Status of the Spanish synchrotron David Beltrán Laboratori de Llum Sincrotró LLS 18-June-2003
Overview General status of the Spanish synchrotron Status of the control system
General Group officially created Land for the synchrotron decided Election of the new director
Collaboration with other countries: France,... Meeting to decide the 5 beamlines in Menorca 1 st, 2 nd, 3 rd October
Lattice redesign TBA 12 cells DBA 16 cells Top-up injection 3 GeV
Control system A proposal for modelling the control system of the Spanish synchrotron David Beltran (LLS), Manuel Gonzalez (CERN) Acknowledgement to Andy Goetz (ESRF)
Control system User requirements Actors: Users, equipment Use Cases
Control system Package organization: Application specific: Injection, RF Application independent: EPICS, Spec System software: Linux, RTEMS