IFB FQ15233 NEPP Electrical and Data Cabling Installation Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation.

Slides:



Advertisements
Similar presentations
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/Contract Number – IFB FQ13092/ER September 3, :00 PM JGB 4B-01 Purchase.
Advertisements

U.S. Pretrial Services and Probation Office Northern District of Ohio.
Section 3 Steed Robinson – Office of Community Development  9/4/2014.
Construction Program Update EEO and DBE
Enterprise Medicaid System Project Management Request for Proposal 13-6 Pre-Proposal Conference July 19, 2012 Teresa Deaton-Reese Department of Administration.
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
IFB FQ15096 SUPPLY, DELIVERY, AND INSTALLATION OF THE PORTABLE JACKS Washington Metropolitan Area Transit Authority IFB-FQ15096/ER SUPPLY, DELIVERY, AND.
REPAIR ELECTRICAL DISTRIBUTION SYSTEM TO THE COMMUNICATION BUILDING Site Visit March 12, 2015 NASA Armstrong Flight Research Center 1.
RFP CQ15116 – RCF Security Services, Revenue Collection and Processing Pre-Proposal Conference December 19, 2014.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
Improving Understanding, Function and Procedural DBE Compliance ODOT OCR DBE Triage Training Office of Civil Rights DBE Program ODOT Training March 1,
PRE-BID CONFERENCE CONVEYANCE SYSTEMS OPERATIONS AND MAINTENANCE SERVICES BEST VALUE BID NO: S33-L25071 Conley Jackson Sr. Procurement Specialist Strategic.
2014 CDBG Applicants' Workshop Section 3 Overview (see also DCA Policy– Appendix R)
Communication Equipment and Parts Solution for the Indiana Office of Technology Pre-Proposal Information Session December 15, :30AM Frank Poole,
Procurement 101: “Learning the Ropes”. Goal Introduce  City of Dallas’ Business Development and Procurement Services (BDPS) department ■ ResourceLINK.
1 Acquisition Office SYMTRAC TM – The Importance of Compliance presented by Evita J. Fields.
STATEWIDE INITIATIVE TO BE CONSISTENT TO BE PREDICTABLE TO BE REPEATABLE.
ABCs of the DBE Program for General Aviation Airports Association of California Airports South Lake Tahoe, California September ,
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
1 Doing Business with the University of North Texas System September 2015.
IDEM/OWQ Laboratory Analytical Services Pre-Proposal Conference December 5, 2011 Adam Thiemann IDOA Strategic Sourcing Analyst.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
PRE-PROPOSAL CONFERENCE ARBITRAGE CALCULATION SERVICES FOR THE OFFICE OF THE CITY CONTROLLER July 7, :00 P.M.
Click to add text Dealer Pre-Qualification Information Session STATE OF MICHIGAN Department of Technology, Management and Budget Purchasing Operations.
Courier Services Request for Proposal Pre-Proposal Conference February 17, 2011 Chad Johnson Department of Administration.
Senator Charles E. Shannon, Jr. Community Safety Initiative (LARP) Bidders Conference Executive Office of Public Safety and Security, Office of Grants.
Los Angeles Unified School District Facilities Services Division Small Business Enterprise (SBE) Policy & Program.
Indiana State Personnel Dept. CDL/Non-CDL Controlled Substance and Alcohol Testing Pre-Proposal Conference September 24, 2012 Greg Moorman IDOA Strategic.
