Joint Venture in construction company in West Bank.

Slides:



Advertisements
Similar presentations
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Advertisements

Fawzy Al-Alami G Term Paper.  Introduction.  Effect of Teamwork in Design-Build. Construction Contract.  Factors Can Enhance Design-Build.
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
Brought to you in association with The Benefits of Strategic Partnership.
Standard 4: Analyze the Concept of Entrepreneurship EQ 4.01 Research characteristics of successful entrepreneurs.
Introduction to Business
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Basic Business Structures. Overview  Most farming or ranching businesses are conducting business as sole proprietors.  But as farms evolve and adapt.
Chapter 14 Entry Strategy and Strategic Alliances
Viewpoint Consulting – Committed to your success.
STRATEGIC ALLIANCES ISSUES F Stability and risk F Failure rate of 30 to 60 percent F Even profitable alliances can be torn by conflict.
Challenge Questions How good is our operational management?
Purpose of the Standards
ENTR 452 (Business Plan Slides, Chapter 7)
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
INTERNATIONAL LAW PARMA UNIVERSITY International Business and Development International Market and Organization Laws Prof. Gabriele Catalini.
STRATEGIC ALLIANCES ISSUES F Stability and risk F Failure rate of 30 to 60 percent F Even profitable alliances can be torn by conflict.
Principles of Business, Marketing, and Finance Forms of Business Ownership Copyright © Texas Education Agency, All rights reserved.
Joint Business Plan Madhurjya K. Dutta 1mk_dutta Sept 2010.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
Chapter © 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or.
Public Private Partnership formation challenges and criteria for success Workshop FDOV/Sustainable Enterpreneurship and Food Security Facility (18 and.
> > > > Options for Organizing Small and Large Businesses Chapter 5.
Learning Goals Know why companies use distribution channels and understand the functions that these channels perform. Learn how channel members interact.
Ch. 5-2 Forms of Ownership.
1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University.
Connolly – International Financial Accounting and Reporting – 4 th Edition CHAPTER 30 JOINT ARRANGEMENTS.
Joint Forum of Financial Market Regulators Forum conjoint des autorités de réglementation du marché financier Guidelines for Capital Accumulation Plans.
Chapter 6. What are the three main forms of business organization, and what factors should a company’s owners consider when selecting a form? What are.
Technology preparation and conclusion of foreign trade turnover. Selection of the foreign partner..
The Challenges of Managing Microinsurance Schemes in Uganda Objective to analyze the challenges of managing micro- insurance schemes in Uganda. (i) Introduction.
AB209 Small Business Management Unit 2 – Getting Started: From Idea to Business Venture.
By Team … Title IntroductionAgendaAlternativesProblemConclusionRating.
Chapter 8 International Strategic Alliances
Chapter Fifteen The Research Report 15-2 Key Terms & Definitions Organizing the Report: 1.Title Page 2.Table of Contents 3.Executive Summary 4.Background.
CE 726 STRATEGIC CAPABILITY. ASSESSMENT OF STRATEGIC CAPABILITY.
INSTRUCTOR'S MANUAL Chapter 3 ESTABLISHING A BUSINESS.
INTRODUCTION TO FINANCIAL MANAGEMENT. FINANCIAL MANAGEMENT “ Financial management is that managerial activity which is concerned with the planning and.
Feasibility Study.
Chapter Twelve Copyright, John Wiley and Sons, Inc. Building and Managing Global Strategic Alliances GSA: Motorola and Siemens AG Semiconductor 300 (SC300)
Chapter 8 International Strategic Alliances. Introduction What is meant by Strategic Alliance? Purposes of Strategic Alliances Success Factors Mistakes.
Flow of presentation Who is entrepreneur?
Reflections on the Peer-to-Peer Learning Process Warren Van Wicklin (WBI consultant) December 1, 2009.
Continual Service Improvement Methods & Techniques.
Presented by Evans[088805], Naftali[089179] And Ronnie[088254]
Forming or Joining a Group of Schools: staying in control of your school’s destiny.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Copyright © 2009 Pearson Education, Inc. publishing as Prentice Hall 14-1 Part Two Global, Strategy, Structure, and Implementation Chapter Fourteen Direct.
1 Review Chapter 3b Instructor Shan A. Garib, Winter 2013.
Pros and Cons of Joint Ventures in India. Get a permanent registration number with fcra registration to get benefits of foreign contribution and find.
Types of Business Structures
Application Outsourcing: Achieving Success & Avoiding Risk
Chapter 7 International Strategic Alliances
CHAPTER 9 Cooperative Strategy
The Application of Legal Principles in Business
Review From the previous chapter, we understand that maintenance policy stream down from corporate strategy. It has to be integrated with management so.
Corporations and Trusts Law Chapter 3 Choosing a Business Structure
Entry Strategy and Strategic Alliances Chapter 14
Causes Of Contractors’ Failure In West Bank
Chapter 7 International Strategic Alliances
PRESENTED BY : Mrs.SWATI.V.GAVASANE
Module 5 The Climate Expert and your role as a consultant
Topic 2 : Cross Border Interdependence : Growth of Strategic ship Technology Partnership.
Transfer of Medical Devices Manufacturing Technology
Chapter Fifteen: 15.1 INTERNATIONAL JOINT VENTURES
Chapter 7 International Strategic Alliances
Factors Affecting Bid/No Bid Decision Making IN The West Bank
STRATEGIC SYNDICATE 4 ALLIANCES. TWC STRATEGIC ALLIANCE WHAT IS STRATEGIC ALLIANCE 2 Strategic alliances are agreements between two or more independent.
CEng progression through the IOM3
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Joint Venture in construction company in West Bank

