1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,

Slides:



Advertisements
Similar presentations
CBP BMP Verification Program Development: Requests for Decisions on Panel Membership and Revised Schedule CBP Partnership Management Board September 13,
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Overview of CWA Section 316(a) Evaluations of Power Plants with Thermal Discharges in Maryland Presented at EPRI Workshop on 316(a) Issues: Technical and.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
1 CPV Maryland, LLC St. Charles Facility – an Update Sandra S. Patty PPRP Manager PPRAC Meeting Country Inn & Suites, Annapolis, MD August 26, 2008.
Corridor #5 Update United States Senate Briefing September 26, 2007.
1 11 Public Service Commission Update on Utility Issues: Reliability and Infrastructure Upgrades, Advanced Metering Issues, and Related Matters Briefing.
New Transmission Lines Update 1 Sandi Patty, PPRP September 27, 2010 Image or Graphic.
Career and Technology Student Organizations An integral part of CTE success William Nottage, State Director DECA/FBLA Division of Career and College Readiness.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Keeyask Generation Project Environmental Assessment Process Tracey Braun, M. Sc. Director, Environmental Approvals Branch Conservation and Water Stewardship.
Wind Energy in Maryland. Onshore Utility Scale MEA continues to work to facilitate development of utility scale wind energy projects in Maryland. The.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008.
RECYCLING RESOURCES ECONOMIC OPPORTUNITY ACT HB AND TECHNOLOGY ADVANCEMENT GRANTS SB STAKEHOLDER UPDATE July 2007.
Transmission interconnect into the existing ‘Durbin-Monterey’ 69kV line 
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
HB 2 Process Update Policy Committee Meeting September 21, 2015.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
BAXTER COMPREHENSIVE PLAN Joint Commission/City Council Meeting August 25, 2014.
Maryland STEM Portfolio Project (MSPP) Problem Based Learning Geospatial Technologies ePortfolio & Web 2.0 Tools.
Transportation Improvement Program Status and Update.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
CPPP Stakeholder Meeting Springfield, Missouri November 18, 2010 Associated Electric Cooperative Inc.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Maryland How the Eastern Shore is different from the rest of the state. By Mr. Warner September, 2012 "Flag of." Image. CultureGrams Online Edition. ProQuest,
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Work Related to Senate Bill 2202 (effective January 1, 2001)
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
North Metro Competitive Procurement RTD Board FasTracks Monitoring Committee October 8, 2013.
Planning Conference on Maryland’s Energy Future Dan Ervin Ph. D., Director, ShoreENERGY™ The Energy, Economic and Sustainability Program of the Franklin.
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
FY 2018 Budget Review Process and Schedule
The Oakton Condominium Association September 12, 2017
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Proposed Bay TMDL Schedule
CPUC Rate Proceedings Relevant for TOU
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
FBC Code Development 6th Edition (2017).
College of Alameda Integrated Planning and Budgeting Process
Environmental Assessment PUC Application Process
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Strategic Planning Timeline Overview
WI Act 185 Implementation Update
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Indiana Department of Environmental Management Office of Water Quality
2015 January February March April May June July August September
Presentation transcript:

1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis, MD August 26, 2008

2 Transmission Licensing in Maryland Pre-application –Early and often communication encouraged –Preliminary issues are identified and provided to State Agencies Filed Application –Coordinated review by the State Agencies –Results in cohesive State recommended licensing conditions –Evidentiary hearing process takes place and public meetings are held PSC Responsibilities –Review the State Agencies’ recommendations –Issue a final order granting or denying the CPCN

3 Proposed Projects Mid-Atlantic Power Pathway (MAPP) – Pepco Holdings, Inc. Potomac-Appalachian Transmission Highline (PATH) – Allegheny/AEP Joint Venture Other Transmission Projects –Urbana Electric Capacity Upgrade – Allegheny –Raphael Road to Bagley Rebuild – BGE –Holland Cliffs to Helen Creek Rebuild – SMECO

