tools, and forecasting accuracy and skill 2.Images for the forecasting.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Taher A. Sharif Department of Atmospheric science, University of AlFateh, Tripoli, Libya
AREP GAW Section 3 Introduction and Overview of Course.
Exercise Interpreting Radiosondes Mixing height calculator
AREP GAW Section 5 How Are Forecasts Used? Protect Public Health Operate Emissions Reduction Programs.
AREP GURME Section 11 Case Studies of Episodes What is a Case Study? How to Conduct Case Studies Examples.
AREP GAW Section 13 Developing a Forecasting Program Understanding Users Needs Understanding the Processes that Control Air Quality Choosing Forecasting.
ECMWF Training Course 2005 slide 1 Forecast sensitivity to Observation Carla Cardinali.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
GOALS FOR TODAY Understand how to write a HACCP Plan
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 10 second questions
The University of Reading Helen Dacre UM user 2009 Forecasting the transport of pollution using a NWP model ETEX Surface Measurement Sites.
ZMQS ZMQS
Chapter 13 – Weather Analysis and Forecasting
Weather Quick Quiz. Beaufort: Force 8 Mean wind speed (knots): 37 Limit of wind speed (knots): Description: Gale Sea State: Very Rough - High.
Weather diary 31ST March-6 April hungary,Marcali.
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013
Credit Risk Plus November 15, 2010 By: A V Vedpuriswar.
ABC Technology Project
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
Squares and Square Root WALK. Solve each problem REVIEW:
1 Verification of wave forecast models Martin Holt Jim Gunson Damian Holmes-Bell.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Catastrophic Events Mr. Johnson, Science.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
1 NWS-COMET Hydrometeorology Course 15 – 30 June 1999 Meteorology Primer.
Radar Palette Home Click Conventional Post Cold Frontal 1 Equatorward of DCB The DCB tends to sink isentropically as it typically curls anticyclonically.
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Unit 5D: Changing State. Changing State Unit 5D: Changing State: Vocabulary Unit 5D: Changing State Some useful words Evaporation Condensation Boiling.
A few tips on writing a good forecast discussion: Monday, January 24 NWS Discussion as an example Atmo 456 Conlee/Seroka.
How to get the most from the Internet briefings NWS Boise, Id.
Chapter 4: Weather & Climate Defining weather & climate Controls of weather & climate –Solar energy/latitude –Land and water distribution –Landform barriers.
AREP GURME Section 2 Executive Overview. AREP GURME 2 Section 2 – Executive Overview Topics Why forecast air quality? What is needed? About the course.
AREP GAW AQ Forecasting. AREP GAW Section 4 – What Are We Forecasting? 2 What Are We Forecasting – Averaging Time (3 of 3) Air Quality Standard Level.
Estimating local versus regional contributions to tropospheric ozone: An example case study for Las Vegas Mark Green and Dave DuBois Desert Research Institute.
On the Model’s Ability to Capture Key Measures Relevant to Air Quality Policies through Analysis of Multi-Year O 3 Observations and CMAQ Simulations Daiwen.
Techniques for Evaluating Wildfire Smoke Impact on Ozone for Possible Exceptional Events Daniel Alrick 1, Clinton MacDonald 1, Brigette Tollstrup 2, Charles.
Regional Modeling Joseph Cassmassi South Coast Air Quality Management District USA.
CalNex Forecast Prepared Sunday 23 May Anticipated Platform Activities WP-3D Sunday May 23: An evening-into-night flight touring the LA Basin and.
CalNex Forecast Prepared Saturday 29 May Anticipated Platform Activities WP-3D Saturday: evening-night flight, 7 pm takeoff Sunday: night-early.
CalNex Forecast Prepared Saturday 1 May Predicted Features - Potential Targets Monday - Potential P3 Flight day Opportunity to sample aged LA emissions.
World Geography 3202 Unit 2 Climate Patterns.
Presentation transcript:

