Requirements and declarations Ken Hunt EBU Technical department.

Slides:



Advertisements
Similar presentations
Ralf Becker United Nations Statistics Division
Advertisements

Conversion of Analogue Assignments into Digital Allotments Conversion of Analogue Assignments into Digital Allotments The Channel Potential Method Dr.
RRC-06 MIGS, EXCESS and EQUITABLE ACCESS EBU TECHNICAL DEPARTMENT TERRY OLEARY.
Transition Procedures Jan-Peter Bengtsson, Chapter 6 Rapporteur
RRC 04/05 ITU Information meeting September Computer methods for planning Ken Hunt Rapporteur for Chapter 10.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the Arab countries Damascus, Syria August 2005 Analysis.
BR/TSD Accra 2005 BCD Workshop for the African Countries Working assumptions for the production of the draft plan 10 – 14 October 2005 Accra David Botha.
BR/TSD Accra 2005 BCD Workshop for the African Countries Second series of results of the first planning exercise 10 – 14 October 2005 Accra David Botha.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Principles and Approaches Сентябрь 2004 Москва David Botha.
The Channel Potential Method Dr. Roland Beutler Germany Practical Considerations.
BR/TSD Dakar 2005 BCD Compatibility Analysis 25 – 29 April 2005 Dakar David Botha Workshop for the African Group of Countries.
BR/TSD Dakar 2005 BCD Planning Software 25 – 29 April 2005 Dakar David Botha Workshop for the African Group of Countries.
BR/TSD دمشق 2005 BCD Planning Software أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Software Сентябрь 2004 Москва David Botha.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
BR/TSD Dakar 2005 Workshop for the African Group of Countries BCD Planning Principles and Approaches 25 – 29 April 2005 Dakar David Botha.
Problems and solutions For any given solution, a frequency planner can find a problem.
Skill need in enterprises: working group report Skill needs in enterprises Working group III report Rapporteur: Mark Keese OECD.
Click to add text © IBM Corporation Optimization Issues in SSE/AVX-compatible functions on PowerPC Ian McIntosh November 5, 2014.
Stratification (Blocking) Grouping similar experimental units together and assigning different treatments within such groups of experimental units A technique.
Variance reduction techniques. 2 Introduction Simulation models should be coded such that they are efficient. Efficiency in terms of programming ensures.
REDUNDANT ARRAY OF INEXPENSIVE DISCS RAID. What is RAID ? RAID is an acronym for Redundant Array of Independent Drives (or Disks), also known as Redundant.
An application of the Probability Theory
DiSC Personal Profile System Dimensions of Behavior Based primarily on Positive Personality Profiles by Dr. Robert A. Rohm, Ph. D.
Crisis & Risk Management Introduction. Crisis happens more than we imagine. They are not always easy to see unless they affect our own lives.
Teaching and Testing Pertemuan 13
Copyright 2012 Delmar, a part of Cengage Learning. All Rights Reserved. Chapter 13 Health Information Systems and Strategy.
Graham Eele Development Data Group World Bank
1.A file is organized logically as a sequence of records. 2. These records are mapped onto disk blocks. 3. Files are provided as a basic construct in operating.
SWOT: The Analysis of Strengths,
1 Framework Programme 7 Guide for Applicants
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
Financial Model Discussions Chair’s attempt to summarise positions David Williams TERENA General Assembly, Limerick June 2002.
ESPON Project TERRITORIAL TRENDS OF ENERGY SERVICES AND NETWORKS AND TERRITORIAL IMPACT OF EU ENERGY POLICY Álvaro Martins/Luís Centeno CEEETA Research.
Developing a result-oriented Operational Plan Training
Sébastien CHAMI 5 May, 2010 Reengineering French structural business statistics An extended use of administrative data.
SAMANVITHA RAMAYANAM 18 TH FEBRUARY 2010 CPE 691 LAYERED APPLICATION.
1 Unit 4 Managing Employee Performance and Performance Appraisal.
Researchers’ night 2009 Information Day, Brussels, « Tips for success and errors to avoid » 13 November 2008 RTD-T2, CR.
Requirements Analysis via Use Cases SE-2030 Dr. Rob Hasker 1 Based on slides written by Dr. Mark L. Hornick Used with permission.
Erasmus University Rotterdam, Netherlands and Academy of Economic Studies, Bucharest, Romania Accountability in the Public Sector: The Dutch Experience.
Ethics of Software Testing Thomas LaToza CS 210 Final Presentation 12 / 2 / 2002.
COM333 – IKBS3 Managing Portfolio. Key questions on the application portfolio STRATEGIC Why – do we want to do it in strategic terms? What – does the.
1 Software Development Software Engineering is the study of the techniques and theory that support the development of high-quality software The focus is.
Bosnia & Herzegovina Statistical Training Prosecution / Courts Session 4, November 22nd Overview of the Criminal Justice System and Statistics – Recording.
SYSTEM ANALYSIS.
Screen 1 of 22 Food Security Policies – Formulation and Implementation Policy Monitoring and Evaluation LEARNING OBJECTIVES Define the purpose of a monitoring.
By Team T-Rex James Houlihan And Gavin Herbert
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
ENGM 604: Social, Legal and Ethical Considerations for Engineering Responding to the Call of Morality: Identifying Relevant Facts, Principles and Solutions.
1 Quality Attributes of Requirements Documents Lecture # 25.
Session 2.02: Achieving an Adequate Level of Security Without Hindering Patient Care Jody S. Hawkins, ISO Dallas, Texas.
Preparing the Phase 0 Proposal What in the world are the proposal reviewers looking for?
Dual Relationships
Chapter 8: Constructing Understanding of Change Intervention Mushrooms 1.
PERFORMANCE MEASURES GROUP 4. DEFINITION PERFORMANCE MEASURES. These are regular measurements of outcomes and results which generates reliable data on.
Vocabulary Acquisition in a Second Language: Do Learners Really Acquire Most Vocabulary by Reading? Some Empirical Evidence Batia Laufer.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 11 Copyright 2001 Prentice Hall Publishers and Ardith E. BakerIMPLEMENTATION.
Brussels Privacy Symposium on Identifiability
Brussels Privacy Symposium on Identifiability
Just What Are Processes, Anyway?
Requirement Prioritization
The Second Stage Consultation on Fair Funding for Schools
Questions for break-out sessions GROUP 2 messages Participants : state administrations in charge of MSFD and/or WFD, ESA and GES experts, shipping industry,
Understanding Marketing Objectives
ENGINEERING ECONOMICS
IT Competency and Firm Performance: Is Organizational Learning a Missing Link? 杨雅文 南京大学商学院国际商务 2019/4/17.
Environmental Policy Mixes: Motivations, Evidence & Effectiveness
Illustrative Example p p Lookup Table for Digits of h g f e ) ( d c b
Institutional Review Board
Presentation transcript:

