Massachusetts Water Resources Authority Revisions to MWRA’s Ambient Monitoring Plan: Why Michael J. Hornbrook MWRA Chief Operating Officer Outfall Monitoring.

Slides:



Advertisements
Similar presentations
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Advertisements

Measuring Water Pollution
Britannia Mine: Environmental Impact Study of Treated Effluent Discharge Lee Nikl.
Massachusetts Water Resources Authority Proposed Revisions to MWRA’s Ambient Monitoring Plan: Introduction Andrea Rex Director Environmental Quality Dept.
Storm Water Regulation: What’s Next? Presented to: September 30, 2014.
TMDLs and the NACD TMDL Task Force TMDLs NACD TMDL Task Force TMDL Draft Policy Trading and TMDLs.
2009 Water Quality Monitoring Report – Fish Creek Vaughn Hauser, B.Sc. Naomi Parker, B.Sc., BIT, CEPIT.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
The MWRA outfall monitoring program. What we measure and what we have observed so far.
Massachusetts Water Resources Authority Frederick A. Laskey Executive Director 20 Years of Change: Boston Harbor Pollution Abatement Project Timelines.
Overview of legislative and policy drivers for marine nature conservation Roger Covey.
OMSAP Public Meeting September 1999 The Utility of the Bays Eutrophication Model in the Harbor Outfall Monitoring Program James Fitzpatrick HydroQual,
FETAKGOMO MUNICIPALITY CLEAN AUDIT PRESENTATION FOR THE YEAR ENDED 30 JUNE 2011 Sustainable Financial Systems and Appropriate Fiscal Framework for Local.
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
Burak Karacık İstanbul Technical University Turkey Key Question to be addressed by the round table discussion How do megacities modify freshwater and seawater?
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
International Cooperation in Water Management and Pollution Control in the Danube River Basin Joachim Bendow, ICPDR Executive Secretary 1.
1 Course Title: Ecotourism Course Code: (TM371) Lecture.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
Implementing the Municipal Separate Storm Sewer System Permit Stormwater Division General Services Department Board of Supervisors Work Session October.
Technical Track Work Group Report Out August xx, 2012.
Sediment Quality in the Corpus Christi Bay Sediment Quality in the Corpus Christi Bay Natalie Bartosh GIS in Water Resources, Fall 2003 Dr. Maidment, The.
OECD Global Forum on Sustainable Development 2-3 December, 2004, Paris Optimizing Compliance Monitoring and Enforcement: Japanese Experience in Water Pollution.
ISO 14001:2004, Environmental Management System
1 BENTHIC COMMUNITY STRUCTURE AND BIODIVERSITY FOLLOWING SEWAGE ABATEMENT PROGRAMS IN BOSTON HARBOR BENTHIC COMMUNITY STRUCTURE AND BIODIVERSITY FOLLOWING.
TEN-T Experts Briefing, March Annual Call Award Criteria.
OMSAP Public Meeting September 1999 Ecological Interactions in Massachusetts Bay A guide to how the MWRA Harbor and Outfall Monitoring Program evaluates.
OMSAP Public Meeting September 1999 Monitoring Plan Mike Mickelson and Ken Keay Massachusetts Water Resources Authority.
Orange Creek Basin Management Action Plan Alachua County Commission December 11, 2007 Fred Calder, FL DEP (850)
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Connecting rivers and seas – the Danube/Black Sea experiment Laurence Mee.
A Program of Our Sponsors An Introduction to Greening Health Care Working together for healthier communities.
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
Technical Track Work Group Report Out August 22, 2012.
Status Report on Chesapeake Bay Clean Up Plan Wastewater Sector June 2, 2010.
Construction Site Stormwater Compliance Presentation for CALBIG Matt Fabry, Program Coordinator October 9, 2013 San Mateo Countywide Water Pollution Prevention.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
ISAT 422: Environmental Management Water Regulations n "Clean Water Act (CWA)" = Water Pollution Control Act of 1972 n Amended by Clean Water Act of 1977.
1 Ocean Disposal of Wastewater (An Introduction) by Prof. B. S. PANI I. I. T. Bombay, Mumbai.
Point Source Loads and Decision Criteria for Toxics Modeling Baltimore Harbor TMDL Stakeholder Advisory Group September 10, 2002.
OMSAP Public Meeting September 1999 Boston Harbor Project Overview Effluent Quality.
Zhao Xia Qinghai Normal University Oct. 21, 2015.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
The 2009 Alexandrium bloom Donald M. Anderson- Woods Hole Oceanographic Institution Scott Libby - Battelle, Brunswick, ME.
-WHAT IS A PROJECT ASSESSMENT & EVALUATION PLAN? -WHY ARE WE ASKING GRANTEES TO ASSESS, EVALUATE, & REPORT PERFORMANCE & WHAT ARE THE BENEFITS? - HOW DO.
Yarmouth’s Wastewater System Initiative Phase 1 Article 12 ATM 2008 $3.1 Million Design and permitting for Collection, Treatment and Disposal.
CONTEXT FOR THE REVIEW Gary Matlock, Ph.D. Deputy Assistant Administrator for Programs and Administration (A) Office of Oceanic & Atmospheric Research.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
Environmental Impact Assessment EIA (Topic 2). BAM BAM BAM BAM BAM BAM Three elements 1. Baseline data 2. Assessment of impacts 3. Monitoring changes.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
Effluents Standards In Pakistan Environmental protection agency (EPA) is responsible for all aspects of the environment; regulation of sanitation and.
Framework for CSO Control Planning
GEF -IWCAM and IABIN Indicators Mechanism Workshop
2011& 2012 FISH and SHELLFISH Monitoring Maury Hall and Yong Lao, MWRA Michael Moore, WHOI Outfall Monitoring Science Advisory Panel April.
Development of Compliance Tools for Metals
State of the Harbor Kaitlyn Shaw Town of Nantucket Natural Resources Department Water Resource Specialist.
Wastewater Treatment.
Performance Analysis of Textile Industry Wastewater Treatment Plant with Physicochemical Characterizations Tadele Assefa Aragaw Faculty of Chemical and.
Flounder Histopathology and Chemistry
Permitting Requirements for Lagoons
John Tinger U.S. EPA Region IX
Lisa Lefkovitz Battelle Carlton D. Hunt Maury Hall MWRA
Spencer Bohaboy Policy Development Specialist Water Quality Policy
Campus Improvement Planning
Industrial Effluent Discharge and Pollution Renaldo du Toit
Water Framework Directive 2000/60/EC
CD Spending and 5-year agreement update
Presentation transcript:

Massachusetts Water Resources Authority Revisions to MWRA’s Ambient Monitoring Plan: Why Michael J. Hornbrook MWRA Chief Operating Officer Outfall Monitoring Science Advisory Panel June 29, 2009

2 Nine years of discharge ambient monitoring Comprehensive Ambient Monitoring planned for 5 years Has continued an additional 4 years on its expired permit Time frame for new permit still unclear In September will complete 9 years discharge ambient monitoring plus 8 years baseline All >30 monitoring questions posed by the Outfall Monitoring Task Force answered. Water quality standards in Massachusetts Bay are met and generally better than planning predictions

3 MWRA’s purpose today Based on 9 years of monitoring results, scaling back is appropriate, for existing permit Not a template or basis for monitoring requirements in next permit MWRA’s position for next permit is that Ambient Monitoring or Contingency Plan permit requirement is not necessary Extensive effluent sampling will continue Diffuser #2, active Diffuser #44, inactive

4 Bays ecosystem is healthy The bays continue to support a healthy ecosystem in the water and in the sediments with no adverse impacts from the outfall observed over 9 years of intensive monitoring Dolphins playing in the wake of the R/V Aquamonitor, August 2007 photo by Bob Mandeville

5 MWRA committed to performance excellence Pollution prevention through stringent limits on industrial discharges. Investment in maintenance of treatment infrastructure. Treatment process achieves high quality effluent, documented by rigorous effluent testing. MWRA consistently meets or does better than permit limits.

6 Effluent testing will remain intensive 35,000 tests annually, about 95 tests/day includes Conventional pollutants –TSS –BOD –Bacteria Priority pollutants –Metals –Organics Toxicity Nutrients Process Control

solids discharges remained low <20 tons/day

metals discharges about 100 pounds/day

9 Actual pollutant loadings below original planning projections #Conservative value, all samples were non-detect

10 Significant Investment in Ambient Monitoring $53 million in external monitoring, modeling and cooperative research projects for monitoring outfall effects Including MWRA laboratory and technical staff costs brings total to more than $60 million. With changes reviewed today, ambient monitoring expenses remain substantial: >$2 million for FY10.

11 Results are in Investment yielded high- quality science done by acknowledged experts from major universities and research institutions. Hundreds of technical reports, reports at symposia, and peer- reviewed publications in scientific journals. Bottom line: Boston Harbor recovering and no adverse impact on Massachusetts or Cape Cod Bays.