PRE-PROPOSAL CONFERENCE CUSTOMER SERVICE EDUCATION PROGRAM FOR DEPARTMENT OF PUBLIC WORKS AND ENGINEERING May 7, :00 AM.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
INDIANA DEPARTMENT OF ADMINISTRATION ASSISTIVE TECHNOLOGY REQUEST FOR PROPOSAL on behalf of DIVISION OF DISABILITY & REHABILITATIVE SERVICES.
WMATA Project Implementation Manual (PIM) Stage 3, Construction Chapter 200, Authority Representative, Responsibilities and Functions Presenters: David.
External Grantee Evaluation Services RFP Pre-Proposal Conference March 17, 2011 Kyle McClurg, IDOA Strategic Sourcing Analyst.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
IAS Pre-proposal Conference NOVEMBER 2, 2011 Pre-proposal Conference NOVEMBER 2, 2011 Tahoma NATIONAL CEMETERY PHASE 2 DEVELOPMENT KENT, WASHINGTON Project.
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
IAS Pre-proposal Conference December 10, 2012 Pre-proposal Conference December 10, 2012 San Antonio bldg 1 & 4 Renovation san antonio, tx Project no: San.
October 2, 2015 REQUEST FOR PROPOSAL (RFP) 7012 ADMINISTRATIVE SERVICES ORGANIZATION COUNTY OF SAN DIEGO, HEALTH AND HUMAN SERVICES AGENCY PRE-PROPOSAL.
Presented by: CCSD Procurement Services Department How to do Business with the Cobb County School District 1.
Federal Acquisition Service U.S. General Services Administration Area Facility Operation Specialist (aFOS) 88 th Regional Support Command Pre-Bid Meeting.
1 WELCOME This is for RFP 7227 ONLY Restrooms Cell Phones Turn on vibrate Take calls outside Sign in sheets – please sign in Conference will focus on.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Department of Veterans Affairs Network Contracting Office (NCO) 21 Repair Building 1A Data Cables Pre-Proposal Conference and Site Walk Construction Request.
PRE-PROPOSAL CONFERENCE COMMUNITY LIVING CENTER CULTURE AND SAFETY IMPROVEMENTS VA R-0961 PROJECT: 654-CA-317 MAGNITUDE: $5 - $10 Mil 8/27/2012.
Vera Konstantinova, Procurement Contracting Officer September 8, 2015 REQUEST FOR PROPOSAL (RFP) 7045 INDEPENDENT LIVING ASSOCIATION PROJECT COUNTY OF.
Vera Konstantinova, Procurement Contracting Officer July 16, 2015 REQUEST FOR PROPOSAL (RFP) 6922 IN-HOME OUTREACH TEAMS AND ASSISTED OUTPATIENT TREATMENT.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Inspection, Testing, and Maintenance of Fire Protection and Life Safety Systems.
Procurement & Strategic Sourcing
ELECTRICAL AND DATA CABLING, PHASE 2
Pre-Bid/Proposal Meeting
Pre-Proposal Conference for three separate solicitations
Construction Oversight
REPAIR FALL PROTECTION PROJECT
PRE-PROPOSAL CONFERENCE
TRAVEL SERVICES Request for Proposal
Joint Parking Task Force Update Procurement & Strategic Sourcing
Washington Metropolitan Area Transit Authority (WMATA)
Opening Remarks Silence all Cell phones and pagers
Department of Community Development
Digital Wall Scapes & Display Terminals
Request for Proposal and Specifications for
THE WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
MANDATORY PRE-BID MEETING
Washington Metropolitan Area Transit Authority (WMATA)
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
Diversity management system (DMS)
Procurement & Strategic Sourcing
Procurement & Strategic Sourcing FPM ART GALLERY DESIGN SERVICES
Presentation transcript:

