1 Regional Radiocommunication Conference 2006 (RRC-06) Expectations, opportunities and options.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
Variations of the Turing Machine
AP STUDY SESSION 2.
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
Wiesbaden 95 rev. Maastrich 02 & Chester 97 ITU-BR Information meeting on RRC-04/05, Geneva, September 2003 Overview of the special agreements concluded.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the Arab countries Damascus, Syria August 2005 Planning.
International Telecommunication Union World Radiocommunication Seminar (Geneva, 6-10 December 2010)
BR Information Meeting on RRC-04/05 (Geneva, 18 – 19 September 2003) RRC-04/05: Terms of reference and scope of work T. GAVRILOV Radiocommunication Bureau.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the African countries Dakar, Senegal, April 2005 Results.
BR/TSD Accra 2005 BCD Salient issues related to the production of the draft plan 10 – 14 October 2005 Accra David Botha Workshop for the African Countries.
BR/TSD Accra 2005 BCD Workshop for the African Countries Working assumptions for the production of the draft plan 10 – 14 October 2005 Accra David Botha.
BR/TSD Москва 2004 Workshop for CEE, CIS and Baltic States BCD Planning Principles and Approaches Сентябрь 2004 Москва David Botha.
BR/TSD دمشق 2005 BCD Salient issues related to the production of the draft plan أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of.
1 Conclusions reached at IPG-1, 4-8 July 2005 The Intersessional Planning Group held its first meeting at ITU headquarters in Geneva, from 4 to 8 July.
BR/TSD دمشق 2005 BCD Planning Software أغسطس - آب 2005 دمشق David Botha Workshop for the Arab Group of Countries.
Regional Radiocommunication Conference 2006 (RRC-06) Regulatory and Procedural aspects François Rancy Chairman, Regulatory and Procedural Group.
Conversion of analogue assignments Protection of existing and planned services Conversion of analogue assignments Protection of existing and planned services.
OVERVIEW OF INTERSESSIONAL ACTIVITES Eng. Taha A. Usi Ag. Zonal Manager TCRA, Zanzibar
BR/TSD Dakar 2005 Workshop for the African Group of Countries BCD Planning Principles and Approaches 25 – 29 April 2005 Dakar David Botha.
1 Some important points on Regulatory Issues discussed at the second meeting of the Sub- working Group of RPG 1.Regulatory text for the new regional Agreement.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Wiktor Sęga, Office of Electronic Communications, Poland
1 CREATING AN ADMINISTRATIVE DRAW REQUEST (OCC) Complete a Checklist for Administrative Draw Requests (Form 16.08). Draw Requests amount must agree with.
Prepared by: Workforce Enterprise Services For: The Illinois Department of Commerce and Economic Opportunity Bureau of Workforce Development ENTRY OF EMPLOYER.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
Plan My Care Brokerage Training Working in partnership with Improvement and Efficiency South East.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
The 5S numbers game..
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
The need to harmonize spectrum for mobile
Bellwork Do the following problem on a ½ sheet of paper and turn in.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
Copyright © 2013, 2009, 2006 Pearson Education, Inc. 1 Section 5.5 Dividing Polynomials Copyright © 2013, 2009, 2006 Pearson Education, Inc. 1.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1. The ITU Radiocommunication Sector (ITU-R) will remain the unique and universal convergence and regulatory centre for worldwide radiocommunication matters.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
GEtServices Services Training For Suppliers Requests/Proposals.
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Essential Cell Biology
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
1.step PMIT start + initial project data input Concept Concept.
9. Two Functions of Two Random Variables
1 Decidability continued…. 2 Theorem: For a recursively enumerable language it is undecidable to determine whether is finite Proof: We will reduce the.
Presentation transcript:

1 Regional Radiocommunication Conference 2006 (RRC-06) Expectations, opportunities and options

2 Presented by Kavouss Arasteh Senior Adviser to the Ministry of ICT,I.R of Iran Chairman, Intersessional Planning Group (IPG) Chairman, WRC-07 Conference Preparatory Meeting (CPM ) Vice Chairman, Telecommunication Development Advisory Group (TDAG)

3 What is expected from RRC-06

4 To establish a new regional agreement, for terrestrial digital broadcasting in the frequency bands MHz and MHz, for Region 1 and the Islamic Republic of Iran The Agreement must protect:

5 The existing and planned broadcasting assignments ; The existing and planned broadcasting assignments ; The existing and planned assignments to other primary services in the bands MHz and MHz. The existing and planned assignments to other primary services in the bands MHz and MHz.

