Notification of Digital requirements for the Draft Plan – Damascus, 16-18 August 2005 1 Regional Information Meeting and Workshop related to the RRC-06.

Slides:



Advertisements
Similar presentations
ETutorial – Form 16A October 19, Tax Information Network of Income Tax Department (managed by NSDL)
Advertisements

2017/3/25 Test Case Upgrade from “Test Case-Training Material v1.4.ppt” of Testing basics Authors: NganVK Version: 1.4 Last Update: Dec-2005.
1. XP 2 * The Web is a collection of files that reside on computers, called Web servers. * Web servers are connected to each other through the Internet.
1 IDX. 2 What you will learn: What IDX is Why its important How to use it Tips and tricks Introduction Q & A.
Chapter 1 The Study of Body Function Image PowerPoint
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
1 State Wildlife Action Plans Wiki: Business Transformation Tutorial Brand Niemann July 5, 2008
Linked requirements and their impact on planning Borislav M. Rackov ITU/BR/TSD/TPR Linked requirements and their impact on planning Borislav M. Rackov.
Regional Radiocommunication Conference (RRC-06) 15 May - 16 June 2006, Geneva, Switzerland RRC-06 Planning Interface Miroslav Ćosić, Andrea Manara Radiocommunication.
BR/TSD Geneva 2003 RRC-04/05 Information meeting Considerations on data formats to be used for capturing and submission of the requirements of Administrations.
BR DPT - RRC06 AD submission guidelines1 Administrative Declarations submission guidelines Borislav M. Rackov BR/TSD/TPR RRC06 BR DPT.
BR DPT - RRC06 DR submission guidelines1 Digital Requirements submission guidelines Borislav M. Rackov BR/TSD/TPR RRC06 BR DPT.
International Telecommunication Union World Radiocommunication Seminar (Geneva, 6-10 December 2010)
Regional Radiocommunication Conference Information session Results of the second synthesis of the draft Plan Pham Nhu Hai PXT Team Leader Radiocommunication.
BR/TSD Geneva 2003 RRC-04/05 Information meeting Activities that led to the requirement for convening the RRC-04/05 David D. Botha V.325.
Regular notification statistics Borislav M. Rackov ITU/BR/TSD/TPR Regular notification statistics Borislav M. Rackov ITU/BR/TSD/TPR Second Regional Meeting.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Results.
BR/TSD Accra 2005 BCD Salient issues related to the production of the draft plan 10 – 14 October 2005 Accra David Botha Workshop for the African Countries.
BR/TSD Accra 2005 BCD Workshop for the African Countries Working assumptions for the production of the draft plan 10 – 14 October 2005 Accra David Botha.
Preparation of requirements for the production of Draft Plan Borislav M. Rackov ITU/BR/TSD/TPR Preparation of requirements for the production of Draft.
BR/TSD دمشق 2005 BCD Salient issues related to the production of the draft plan أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of.
RRC - Administrative declarations for the Draft Plan – Damascus, August Regional Information Meeting and Workshop related to the RRC-06 for.
BR/TSD Dakar 2005 BCD RRC Website 25 – 29 April 2005 Dakar David Botha Workshop for the African Group of Countries.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
1 Some important points on Regulatory Issues discussed at the second meeting of the Sub- working Group of RPG 1.Regulatory text for the new regional Agreement.
1 Geneva, October 2008 YUN Young-Woo IP INFORMATION & WIPO STANDARDS.
International Telecommunication Union September 2010 WRC-12 PREPARATIONS MID Regional Planning Seminar 19/20 September 2010 W. Frank Radiocommunication.
Click to edit Master title style Page - 1 OneSky Teams Step-by-Step Online Corporate Communication Support 2006.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
May Welcome and Introductions Training Overview Evolution from CSRS to CEDARS (Fri) Submission and Editing Process (Tues) Course Catalog, Student.
Addition Facts
ZMQS ZMQS
1 WATER AUTHORITY Dr. Or Goldfarb CENTRAL BUREAU of STATISTICS Zaur Ibragimov Water Accounts in Israel Vienna January 2009.
COMPLETING THE FREE APPLICATION FOR FEDERAL STUDENT AID (FAFSA) Presented by: Student Support Services and the Financial Aid Office at HCC 1.
Mind Mapping Techniques to Create Proposals APMP Colorado Chapter March 6, 2012 James J. Franklin San Diego PMI Chapter PMI is a registered trade and service.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
1 PLANNING PROCEDURE FOR HF BROADCASTING RR12. Planning procedure for HF broadcasting – Art.12 of the Radio Regulations. Introduction to HF notification.
PEPS Weekly Data Extracts User Guide September 2006.
American Community Survey Data Products Updated February 2013.
Welcome To INTERNSHIP CLINIC Internship Clinic: Summer 2011
1 ITSS This overview deck contains two sections. Please use the links below to navigate –How to Register for ITSS Application AccessHow to Register for.
VOORBLAD.
Benchmark Series Microsoft Excel 2013 Level 2
Created 09/01/2006 Revised 6/1/2010 Office of Information, Technology and Accountability 1 Microsoft Access – Intermediate Level.
Chapter 5 Test Review Sections 5-1 through 5-4.
GEtServices Services Training For Suppliers Requests/Proposals.
1 BRState Software Demonstration. 2 After you click on the LDEQ link to download the BRState Software you will get this message.
Addition 1’s to 20.
25 seconds left…...
School Census Summer 2010 Headlines 1 Jim Haywood Product Manager for Statutory Returns Version 1.0.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
12 January 2009SDS batch generation, distribution and web interface 1 ExESS IT tool for SDS batch generation, distribution and web interface ExESS IT tool.
PSSA Preparation.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
A lesson approach © 2011 The McGraw-Hill Companies, Inc. All rights reserved. a lesson approach Microsoft® PowerPoint 2010 © 2011 The McGraw-Hill Companies,
Benchmark Series Microsoft Excel 2013 Level 2
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
Presentation transcript:

Notification of Digital requirements for the Draft Plan – Damascus, August Regional Information Meeting and Workshop related to the RRC-06 for the Administrations of the Arab Group of countries Submission of Digital Requirements for the Draft Plan A. Méndez BR/TSD/TPR Damascus, August 2005

Notification of Digital requirements for the Draft Plan – Damascus, August Objectives of this presentation Share BRs experience about submission issues during the Planning exercise Describe changes to the notice format and submission process for the Draft Plan Describe/show use of BRs Software for Data Capture Data Validation Data Correction Final Assembling of files Data Query & extraction

Notification of Digital requirements for the Draft Plan – Damascus, August Some statistics from the Planning Exercise 103Administrations that submitted requirements 300incoming s (registered) 120outgoing s (registered) …telephone calls and unregistered s 1 950files received intermediate files processed intermediate notices processed valid input requirements for the exercise

Notification of Digital requirements for the Draft Plan – Damascus, August Statistics from Planning Exercise (cont.) ~30 % of the notices received had errors – Wrong file format – Identification data repeated or inconsistent (SFN Id, Notice Id, etc.) – Technical data missing or incorrect – Allotment areas wrongly defined (crossing segments, points outside the territory) – Analog assignment (for conversion) not found – etc.

Notification of Digital requirements for the Draft Plan – Damascus, August Distribution of submissions received by the BR Ideal expected distribution What happened for the planning exercise % of notices date

Notification of Digital requirements for the Draft Plan – Damascus, August Increase the quality (correctness and completeness) of the submitted data 2.Reduce number of time consuming activities (i.e. correspondence exchanged between BR and administrations) 3.Develop new software tools to facilitate validation 4.Reduce bottlenecks in data processing BRs goals for the next submission phase

Notification of Digital requirements for the Draft Plan – Damascus, August Deadline for submission of requirements for the Draft Plan? –31 st October 2005 (see CR/241) Who can submit requirements? –Only authorized contact persons What should be submitted? –ALL digital requirements (in SGML file format), even if there are no changes with respect to those submitted for the planning exercise How to prepare the requirements files? –Using different appropriate software tools Basic questions on digital requirements