4 Pepco Holdings, Inc. (PHI) 230 miles of 500-kV line through VA, MD, DE, and NJ –Affected counties in MD: Charles, Calvert, Prince George’s, Dorchester, and Wicomico 177 miles (over 75%) planned on or near existing ROW –Entire portion through Southern MD on existing ROW –PHI will obtain new 200-foot ROW in Dorchester Co. Two 230-kV lines also planned (in Dorchester and Wicomico Co.) –To address local reliability issues –Not yet approved by PJM Water crossings planned: –Potomac, Patuxent, and Nanticoke Rivers –Chesapeake Bay (approx. 8 miles from Calvert Cliffs to Dorchester Co.) Option to include a DC line (in lieu of AC) from Calvert Cliffs to Vienna is currently being considered Advantages over AC system, but significant project cost increase

5 Pepco Holdings, Inc. (PHI) (continued) Public Outreach –Five public meetings held in Dorchester County during May/June 2008 –Regularly attending monthly Joint Evaluation meetings to provide project updates Schedule: –Final routing in Dorchester Co. to be completed this fall Followed by second round of public meetings –PHI plans to file its application in phases Possum Point to Calvert Cliffs (S. MD) portion filed by end of 2008, likely by September and completed by 2011 Eastern Shore to Delaware portion filed by 2 nd quarter of 2009 and completed by 2013 Website:

6 Allegheny/AEP Joint Venture 244 miles of 765-kV line –John Amos to Bedington substations (WV) 46 miles of twin-circuit 500-kV lines –Bedington to a proposed substation near Kemptown, MD (southeast of Frederick) –The circuits will be separated and will follow different routes Affected counties in MD: –Washington and Frederick Allegheny has identified draft routing “segments” –Includes crossings of Appalachian Trail and the C&O Canal –Maps available on-line:

7 Allegheny/AEP Joint Venture Public Outreach - Maryland –Frederick and Washington Counties –2 rounds of Stakeholder Siting Meetings held in June and July –Public open house meetings in mid-June and early August –Technical Need Conference in Baltimore – July 17, 2008 Schedule: –Routing study to be completed in November 2008 –Application to be filed by December 1 st –Target date for completion is June 2012

8

9 Other Transmission Projects Urbana Electricity Upgrade (Allegheny Power) –Located in Urbana, MD (near Frederick) –Proposed project filed in 2004; PSC denied CPCN request in 2005 with order instructing Allegheny to begin immediate development of an energy solution for Urbana –PPRP served as a resource to a small group of stakeholders that met throughout January to June –Public meetings held in March and April –Project currently on hold; possible coordination with the PATH project

10 Other Transmission Projects (Cont.) Raphael Road to Bagley Rebuild (BGE) –Upgrade of 6 miles of transmission facilities –From Raphael Road substation to proposed Bagley substation (northeast of Baltimore) –Single-circuit 230-kV lines upgraded to double-circuit 230-kV –Rebuild within existing ROW; however, passes through Gunpowder Falls State Park –Application filed May 2, 2008; project currently being reviewed –DNR testimony is due October 1, 2008

11 Other Transmission Projects (Cont.) Holland Cliffs to Helen Creek Rebuild (SMECO) –Upgrade 69-kV lines to 230-kV from Holland Cliffs to proposed Helen Creek substation –Project occurs within existing ROW; however, requires a new crossing of the Patuxent River near the Thomas Johnson Bridge –Designed to create a continuous “loop” of electricity service around SMECO’s service area –Application to be filed late October/early November 2008

12 NIETC Update Has been significant opposition to the federal designation U.S. Senate Committee on Energy and Natural Resources hearings held on July 31, 2008 –Hearing requested by 14 bipartisan Senators –Testimony submitted by numerous environmental and government groups –Main issues of concern: Loss of reasonable process Disincentives for alternative energy Higher utility rates No action expected soon – Senate on summer break