AREP GAW Section 14 – Daily Air Quality Forecast Operations 1 Overview of Course Course Content: Background –Introduction and Overview of Course –What Are We Forecasting? –How Are Forecasts Used? –Health Effects Understanding –Chemical Aspects of Air Pollution –Pollutant Monitoring –Pollutant Lifecycles and Trends –Air Pollution Meteorology –Case Studies of Episodes Developing a program –Air Quality Forecasting Tools –Developing a Forecasting Program –Daily Air Quality Forecast Operations

AREP GAW Section 14 Daily Air Quality Forecast Operations

AREP GAW Section 14 – Daily Air Quality Forecast Operations 3 Daily Forecast Operations Nine steps to produce an accurate air quality forecast - a suggested method 1.Review yesterdays forecast 2.Review the latest air quality data 3.Review the weather 4.Develop a phenomenological forecast 5.Run forecast tools 6.Produce a final forecast 7.Document the forecast 8.Distribute the forecast 9.Monitor air quality and meteorology

AREP GAW Section 14 – Daily Air Quality Forecast Operations 4 Daily Forecast Operations Day 0 (August 22, 2005) Day 1 (August 23, 2005) Example Forecast: Sacramento, California, USA

AREP GAW Section 14 – Daily Air Quality Forecast Operations 5 Step 1: Review Yesterdays Forecast (1 of 3) Did the forecast for yesterday verify? If the forecast missed by more than 20-30%, a retrospective study is recommended. Did it verify for the right reasons? For example, you forecasted for low ozone because of predicted rain, but low ozone occurred with no rain. Did all monitors report data yesterday? Are there any bad data points? If the forecast didnt verify, does that affect the forecast you plan to issue today?

AREP GAW Section 14 – Daily Air Quality Forecast Operations 6 Step 1: Review Yesterdays Forecast (2 of 3) Verification for yesterday –Ozone forecast issued on August 22, 2005 (Day 0) for August 22, 2005 (Day 0): 80 ppb –Observed peak 8-hr average ozone on August 22, 2005 (Day 0) Placerville: 79 ppb Cool: 75 ppb Elk Grove: 73 ppb Folsom: 72 ppb Ozone forecast issued on August 22, 2005 (Day 0) for August 23, 2005 (Day 1): 75 ppb

AREP GAW Section 14 – Daily Air Quality Forecast Operations 7 Step 1: Review Yesterdays Forecast (3 of 3) Discussion issued on August 22, 2005 (Day 0): Today, skies will remain sunny and temperatures will be seasonably warm. These conditions, combined with a light to moderate afternoon delta breeze, will lead to Moderate ozone levels. In addition, an isolated site in the foothills may reach Unhealthy for Sensitive Groups. Tomorrow, an upper-level trough of low pressure will move into the Pacific Northwest, weakening the temperature inversion, strengthening the delta breeze, and cooling temperatures a few degrees. These conditions will result in Good to Moderate AQI levels across the Sacramento region.

AREP GAW Section 14 – Daily Air Quality Forecast Operations 8 Are all sites reporting data today? How does yesterdays air quality compare with todays? Is todays meteorology (wind, temperature) similar to yesterdays? Hourly ozone values from today and yesterday Step 2: Review the Latest Air Quality Data

AREP GAW Section 14 – Daily Air Quality Forecast Operations 9 Step 3: Review the Weather (1 of 4) What is the general synoptic pattern? –Ridges and troughs –Upper-level warming and cooling –Surface and aloft winds Is the large-scale pattern changing? Are these changes going to influence local weather and air quality? What are the local meteorological conditions? If weather forecasts are predicting conditions conducive to good air quality, consider skipping to Step 6, Produce a Final Forecast

AREP GAW Section 14 – Daily Air Quality Forecast Operations 10 Step 3: Review the Weather (2 of 4) Day 0: August 22, GMT Day 1: August 23, GMT Day 2: August 24, GMT 500-mb heights Surface analysis * * * * * *

AREP GAW Section 14 – Daily Air Quality Forecast Operations 11 Day 0 Day 1 Day 2 Morning Evening Soundings in Sacramento, California, August 22-24, Step 3: Review the Weather (3 of 4)

AREP GAW Section 14 – Daily Air Quality Forecast Operations 12 Step 3: Review the Weather (4 of 4) Elk Grove winds Cool winds Folsom winds Placerville winds August 22 (Day 0)August 23 (Day 1)