IFB FQ15233 NEPP Electrical and Data Cabling Installation Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation Pre-Bid Conference Invitation For Bid (IFB)/Contract Number – FQ15233 September 3, :00am-12:00pm EST 955 L’Enfant Plaza – Room 5300

Opening Remarks  Silence all Cell phones and pagers  No Recording  This presentation and attendee list will be provided on WMATA.com website Safety Tip: “Safety Harnesses – Tie or Die; Take the right precautions to prevent falls”  Safety Tip: “Safety Harnesses – Tie or Die; Take the right precautions to prevent falls” Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

 Errol Roper, Contract Administrator, PRMT  Michael Glimp, Contract Administrator, PRMT  Terri Anomnachi, Project Manager, NEPP  Jyotindra Shaw, Project Manager, IRPG  Khizgilov, Vadim, Construction Engineer. IRPG  Elena Almonte, Office Engineer, IRPG  Ernest Hunter, DBE Compliance Specialist, PRMT  Robin Hahn, Quality Assurance, QAAW  Jim Stewart/Carmen Pelham, RISK  Ernest Hunter, DBE Specialist, PRMT  John Cribben, SAFE Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation Introduction of WMATA Personnel

PURPOSE Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation  To promote a common understanding of:  IFB – NEPP Electrical and Data Cabling Installation Authority’s requirements Solicitation Instructions  To provide answers to questions regarding the IFB  Networking opportunity

After today’s conference, if you have additional questions, they must be received via electronic mail by the Contracting Officer. your questions to: com- by Friday September 11, 2015, NLT 4:00pm. Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation PURPOSE

The Pre-Bid Conference is for information purposes only. It may answer some Offeror questions. Statements or representations made during the Conference are not legally binding. Changes resulting from this Conference or the site visits are official only if issued through an Amendment to the Invitation For Bid (IFB). Disclaimer Regarding Changes to the Solicitation Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

All Contractors must register with WMATA at “New Vendor Registration”. WMATA solicitations are publicized at Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

 Bid Form  Bid Price Schedule  Bid Guarantee  Bid Data Form with Supporting Data  Representations and Certifications  List of DBE Certified Firms  DBE Data One (1) hard copy AND One (1) electronic copy submitted on USB BIDDING MATERIAL Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

 The outside of the envelope shall show:  The outside of the envelope shall show: - THE AMENDMENTS RECEIVED (lower left hand corner). Failure to acknowledge all amendments may cause the Bid to be considered not responsive. - HOUR and DATE specified in the IFB for receipt, the IFB number, and the full legal name and address of the Bidder on the face of the envelope BIDDING MATERIAL Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

Proposals may be received prior to, but no later than 2:00 PM, September 16, 2015 BASIS FOR AWARD: The Authority will award a contract to the lowest responsive and responsible bidder whose bid conforms to this Invitation for Bids. BIDDING MATERIAL Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

AWARD Apparent Low Bidder submits Pre- Award Information within 5 days after Bid Opening WMATA will have 120 calendar days to award the Contract Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

SCHEDULE EVENTDATE IFB ReleaseAugust 17, 2015 Pre-Bid ConferenceSeptember 3, 2015 Deadline for Proposer QuestionsSeptember 11, 2015 Bid OpeningSeptember 16, 2015 Award Date (estimated)October 15, 2015 Notice to Proceed (NTP) (estimated)November 5, 2015 Dates Subject to Change Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation DBE Compliance, Appendix “B”

Disadvantaged Business Enterprises Disadvantaged Business Enterprise (DBE) 20%. Disadvantaged Business Enterprise (DBE) 20%. $500,000 or more for a construction contract. Submit complete schedule of DBE participation and Letters of Intent. All DBEs must have current WMATA DBE certifications. It is the policy of WMATA, the Federal Transit Administration (FTA) and the U.S. Department of Transportation (US DOT) that Disadvantaged Business Enterprises (DBE’s) shall have an equal opportunity to receive and participate in performing federally -assisted contracts, including contractors and subcontractors at any tier. Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

SUMMARY OF SUBMITTALS With the Bid/Proposal 1. Completed “Schedule of DBE Participation” (Attachment B-1) with current certification letters attached for each listed DBE. 2. Executed “Letters of Intent to Perform as a Subcontractor/Joint Venture” (Attachment B-2). 3. Justification for grant of relief (waiver of DBE goal), if applicable. Include completed “DBE Unavailability Certifications” (Attachment B-3) as appropriate. Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

SUMMARY OF SUBMITTALS Bid and Proposal Requirements (Apparent Successful Bidder/Proposer) 1. All DBEs must submit a copy of their current WMATA or DC DOT certification letters or a certification letter issued by the MWUCP. 2. DBE Manufacturer’s Affidavit, if applicable, must be submitted in order to receive 100 percent of the allowable credit for expenditures to DBE manufacturers/suppliers (Attachment B-4). 3. Schedule B Information for Determining Joint Venture Eligibility, if applicable (Attachment B-5, pgs. 1, 2, 3, 4). 4. Copy of Joint Venture Agreement, if applicable. 5. Certification letter of the DBE regular dealer/supplier, if applicable. Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

