ETSI – TS – Life Cycle Assessment of ICT

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Chapter 7 System Models.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 3 CPUs.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
1 Hyades Command Routing Message flow and data translation.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
ITU Workshop on Green ICT Ouagadougou, Burkina Faso
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Create an Application Title 1A - Adult Chapter 3.
Process a Customer Chapter 2. Process a Customer 2-2 Objectives Understand what defines a Customer Learn how to check for an existing Customer Learn how.
Human Service Providers and Referrals Chapter 5. Human Service Providers and Referrals 5-2 Objectives Demonstrate the process for entering a Human Service.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
1. Name the particles in the atom and give the charges associated with each.
Projects in Computing and Information Systems A Student’s Guide
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Lost in Translation Measuring and Managing GOOD Web Intentions Marilyn Harmacek. 1.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
ACC 3200 Chapter 3: Process Costing Process Costing.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Transitioning to Version 8 Building Data Entry Issues in NEAT/MHEA and Oak Ridge National.
Financial and Managerial Accounting
Break Time Remaining 10:00.
Chapter 5 – Enterprise Analysis
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Juan Gallegos November Objective Objective of this presentation 2.
21 st Annual Conference. Delivering sustainable solutions in a more competitive world Mercury Lamps - Life Cycle Assessment for Product Stewardship Peter.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
Adding Up In Chunks.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Subtraction: Adding UP
Chapter 2 Entity-Relationship Data Modeling: Tools and Techniques
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 12 View Design and Integration.
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Employment Ontario Literacy and Basic Skills Performance Management Reports Training For Service Providers.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Presentation transcript:

ETSI – TS 103 199 – Life Cycle Assessment of ICT Dr. Anders S.G. Andrae

Life Cycle Assessment (LCA) of ICT equipment, networks and services: General methodology and common requirements © 2011 – Proprietary and Information of ETSI

Introduction – Problems addressed ISO 14040, ISO 14044 and the ILCD Handbook are recognized as normative LCA knowledge documents for “any” application Based on the ISO standards, numerous LCA results for ICT with different quality and inconsistent result presentations have been provided – EU requirement on improvement Standardization of LCA of ICT IS DEFINATELY NEEDED! ETSI has responded to the gap Work started in 2008-2009 and will finish in 2011 The ETSI standard for ICT LCA is intended to be more specific than ISO 14040/ISO 14044, but less specific than, e.g., Japanese Product Category Rules for, e.g., notebooks © 2011 – Proprietary and Information of ETSI

Features of the new ETSI LCA standard Based on ISO 14040, ISO 14044 and the ILCD Handbook Lifetimes – Defined Functional units (f.u.) – Basic f.u. defined System boundaries – Life Cycle Stages and Unit Processes Identified and Classified as Mandatory or Optional -The level of detail is relativelely high  good guidance for users Rules for Cut–off if they cannot be avoided Data quality evalution – Qualitative requirements defined for all life cycle stages and unit processes Allocation methods – Specified. E.g., 50/50 allocation prefereed between Raw Matr. Aquisition and Metal recycling. Detailed reporting instructions (diagrams, tables) ...will help, e.g., 3rd party reviewers 4 © 2011 – Proprietary and Information of ETSI 4

General requirements - Life cycle stages A. Equipment Raw material acquisition which is composed by Raw material extraction (A1) Raw material processing (A2) B. Production which is composed by ICT Equipment production (B1) Support Equipment production (B2) C. Use which is composed by ICT Equipment Use (C1) Support Equipment Use (C2) Operator activities (C3) Service Provider Activities (C4) D. Equipment End of Life Treatment Re–use (D1) ICT specific EoLT (D2) Other EoLT (D3) 7 categories of Re-occuring Generic Unit Processes, e.g., Transportation, Energy supply 5 © 2011 – Proprietary and Information of ETSI 5

General requirements - Lifetime Lifetime is (always) critical for the interpretation of the results of (ICT) LCAs Operating lifetime: The duration of the actual use period (consisting of both active and non–active periods) for the first user. Storage time is not included in operating lifetime. Operating lifetime shall always be reported and be based on available information on actual product use. 6 © 2011 – Proprietary and Information of ETSI 6

Goal&Scope Definition - Intro Any ICT Equipment which can be part of a Network delivering voice and/or data lies within the scope of the ETSI LCA standard. 7 © 2011 – Proprietary and Information of ETSI 7

Goal&Scope Definition – Functional Unit The number of users/subscribers supported shall be specified and the traffic profile shall be considered where applicable. MANDATORY BASIC FUNCTIONAL UNITS Annual ICT Equipment use (per one year of ICT Equipment use) or Total ICT Equipment use per lifetime of ICT Equipment. Annual Network use Annual Service use. 8 © 2011 – Proprietary and Information of ETSI 8