Requirements and declarations Ken Hunt EBU Technical department

Overview It is well known that in some parts of the planning area there are too many requirements to be satisfied It is also well known that administrative declarations can be used to overcome some deficiencies of the computing process: to account for the presence of mountains to account for future use of directional transmitting antennas other effects...

Overview It may not be obvious that a combination of excess requirements and abusive (internal) declarations can have a disastrous impact on the planning process It is the declarations which are internal to any one administration which have the highest potential for abuse A separate presentation goes into the detail of this This presentation deals with some specific examples and some possible improvements

Example 1 Some of the abuse of the concept of declarations seems to be accidental An example is where an administration submits several requirements for a given area, some with a single channel and others with 'UHF' (or 'VHF') The same administration then declares that most, or all, of the multi channel requirements are compatible

Example 1 They could all then be assigned the same channel, possibly even for the same area While this would 'satisfy' many of the requirements, it would not lead to a situation which could be implemented It is unlikely to be what the administration intended but is a direct result of what it has said that it wants

Example 2 Another example is where an administration has submitted several requirements for the same area with the same single channel These are clearly incompatible but the administration has declared them compatible It is likely that the synthesis process will find that it can assign the same channel to more than one requirement for the same area It is unlikely that this is what the administration wanted (but it is possible)

Example 3 In some cases an administration has submitted many tens of requirements, sometimes over 100, for the same area Without declarations there are clearly too many to be satisfied With declarations many of the requirements may be 'satisfied' but most of them could never be implemented

Example 4 In some other cases it is difficult to believe that a mistake has been made and it seems more likely that there has been a deliberate attempt to distort the planning process and gain an advantage over neighbouring countries For example there are sometimes several overlapping allotments/assignments on the same channel These are clearly incompatible but have been declared compatible

Example 4 The synthesis process will count these requirements individually and may then give an advantage to the concerned administration It will be argued that there are always mountains between the requirements

Example 4 The synthesis process will count these requirements individually and may then give an advantage to the concerned administration It will be argued that there are always mountains between the requirements In some parts of the planning area there seem to be more mountains than people!

Conditional declarations A new concept is that of conditional declarations and they may be too new for abuse of them to have been developed

Conditional declarations A new concept is that of conditional declarations and they may be too new for abuse of them to have been developed YET

Conditional declarations A new concept is that of conditional declarations and they may be too new for abuse of them to have been developed YET It is quite easy to foresee some abuse This could be where the conditions are not sufficiently precise and it subsequently is found to be impossible to meet them and a requirement can then not be implemented

Possible improvements Action by administrations: Every effort should be made to ensure that the conditions applied to 'conditional declarations' : are stated explicitly and without ambiguity are not subject to subsequent increased difficulty (such as increased protection ratios) Action within the planning approach : None discussed

Excess requirements Action by administrations: Every effort should be made to reduce the number of requirements in any area where there is an excess

Excess requirements Action by administrations: Every effort should be made to reduce the number of requirements in any area where there is an excess Additional effort should be made to reduce the number of requirements in any area where there is an excess However, there are currently increases

Excess requirements Action within the planning approach: Difficult to see what could be done in the absence of any identification of what are the priorities of a given administration Can administrations apply moral pressure to their neighbours?

Declaration abuse Action by administrations: Apply moral pressure to neighbours

Declaration abuse Action by administrations: Apply moral pressure to neighbours Apply more moral pressure to neighbours!

Declaration abuse Action within the planning approach: An extension to the compatibility analysis and synthesis could be considered in order to reduce the imbalance that they currently introduce This could involve splitting the synthesis into two phases

Declaration abuse In the first phase internal declarations would be either: ignored completely, or used to produce 'super linked' sets of requirements which would be treated as single requirements by the synthesis In the second phase any requirements which were assigned a channel in the first phase would retain a channel and all declarations (internal and external) would be taken into account

Declaration abuse The overall impact would be to achieve a better balance between administrations which had made abusive declarations and those which had not In those parts of the planning area where there had been no abusive declarations there should be little or no effect