International Telecommunication Union ITU-T Study Group 5 The need for special requirements Tetsuya Tominaga Technical Session on Home Networks Geneva,

Slides:



Advertisements
Similar presentations
Introduction to Silicon Protection Array Devices.
Advertisements

Safety Testing of Medical Electrical Equipment
As a stand-alone overview of test tools.
Electricity Chapter 13.
International Telecommunication Union Seminar on Impact of Electromagnetic Field Emissions Kampala, Uganda, 3-5 September 2003 ITU-T Study Group 5 Publications.
ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva ITU-T Technical Session Lightning Protection Highlights &
International Telecommunication Union ITU-T SG 5 Technical Session Lightning protection 12 December 2005, ITU Headquarters, Geneva Risk assessment for.
International Telecommunication Union Technical Session on Home Networks Geneva, 29/04/2011 ITU-T Study Group 5 Protection against Lightning Phil Day Australia.
International Telecommunication Union Geneva, July 2009 Electrical Safety and Electromagnetic Compatibility Ahmed ZEDDAM, ITU-T SG 5 Chairman (France.
International Telecommunication Union ITU-T Workshop Lightning Protection Technical Session December 2005, Geneva, Switzerland Risk assessment for.
Summary of Results Study Period ITU-T Study Group 5 Protection against electromagnetic environment effects in telecommunications Roberto Pomponi.
Standards for the protection of radio installations
Relevant ITU-T Recommendations for the Protection of Base Stations
Nairobi, Kenya, 26 – 27July 2010 Maintaining Equipment Standards to ensure good QoS Mwende Njiraini Engineer I/NT/LCS Communications Commission of Kenya.
Earthing of MV and LV Distribution Systems: A multi-faceted problem.
ITU-T Study Group 5 “Environment and Climate Change”
Committed to connecting the world Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti Adviser, ITU-T Study Group 5.
New Energy Horizons Opportunities and Challenges Low Voltage Grid Connections for Electric Vehicle (EV) Infrastructure in Europe Presented by Philip LeGoy.
Advanced Protection Technologies
Committed to connecting the world Ninth ITU Symposium on ICTs, the Environment and Climate Change Kochi, India, 15 December 2014 Damage prevention and.
DEHN + SÖHNE Lightning and Surge Protection according to IEC 62305
EE4503 Electrical Systems Design
Protection against Lightning Overvoltages Overvoltages due to lightning strokes can be avoided or minimized in practice by (d) shielding the overhead lines.
© 2012 DEHN + SÖHNE / protected by ISO Site visits to Botas Lightning and Surge Protection 1.
International Telecommunication Union ITU-T Study Group 05 Damage to equipment in Japan Tetsuya Tominaga Technical Session on Home Networks Geneva, 29/04/2011.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Lesson.5: Fuses and Safe Plugs
Overvoltage Protection, A. Zeddam, Dakar, Senegal, 25 March 2015 ITU Regional Standardization Forum For Africa Dakar, Senegal, March 2015 Overview.
White Papers – publication: IEEE PES Transactions – note these papers are not overly technical, may not be appropriate placement. T&D World – good audience.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti, Adviser, ITU.
Overvoltage protection (surge arrester)
Mains electricity Revise the following Direct and alternating current 3-pin plugs and electrical cable Safety – fuses and earth wire Period and frequency.
All rights reserved Surge Arrester.
International Telecommunication Union ITU-T SG 5 Technical Session “Lightning protection” 12 December 2005, ITU Headquarters, Geneva Risk regarding safety.
What makes substation work?
CHAPTER 6 EARTHING SYSTEM.
Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen,
Summary of Results Study Period ITU-T Study Group 5 Environment and Climate Change Mr Ahmed Zeddam.
Lesson 6 Voltage Do we need to MEASURE it? OR Do we need to DETECT it?
Electric Circuits Series and Parallel Circuits. Circuit Diagrams An electric circuit is a complete path through which charge can flow Circuit diagrams.
Physics Module 2 Mains Electricity. What do you need to know Voltage and frequency of UK mains electricity Wiring of a 3-pin plug Properties of materials.
Bell Work 1.What is the equation for resistance? 2.What happens to the current if the voltage is doubled? 3.What happens to the current if the voltage.
International Telecommunication Union ITU-T Study Group 05 The model testing/simulations Yasuhiro Honma Technical Session on Home Networks Geneva, 29/04/2011.
Electrical Installation II1 Assessment of General Characteristics (Note: All the mentioned tables in this course refer to, unless otherwise specified,
Submitted To:- Submitted By:- Mr.
Presented by: Nguyen Phan Thanh Southern Taiwan University of Science and Technology.
Institute of Electrical Power Systems Institute of High Voltage Engineering and Systemmanagement NEW WAYS TO INTEGRATE GROUNDING, EQUIPOTENTIAL BONDING,
Eleventh ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia, 21 April 2016 Damage prevention and safety Requirements for.
ITU Symposium on ICTs, the Environment and Climate Change Kuala Lumpur, Malaysia 21 April 2016 Session2: Damage prevention and safety Resistibility of.
Developing Cabling Module Situation at August 2006 Vello Vanem.
Committed to connecting the world Overview of ITU-T SG5 Work on Damage protection and safety Guy-Michel KOUAKOU Chairman of Study Group 5 Regional Group.
Electrical Power II Unit 4-Overvoltages Unit 5-HVDC Unit 6-FACTS.
High Voltage Engineering
Graz University of Technology May 11th – 12th Maribor, Slovenia
v1/2011 Strikesorb Protection Solutions
A SEMINAR ON LIGHTNING ARRESTER
High Voltage Engineering
WORKSHOP PRACTICE WEEK-5 OBJECTIVE OF LAB-5 Introduction to digital multimeter and its measuring method. To be familiar with the connections of.
Design of Electric Power Systems and Utilities
Electrical Safety in the Home
Data Line Gas Capsule Protectors
EET 323 – Electrical System Design Lecture 9: Grounding
The Safe Use of Electricity
Protection against over voltages
A. Touching both terminals with the hands can cause electrical shock
Protecting Your Shack From Lightning (as best you can)
P2 - Physics Mains Electricity.
Grounding Myths.
Presentation transcript:

International Telecommunication Union ITU-T Study Group 5 The need for special requirements Tetsuya Tominaga Technical Session on Home Networks Geneva, 29/04/2011

ITU-T Study Group 05 AC mains plugs in global o There are many plugs in the world o There is no earth terminal in Japanese type Technical Session - Home Networks - Geneva JAPANESE TYPE

ITU-T Study Group 05 Japanese customer premises AC power o Voltage: 100 V rms o Frequency: o 50 Hz Eastern Japan o 60 Hz Western Japan o Configuration: TT Technical Session - Home Networks - Geneva Each PE has each grounding rod

ITU-T Study Group 05 Smart House is Connected House 4 7/3/2011 TTC WorkShop SPD Surge Protective Device Optic Fiber Smart Meter Many kinds of equipment will be connected each other under the TT system.

ITU-T Study Group 05 Bad installation and insufficient resistibility 5 7/3/2011 TTC WorkShop SPD Surge Protective Device Optic Fiber Smart Meter Good installation and Adequate resistibility are needed.

ITU-T Study Group 05 Philosophy of protection 6 7/3/2011 TTC WorkShop SPD SPD Surge Protective Device Optic Fiber SPD Good Bonding (K.66) Additional Protection (K.66) Adequate Resistibility (K.21,K.44,K.66,K.71,K.hnwr) Classification of interface (K.75) Good installation and Adequate resistibility of equipment Who knows K.66? Is Japanese type grounding configuration special?

ITU-T Study Group /3/2011 TTC WorkShop Yes No Determine the power induction limits Identify the equipment and the number and type of ports Does the equipment have more than one port type? Enhanced Are there unique problems requiring high isolation values? No Yes Special Basic Are the power induction limits > 600 V? Yes No Figure 1/K.hnwr - Flowchart for determining required level of resistibility Selection for Required resistibility (K.hnwr/Draft) Bad bonding configuration (K.66 For example, the bonding wire length >1.5m ) 5.2 Resistibility Recommendation K.21 has two levels of resistibility basic and enhanced. Specification EN 50468:2009 gives advice on the selection of basic and enhanced. EN 50468:2009 advises: For equipment having only external telecommunication ports the resistibility requirements are defined in ITU-T K.21Basic level. For equipment having additional connections to networks e.g. power networks, the test levels are defined in ITU-T K.21 Enhanced level The required level of resistibility can be determined in Figure 1/K.hnw. Information on Special requirements is contained in K.44. When the bonding configuration is not along with K.66

ITU-T Study Group 05 Proposal: Special Resistibility (K.44, K.66,K.hnwr) TEST Telecom municati on line longitudi nal Telecom municati on line transvers e Mains power longitudi nal Mains power transvers e Telecom municati on line – Internal port Mains power – Internal port Telecom municati on line – Mains power line Internal tel. Port – Internal tel. Port Internal tel. Port (L1-L2) Internal Ether Port Internal USB Port Coax. Port Lightnin g Surge Test 13 kV 10/700 4 kV 10/ kV combina tion 13 kV 10/ kV combina tion 13 kV 10/ kV combina tion 10 kV combina tion 4 kV Combin ation Current limit resistor = 50 10kV ?? 6 kV ?? 6.42kA 10/350 K.75 For SPD Technical Session - Home Networks - Geneva Table II.6-1/K.44 – Resistibility and safety requirements of customer premises equipment powered by mains power The special level is already described in K.44 and K.66. The external port is optical fibre now. So, All telecom. Ports are Internal The proposal is adequate Internal port test levels Proposal Under Study

ITU-T Study Group 05 Concideration Coordination of protecters and Safety and Lightning protection are important. 9 7/3/2011 TTC WorkShop A N E Un safe method Class II without earthed SPDs A N E Safe method Class II with earthed SPDs Safety and lightning Protection in no earth FUSE Safety = Breaking Fuse Minimize of Damage ratio = No Breaking Fuse SPD2 SPD1 The impedance is need for coordination between SPDs V0 V1 V2 Coordination of protection o Resistibility of inherent ICs or circuit is becoming smaller, so it becomes more difficult to prevent the damage. o No Earth is Un safe?

ITU-T Study Group 05 Bypass circuit and Safety standard o Conflict between Safety standards (e.g. IEC 60950) and Lightning protection (Recommendation K.66 and so on). Bypass circuits between AC mains and telecom ports described in K.66 should be permitted in any case to protect telecommunication equipments against overvoltages. The protector operate voltage would be higher than the insulation test voltage. Unfortunately the safety standards, e.g. IEC 60950, do not allow voltage limiters to bridge supplementary insulation, double insulation or reinforced insulation. Technical Session - Home Networks - Geneva TD566 is describe in detail, please read them.

ITU-T Study Group /3/2011 TTC WorkShop Conclusion o If we are to prevent damage to HNW equipment we need: Adequate resistibility of equipment Special resistibility of equipment, when the equipment can not be controlled the installation environment. Correct classification and use of ports Good installation practices Correct earthing and bonding Protection for external and internal ports as necessary.