Goal&Scope Definition – System Boundaries System boundary A: EQUIPMENT RAW MATERIAL ACQUISITION A1. Raw material extraction A2. Raw material processing G1. TRANSPORTS&TRAVEL B: PRODUCTION B1. ICT Equipment production B1.1 Parts production B1.2 Assembly B1.3 ICT manufacturer support activities B2. Support Equipment production B2.1 Support Equipment manufacturing B2.2 Site construction C: USE C1. ICT Equipment use C2. Support Equipment use C3. Operator activities C4. Service provider activities D: EQUIPMENT END-OF-LIFE TREATMENT D1. Re–use of ICT Equipment D2. ICT specific EoLT D2.1 Disassembly/Dismantling/Shredding D2.2 Recycling D3. Other EoLT G2. ELECTRICITY SUPPLY G3. FUEL SUPPLY G4. OTHER ENERGY SUPPLY G5. RAW MATERIAL AQUISTION G5.1. Raw material extraction G5.2. Raw material processing G6. END-OF-LIFE TREATMENT G6.1 EHW treatment G6.2 Other waste treatment G7. RAW MATERIAL RECYCLING 9 © 2011 – Proprietary and Information of ETSI 9

Goal&Scope Definition – System Boundaries Classification “Table 1” within your product system 10 © 2011 – Proprietary and Information of ETSI 10

Goal&Scope Definition – System Boundaries 11 © 2011 – Proprietary and Information of ETSI 11

Goal&Scope Definition – Support activities The term Support activities refers to, e.g., offices including ICT use for marketing, sales and R&D, and also to business travel, commuting and service vehicles. Support activities are optional to include but should be included where possible. The extent in which Support activities and other Optional activities are included for different parts of the life cycle shall be clearly described in the study report. 12 © 2011 – Proprietary and Information of ETSI 12

Goal&Scope Definition – Raw Material Acquisition System boundary A1. Raw material extraction A2. Raw material processing B. PRODUCTION G7. RAW MATERIAL RECYCLING 13 © 2011 – Proprietary and Information of ETSI 13

Goal&Scope Definition – Production 14 © 2011 – Proprietary and Information of ETSI 14

Goal&Scope Definition – Use System boundary C3. Operator activities D. EoLT B.PRODUCTION C2. Support Equipment Use C1. ICT Equipment use C4. Service provider activities 15 © 2011 – Proprietary and Information of ETSI 15

Goal&Scope Definition – End-of-Life System boundary D3. Other EoLT C. USE D1 Re–use of ICT Equipment D2 ICT specific EoLT D2.1 Storage/Disassembly/Dismantling/Shredding D2.2 Recycling D2.2.1 Battery recycling ICT specific metal/mechanical parts/fractions EoLT D2.2.2 PCBA recycling D2.2.3 Cable recycling D2.2.4 Mechanics recycling D2.2.5 Other ICT recycling G7. RAW MATERIAL RECYCLING 16 © 2011 – Proprietary and Information of ETSI 16

Goal&Scope Definition – Networks System Boundaries For the Network under study applicable types of nodes and infrastructure, as well as amounts of these, shall be defined. Functional Block diagrams (HW and SW) essential for showing study scope The impact from software development shall be included. The Network shall be defined in terms of ICT equipment, Support Equipment and infrastructure. Operator activities (mainly installation, maintenance and de-installation) shall always be included 17 © 2011 – Proprietary and Information of ETSI 17

Goal&Scope Definition – Services System Boundaries In order to calculate the impact of a Service, it is necessary to first assess the Network Most often (i.e., in a multi–service situation) an allocation of an appropriate amount of the Network impact to the Service under study is needed Service software development, Service use of consumables, Service sales and logistics infrastructure, Service associated travels and transports Data centers are key Service provider activities Positive and negative impacts 18 © 2011 – Proprietary and Information of ETSI 18

Goal&Scope Definition – Cut-off rules Cut–offs shall be avoided as far as possible! Table 1 constitute a significant share for typical product systems in ICT LCAs The intention is that all Mandatory life cycle stages/unit processes of Table 1 shall be included Model unavailable data based on known data Mandatory to: motivate clearly eventual cut–offs of mandatory life cycle stages/unit processes from Table 1 describe clearly the cut–off criteria used within a study consider unit processes/flows that have been cut–off for the sensitivity analysis. 19 © 2011 – Proprietary and Information of ETSI 19

Goal&Scope Definition – Data quality requirements Generic data: Data from any relevant data source which need not be specific for ICT applications and processes. Generic data is always secondary. Specific data: Data emerging from, in this case, ICT specific applications and processes. This data could be either primary or secondary. Primary data: Data collected/estimated/measured by a researcher, specifically for the LCA project; for example, pilot studies or customer or producer surveys. Secondary data: Data that has been collected for another purpose, but can be analyzed again in a subsequent study; for example, LCA estimates by academia, government, or industry organizations. 20 © 2011 – Proprietary and Information of ETSI 20

Goal&Scope Definition – Data quality requirements onTable 1 21 © 2011 – Proprietary and Information of ETSI 21

Goal&Scope Definition – Data quality requirements on Table 1 cont 22 © 2011 – Proprietary and Information of ETSI 22