Objectives Outline : Conclusion Recommendation Discussion Introduction Data collection and analysis Research methodology

Objectives determine risk factor and success factor and investigate benefits of JV. between contractors determine risk factor and success factor and investigate benefits of JV. between contractors minimize the risk and conflict between the parties, make useful guidelines for the contractors to know how to take joint venture decision, The main objectives of this project are:

Introduction Construction industry is one of the most common and important industries in Palestine as in all of the world, the construction project become more large and complex due to development of the world, from here appear the idea of joint ventures in order to share the risk and benefits of the complex and large projects between different companies which form the joint venture.

A joint venture is a speculation for profit in which the risks and rewards are shared by two or more Companies which have formed in association to combine their expertise, capital, property, skills and knowledge in order to execute a specific project.

Research methodology Data collection and analysis Discussion Conclusion Recommendation

Data collection We collected data by questionnaire and interviews with contractors and companies and these data will be analyzed to rank the success factor and risk factor and discover what has the most impact on the project and who is responsible on each factor. The sample was 63 contracting companies in Jenin and Ramallah in all classification and in all sectors. About 60% of these companies responded to the questionnaire and gave information about their experience in joint venture; the other companies did not provide us any information.

questionnaire The questionnaires contain two parts, the first part is about the experience of the company in joint venture, and the second part contains the factors that affect in joint venture project. scale will be used from (1 to 10) to determine which factor is responsible for, number 1 means not important and number 10 means extremely important. Questionnaire link

Data analysis

Discussion Joint Venture in West Bank has different opinions where some contractors encourage entering into joint venture because J.V. can help the companies to overcome the risk in different market, large project and new project. But there is another part of contractors do not prefer J.V. and says “We can use prime/ sub arrangement if the project is large, because it make a better line of communication and clear responsibility statement”.

when the companies decide to enter joint venture they choose the partner primary according to: financial strength reputation and the contractor must confirm that the partner is committed to (and is capable of) bringing the required financial and technical strengths to the project will ensure that the reasons for joint venturing are not in vain.

The formation process of joint venture is complex, as are the projects that cause the formation. The result is the need for a flexible, and a lot of hard work to keep the partnership together. One of the respondents from its past experience in the JV project says “due to the current status of West Bank I do not prefer to enter in JV. Arrangement since there are some problems can appear at the end of projects such as Income tax, value added tax and tax recovery.

Conclusion The joint ventures between construction companies is very important to overcome problems facing the contractors such as inadequate work opportunities, weak financial capability, lack of equipment and lack of management skills. The usual purpose of joint venture is to share risk in large projects and to pool resources in a way that permits to execute a project. In the planning for a joint venture arrangement, it is important to consider all important factors in order to deliver a project successfully. Result table link

Recommendation From the conclusion there are important risky and challenger factors facing joint venture arrangement, there is no specific method to overcome this factors, but good management and experience will lead to avoiding these problems as much as possible, some tips will be recommended to overcome some of these problems.

1.The JV Agreement must be clear and comprehensive in critical areas, such as liabilities for the individual partners; type and value of contributions; method of assessing the values; management structure, control, and decision-making process; and profit distribution policies.

3.Use experienced and familiar subcontractors and supplier and employ unbiased and experienced staff, Maintain good contact, Allocate work to partner according to his ability, Conduct detailed feasibility study of project. 2.Select credit-worthy and financially strong partner, selecting a suitable partner is based on its experience, reputation, and particular strengths to undertake such a project.

4.To overcome the potential misunderstandings and coordination difficulties that can arise from differences in managerial or organizational practices, the main points are: Contractor’s proper planning, Contractor’s good site management, Adequate contractor experience, Adequate client’s finance and payments for completed work and, Good communication between parties and Cooperation