AREP GAW Section 14 – Daily Air Quality Forecast Operations 13 Step 4: Develop a Phenomenological Forecast (1 of 2) Use your conceptual understanding to fill in the following air quality forecast worksheet. The worksheet is designed to capture important processes that influence air quality. Ozone (ppb) 500-mb Pattern Surface Pattern WindsInversion/ Mixing CarryoverClouds/ Fog Transport/ Recirculation Yesterday Today Tomorrow

AREP GAW Section 14 – Daily Air Quality Forecast Operations 14 Step 4: Develop a Phenomenological Forecast (2 of 2) Example forecast worksheet for ozone Ozone (ppb) 500-mb Pattern Surface Pattern WindsInversion/ Mixing CarryoverClouds/ Fog Transport/ Recirculation Day 079Weak Trough Weak onshore Light sea breeze Strong inversion, some mixing from trough NoSunnyNone Day 188Weak Trough No gradient Light sea breeze Strong inversion, some mixing from trough YesSunnyNone Day 287Weak Trough Weak offshore Moderate sea breeze Weak inversion, mixing from trough YesSunnyNone

AREP GAW Section 14 – Daily Air Quality Forecast Operations 15 Step 5: Run Forecast Tools Gather and review forecast and observational data needed to run the forecast tool(s). Run the tool(s). Modify input values to estimate the impact of uncertainties in the weather forecasts. Save inputs and outputs for future verification.

AREP GAW Section 14 – Daily Air Quality Forecast Operations 16 Step 5: Run Forecast Tools – Example Regression forecasting tool output for Sacramento, California Day 1

AREP GAW Section 14 – Daily Air Quality Forecast Operations 17 Step 6: Produce a Final Forecast Review output from forecast tools and the conceptual forecast. Do the forecasts from different tools agree? –If so, you may choose to use the average or the high or low values, or some value in between depending on your program objectives. –If not, check inputs for each tool. Ozone Forecast (ppb) Phenomeno- logical ToolFinal Day 1 Unhealthy for Sensitive Groups (85-105) 7088 Day 2 Unhealthy for Sensitive Groups (85-105) 7587

AREP GAW Section 14 – Daily Air Quality Forecast Operations 18 Step 7: Document the Forecast Document forecast rationale –What happened yesterday –Whats expected today and tomorrow and why Sacramento Forecast Discussion issued August 23, 2005 (Day 1) Today, despite an upper-level trough of low pressure moving into the Pacific Northwest, the temperature inversion remains strong, the delta breeze is weak, and temperatures are warm in the Sacramento area. These conditions will result in Unhealthy for Sensitive Groups AQI levels across much of the region. Tomorrow, the temperature inversion will begin to weaken as the upper-level trough moves south into Northern California. In addition, cooler surface temperatures and a stronger delta breeze will lower ozone levels. However, high carryover from today will keep ozone levels low-end Unhealthy for Sensitive Groups in the foothills.

AREP GAW Section 14 – Daily Air Quality Forecast Operations 19 Step 8: Distribute the Forecast Ensure forecast distribution occurs on time by planning a daily timeline. Distribution –Internal (technical details) –Public (generalized and health-oriented) Fax Internet Phone Pager

AREP GAW Section 14 – Daily Air Quality Forecast Operations 20 Step 9: Monitor Air Quality and Meteorology (1 of 2) Monitor the air quality and meteorology throughout the day for unexpected changes. Update the forecast if meteorology or air quality is different than expected. Ensure that incoming data are reasonable given the meteorological and air quality conditions.

AREP GAW Section 14 – Daily Air Quality Forecast Operations 21 Step 9: Monitor Air Quality and Meteorology (2 of 2) Ozone concentrations at Cool, Folsom, and Elk Grove are higher than yesterday during the peak afternoon hours. Forecast for higher ozone concentrations today is on track.

AREP GAW Section 14 – Daily Air Quality Forecast Operations 22 Summary Following a predetermined daily forecasting protocol helps produce a consistent, timely, and accurate forecast.