Status of the Spanish synchrotron David Beltrán Laboratori de Llum Sincrotró LLS 18-June-2003.

Slides:



Advertisements
Similar presentations
Layered EPICS User Gap Control Interface for NSLS Mini-gap Undulators William Nolan and John Skinner, Biology Department Susila Ramamoorthy and Lonny Berman,
Advertisements

1 st Place Post-Secondary Winner. 2 nd Place Post-Secondary Winner.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Experiments on Trust Prediction based on reputation features J. David Nuñez-Gonzalez Manuel Graña 1CISIS2014, Bilbao, June.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Magnets/Beamline Equipment/ Instrumentation J. C. Sheppard.
Virtual Cell Support Software: User Interface Worldwide Web Instructional Committee, North Dakota State University, Fargo, ND.
Use of RCP for Instrument Control Tony Lam 2006 Eclipse SLAC.
AS Diagnostic Collaboration Mark Boland
Daresbury Laboratory Mark Heron Overview of DIAMOND to the European EPICS Meeting at PSI May 2001 Overview of DIAMOND to the European EPICS Meeting at.
1 13 th RD51 CB meeting – 15/10/2013 AGENDA 1.Approval of the agenda 2.Approval of the minutes of the previous meeting (July 7, 2013; distributed on 24/9/2013.
1 CERN, 14-17/10/2013 IXIII RD51 CB meetingSilvia DALLA TORRE 13 th RD51 CB meeting – 15/10/2013 REPORT TO THE COLLABORATION.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
SESAME Status Ahed AL Adwan (SLS, SESAME) EPICS Collaboration Meeting Bessy, May 2002 Synchrotron-light for Experimental Science and Applications in the.
AVO Status June 2002 Status M. Dolensky. AVO Status June 2002 WA0 - European Initiatives Enabling a Virtual Observatory for Europe EVOE –Submitted expression.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
CLIC ACAS Collaboration CERN, 12 April 2011 Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.
DubLi.comDubLi Network Worldwide Business Opportunity Worldwide Auction House.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Towards ISO Standards for AD syringes: Update from WHO Gerald Verollet World Health Organization 3rd SIGN Meeting - New Delhi.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
DwB 2nd Regional Workshop on 'Microdata Access in European countries' Athens, Greece - October 2014 Oscar Martinez de la Torre CIO and Data Bank Director.
Year# of visits Number of visits per year South African synchrotron useage:
Improving patient access through technology Regional added value to support boards achieve targets 29th October 2008 Teledermatology helps doctors and.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Status of the Spanish Light Source David Beltrán.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
IT – JINR Collaboration by Jürgen Knobloch CERN-JINR Meeting 20 th October 2005 This file is available at:
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
Status of Exchange deployment Alberto Pace for the IT/IS group Desktop Forum, April 3 rd 2003.
Gwo-Huei Luo on behalf of Keng Liang and TPS Design Team NSRRC, Hsinchu, Taiwan XBPM and Beam Stability Workshop, Sept. 11, 2008 Status of TLS and Taiwan.
3rd Libera Users Meeting
5-Oct-051 Tango collaboration status ICALEPCS 2005 Geneva (October 2005)
Browser Wars (Click on the logo to see the performance)
CS 490 Software Testing Fall 2009 Implement Unit Test Framework for Application running on a Pocket PC 2003 device 09/18/091 Framework for Unit-testing.
February 2010 ALBA Synchrotron Light Source Francis Perez.
A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.
This Certifies that _______________________ Has won 1 st Place in and has successfully completed our 9 week weight loss challenge Proudly given this _____.
 Life Expectancy is 180 th in the World.  Literacy Rate is 4 th in Africa.
© The Concept Factory © Science Link | 2© Science Link 2013  Three calls during Results:  66 applications, companies from 8 countries.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
Advanced Optics Control, CERN, Masamitsu Aiba, PSI Recent optics measurements at SLS M. Aiba, M. Böge, Á. Saá Hernández, D. Mayilyan and.
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab New kappa not yet in operation.
Presentation of the bio waste management model WP5 – Action 5.1,5.2, Status Report PTC in Corsica 21+22/10/14.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
A. Sánchez Industrial Office (SAC-18) 1 July ALBA Industrial Liaison Office.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
The trusted network. Stamp of guarantee. Policies proposals (of European and National character): to the executive, legislative and judicial powers 3.
Dr Mark Boland Principal Scientist Accelerator Physics AXXS Australian X-band XFEL Source at the Australian Synchrotron On behalf of the Accelerator Science.
Industrial Controls Engineering Department Results of the PXI survey launched in June 2011 First CERN PXI Users Group meeting - 19 th October H.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
Gantt Chart October November December Step One Step Two
Arithmetic and Geometric Means
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
Communications planning for first injection and inauguration:
On behalf of the Accelerator Project Phase II Team
Spiritual Leadership Development
Phone Number BINGO!!!.
Create a Plan - Next 90 Days
Demander et dire sa date d’anniversaire.
4n + 2 1st term = 4 × = 6 2nd term = 4 × = 10 3rd term
Smart Technologies: Connected Cars & Beyond
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
Create a Plan - Next 90 Days
BOARD MEETINGS Thursday, August 27th TBA NJHS MEETING SCHEDULE
WHS Bell Schedule 1st Period  7:30 – 8:30 2nd Period  8:35 – 9:30
1. Get specs from customer Cost out the solution Decide discount strategy Assemble proposed response Approve proposed response.
Presentation transcript:

Status of the Spanish synchrotron David Beltrán Laboratori de Llum Sincrotró LLS 18-June-2003

Overview General status of the Spanish synchrotron Status of the control system

General Group officially created Land for the synchrotron decided Election of the new director

Collaboration with other countries: France,... Meeting to decide the 5 beamlines in Menorca 1 st, 2 nd, 3 rd October

Lattice redesign TBA 12 cells DBA 16 cells Top-up injection 3 GeV

Control system A proposal for modelling the control system of the Spanish synchrotron David Beltran (LLS), Manuel Gonzalez (CERN) Acknowledgement to Andy Goetz (ESRF)

Control system User requirements Actors: Users, equipment Use Cases

Control system Package organization: Application specific: Injection, RF Application independent: EPICS, Spec System software: Linux, RTEMS