Life Cycle Inventory – Data collection The LCA practitioner shall report for which processes transports/energy supplies have been added separately and for which they are “hidden”. For many products (especially end–user equipment), periods of idling and power off are important to model the usage profile and shall be considered. 23 © 2011 – Proprietary and Information of ETSI 23

Life Cycle Inventory - Allocation rules Generic processes (G1–G7) shall be allocated as a whole to the life cycle stage in which they are used Support activities… Facilities… Transports shall be allocated based on chargeable weight Recycling: The 50/50 method shall be used to allocate use of recycled Raw Material between A1-A2 and D. If used LCI data (e.g., for gold production) do not reveal the scrap% of metal, the 100/0 method is allowed. No metal recycling in EoLT allowed with 100/0. 24 © 2011 – Proprietary and Information of ETSI 24

Life Cycle Inventory – Allocation rules – 50/50 25 © 2011 – Proprietary and Information of ETSI 25

Life Cycle Inventory – Allocation rules – 100/0 26 © 2011 – Proprietary and Information of ETSI 26

Life Cycle Inventory - Allocation rules for Equipment data to Networks End–user equipment (e.g., PCs, smart phones) which is accessing more than one Network (e.g. 3G, WLAN) shall be allocated to these Networks based on use time Impact from shared Network resources (e.g., transmission equipment, core nodes and data centers) shall be allocated to an access network based on data traffic 27 © 2011 – Proprietary and Information of ETSI 27

Life Cycle Inventory - Allocation rules for Network data to Services Data for End–users– and home/CPE equipment: to be allocated based on active use time of the Service Data for transport equipment: to be allocated based on data traffic The data center(s), where the Service is operated, as well as the Service provider activities shall be allocated based on number of subscriptions and Service users 28 © 2011 – Proprietary and Information of ETSI 28

Life Cycle Impact Assessment The baseline model of 100 years of the IPCC (GWP100) LCIA method is mandatory (shall) as mid–point impact assessment indicator for climate change. For other mid-points Impact Assessment Categories than Climate Change and Ozone Depletion there are several Category indicators developed. If these mid–points are included in the study scope the ILCD Handbook shall be followed as close as possible. Also for best End-point assessment practise the ILCD Handbook for LCIA shall be consulted. 29 © 2011 – Proprietary and Information of ETSI 29

Life Cycle Interpretation - how robust are the results and conclusions? The challenge of the completeness check is to overcome the paradox of evaluating the degree of completeness of the product system when not knowing 100% of it. If two or more ICT Equipment, Networks or Services LCA results do not differ significantly there is a risk of erroneous interpretations. The significance is determined for instance by magnitude in difference, modeling assumptions, and LCA software program calculation algorithm. 30 © 2011 – Proprietary and Information of ETSI 30

Comparative LCA between ICT and business as usual (BAU) systems - reduction potential LCAs with the same goal&scope, system boundaries and functional unit need to be performed for both the ICT Service and the BAU Service it replaces Especially as identical as possible system boundaries for the Raw Material Acquisition and Production Phases. For the BAU Service the associated environmental impacts shall be estimated according to travel and infrastructure first order effects. The first order effects are those directly attributable to the Services. The reduction potential is the second order effect. Rebound effects are outside the scope. 31 © 2011 – Proprietary and Information of ETSI 31

Comparative LCA between ICT and business as usual (BAU) systems - Example Travel Paper usage Buildings PCs Data centers BAU Service 30,000 200 ICT Service 15,000 100 Reduction potential = ICT Service – BAU Service 15,000–30,000 = –15,000 tons/year –100 tons/year 0 tons/year +200 tons/year TOTAL reduction potential –14,700 tons/year 32 © 2011 – Proprietary and Information of ETSI 32

Reporting Common ways of reporting  increase transparency and a proper basis for interpretation of results. The following shall be transparently reported and motivated: Operating lifetime Cut–off Allocations Data sources 33 © 2011 – Proprietary and Information of ETSI 33

Reporting – ICT Equipment 34 © 2011 – Proprietary and Information of ETSI 34

Reporting – ICT Equipment 35 © 2011 – Proprietary and Information of ETSI 35

Reporting – Networks 36 © 2011 – Proprietary and Information of ETSI 36

Reporting – Networks 37 © 2011 – Proprietary and Information of ETSI 37

Reporting – ICT Equipment, Network and Service 38 © 2011 – Proprietary and Information of ETSI 38

Reporting - Mandatory set of parts for LCA of ICT equipment. 39 © 2011 – Proprietary and Information of ETSI 39

Reporting - Mandatory set of parts for LCA of ICT equipment - ICs 40 © 2011 – Proprietary and Information of ETSI 40

Reporting - Reporting format for included life cycle stages, activities and generic processes 41 © 2011 – Proprietary and Information of ETSI 41

Reporting - Reporting format for raw materials 42 © 2011 – Proprietary and Information of ETSI 42

Reporting - Reporting format for Parts production 43 © 2011 – Proprietary and Information of ETSI 43

Contact anders.andrae@huawei.com © 2011 – Proprietary Information of ETSI