SUMMARY OF SUBMITTALS After Contract Award 1. “Prompt Payment Report-Prime Contractor’s Report” Attachment B-6) – submitted monthly. 2. “Prompt Payment Report-Subcontractor’s Report” (Attachment B-7) – submitted monthly. 3. Request to substitute DBE contractor (see paragraph 8.C.) – submitted as required. 4. Copies of subcontracts-submitted at the time of their execution. Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation

Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation TECHNICAL SPECIFICATIONS & PROJECT OVERVIEW

Agenda Background High Level Scope – Technical Project Management Scheduling / Coordination Special Conditions Summary of Work Matrix Existing Mezzanine Inspection Report (MIR) Site Visits 19

New power circuits to Kiosk New Ethernet cable to faregate array Addressing cable infrastructure Completed inspection tasks video scoping pull-string installation poor duct and new raceway identification Background (1) 20

Work Locations- 34 Metrorail Red Line Stations Background (2) 21

Installation of Under-Floor Duct Installation of Exposed Conduit Installation of Faregate Array Under-Floor Duct CAT6 Installation and Termination Installation and Termination of Electrical Circuit Installation of Fire Alarm System Cable High Level Scope 22

Installation of Under-Floor Duct 23 Typical Mezzanine Duct Layout

Exposed Conduit Installation (1) 24 In public and secure areas One inch GRS conduit

Exposed Conduit Installation (2) 25 Existing to new conduit transition

Installation of Faregate Array Under-Floor Duct 26

Temporary Trench Cover of U/F Duct 27

CAT6 Installation and Termination (I) 28

CAT6 Installation and Termination (II) 29

Installation and Termination of Electrical Circuit 30

Kiosk- Previous Design 31

Kiosk- Present Design 32

Installation of Fire Alarm Cable 33 Will be installed from the mezzanine Kiosk to the end-of-array faregate cabinet At the Kiosk-end the cable will land in the secured AFC cabinet Leave ample cable slack as lengths indicate in the pricing sheets Cable compliant with NEC 760

Project Specific Quality Management Plan (PSQMP) Design Control Plan and Quality Plan shall be submitted for approval Site Specific Safety Plan (SSWP) Master schedule 4 week schedule (weekly) Weekly Quality Reports Daily reports Weekly meetings Project Management 34

SITE ACCESS & POWER OUTAGE SUBMITTAL PROCESS SSWP Request (60 Days) GOTRS/SO Request (21 Days) GOTRS/SO Request (21 Days) SO Request Confirmation (Monday, Prior Target Week) SO Request Confirmation (Monday, Prior Target Week) Escort Request (Monday, Prior Target Week) Escort Request (Monday, Prior Target Week) Target Work Week Escort Approved (Thursday, Prior Target Week) Escort Approved (Thursday, Prior Target Week) SO Approved (Friday, Prior to Target Week) SO Approved (Friday, Prior to Target Week) 35

Site Access & Power Outage Submittal Process Sample of Weekly Switch Order Request 36

Special Condition- High Ceiling 37

Special Condition- Confined Space 38 Under platform at track level is the typical location Only a handful of locations require this level of safety Tenleytown Takoma Judiciary Square West

Special Condition- Battery & ELES Rooms 39

Summary of Work Matrix 40

MIR- Cleveland Park (1) 41

MIR- Cleveland Park (2) 42

MIR- Cleveland Park (3) 43

MIR- Cleveland Park (4) 44

MIR- Cleveland Park (5) 45

Site Visit 46 Gallery Place – Verizon Center – Faregate U/F duct work – CAT6 cable terminations at both ends – Remote mezzanine (F/A cable) Cleveland Park – Conduit installation – CAT6 cable installation – Battery room – Below floor cable trench (pull-through area)

Washington Metropolitan Area Transit Authority IFB-FQ15233 NEPP Electrical and Data Cabling Installation QUESTIONS?