Notification of Digital requirements for the Draft Plan – Damascus, August Changes to submission procedure Changes in the data structure and forms (following decisions on coordination information taken by IPG-1 in July) Administrations are invited to use the new BR software tools (to facilitate complete data validation)

Notification of Digital requirements for the Draft Plan – Damascus, August Changes in requirement forms layout New

Notification of Digital requirements for the Draft Plan – Damascus, August Changes in requirement forms elements New field rrc_coord_self New sections COORD_A and COORD_O

Notification of Digital requirements for the Draft Plan – Damascus, August Changes in database structure 2 new tables 1 new field

Notification of Digital requirements for the Draft Plan – Damascus, August News about BRs software for requirements submission Announced in CR/241 Overview of changes –Update of notice forms (DT1, DT2, DS1 & DS2), database structure and all applications with new coordination information –Consolidated single software application (capture, correction, validation, etc.) –Addition of a tool for final assembling of files Updates available on the Web for free download ( 04/intersession/index.asp)

Notification of Digital requirements for the Draft Plan – Damascus, August NewUpdated

Notification of Digital requirements for the Draft Plan – Damascus, August How to prepare requirement files effectively? Administrations own software Text processors MS Access BRs software

Notification of Digital requirements for the Draft Plan – Damascus, August BRs Data Capture software (Dcap) Administrations own software Data Validation (DVal) Electronic SGML file Val OK? No Yes Submission process (1) Text editor (Notepad) Correction (Dcor/Editor)

Notification of Digital requirements for the Draft Plan – Damascus, August Submission process (2) File assembling and final data Validation (Dnotif) Val OK? No Yes Correction (Dcor/Editor) File 1 File 2 File 3 File n Valid consolidated file No Yes Reference database

Notification of Digital requirements for the Draft Plan – Damascus, August RRC Digital requirements database Submission process (3) BR full data Validation Before Draft Plan analysis… Administration Radiocommunication Bureau Valid consolidated file

Notification of Digital requirements for the Draft Plan – Damascus, August Data validation tool: DVal DVal Electronic Notifications SGML file Validation report (text file) (link) Text editor (Notepad) Stamps input file

Notification of Digital requirements for the Draft Plan – Damascus, August Data validation tool: DVal 1 st step (file format) 2 nd step (data type, length, etc.) 3 rd step (range of values, mandatory keys, Geographical, etc.) Text editor or DCor Sequential process

Notification of Digital requirements for the Draft Plan – Damascus, August Data correction tool: DCor Dcor (Val/Conv/Corr) Input requirements file Corrected SGML file Filename.corr Input Output Link Text editor (Notepad) Corrected database file Filename.mdb Note: Dcor does not only allow for correction of input SGML files but also validates and converts to mdb format

Notification of Digital requirements for the Draft Plan – Damascus, August Files assembling and Final Validation tool File assembling and final data Validation (DNotif) File 1 File 2 File 3 File n Reference Database (analog TV, other services) Val OK? File with notices ready for submission to BR Notices with errors

Notification of Digital requirements for the Draft Plan – Damascus, August Submission of requirements to BR Preferably by –Message subject: RRC- Submission of digital requirements for the Draft Plan –Message body: summary of file contents (N° of notices, notice types, etc), signature –Attachment: valid SGML file

Notification of Digital requirements for the Draft Plan – Damascus, August References -RRC Report (revised version) -Report of IPG-1 -BR Circular Letters (CR/…) -BR IFIC (MIFR/Plans ST61-GE89) -ITU Web site 04/intersession/index.asp (database structure, software, additional documentation) -BR Contact address:

Notification of Digital requirements for the Draft Plan – Damascus, August RRC Input data Processing Team A. Skokova B. Rackov B. Ba S. Pinnagoda A. Méndez

Notification of Digital requirements for the Draft Plan – Damascus, August Workshop (this afternoon) and BR IFIC (on request)