6 The Agreement must also determine:

7 Mechanisms, including time period, for the migration from analogue to digital broadcasting; Mechanisms, including time period, for the migration from analogue to digital broadcasting;

8 The new Digital terrestrial Plan(s) will consist of digital (television and sound) allotment(s) and/ or assignment(s), based on the requirements submitted by administrations to the intersessional planning Group. These requirements to be submitted thru the BR to the Intersessional Planning Group as assignments or allotments in MFN or SFN, based on different reception mode (fixed, portable, indoor and outdoor and mobile).

9 The Agreement must also determine:

10 The established Plan(s) must be easily implementable during the transition period.

11 The agreement should be self-contained /self-sufficient without, to the extent practicable, any cross reference to any provisions of the Radio Regulations as the latter are under continued updating by conferences in which the broadcasters may not be present or their interest may be compromised by other services Any regulatory provision of the agreement must be easily implementable in practice through appropriate means without a need to any Rules of Procedure.

12 The Plan(s) must be sufficiently forward looking, flexible and long lasting with immediate implantation possibilities, under certain conditions.

13 The agreement must contain relatively simple and solid modification (additions, deletions and changes) in order to enable contracting Member administrations to satisfy their future requirements/needs.

14 The above-mentioned Modification Procedure must take account of the advantages and drawbacks of the previous ITU Plans. In order to, on the one hand safeguard the rights of each and every contracting Member administration, in particular those of the developing countries and, on the other hand, to reduce the burdens to the BR and administrations.

15 The agreement must contain necessary procedures under which coordinated allotments would be converted into assignments without a need to apply additional procedure.

16 In case that the need of having a conversion procedure is justified, it should be integrated in the notification Article and avoid to include an specific procedure/Article in the agreement for conversion from allotment into assignment.

17 The agreement must provide an stable status for the allotments and assignment not coordinated at the Conference and contained in an Attachment / Annex to the Plan(s) during a pre- determined period (2-3 years) so as any modification to the Plan(s) duly take into account (Protect) the allotments and/or assignments included in that Attachment/Annex.

18 The above-mentioned relations implies that relevant parts of the ST 61and GE 89 which are not covered by the new Plan(s) need to be revised.

19 The established Plan(s) must meet the short, medium and long terms requirements of administrations, taking into account the advancement of the digital technology in the field of broadcasting as well as the market and users driven requirements.

20 The Second Session of the Conference RRC-06 needs to be conducted as smooth as possible and as efficient as practicable.

21 How to achieve the above- mentioned objectives ?

22 1. Through an efficient and objective Intersessional activities; 2. Through a very well prepared Second Session of the Conference; 3. Through duly effected bilateral and multilateral coordinations among all administrations in the planning area;

23 4. Through well prepared and efficiently conducted regional and inter-regional seminars, information meetings as well as timely organised coordination meetings; 5. Through mutual understanding and spirit of collaboration among administrations based on equal happiness or equal unhappiness so as there should no gaining or losing administration;

24 6. Through the establishment a realistic, workable, pragmatic, objective, mutually agreed transition period. This period will have to include a ceiling deadline beyond which the established digital Plan(s) operate without suffering from any interference from any broadcasting analogue emissions and without protecting any of the latter emissions.

25 The concept of non-interference and non protection referred to above, must be accompanied by necessary ways and means in order to provide necessary evidence and prove that the above-mentioned concept is fully observed in reality and practice.

26 The afore-mentioned concept should not be extended to the case of two digital allotments assignments i.e. a new or modified digital allotment or assignment shall not brought into use if it does not fully protect the established,as evolved Plan(s), using the procedures and criteria contained in the agreement.

27 The concept of non interference and non protection should not be extended to the assignments to other primary services which are not covered by section of the report of the RRC-04 which are not referred to in the remark columns of the Plan(s).

28 Any interference caused to the existing and planned assignments of other primary services should not prevent the recording of the digital allotments or assignments, if the later have been coordinated with other digital allotments and assignments contained in the Plan(s). However, such incompatibilities would be addressed through an appropriate procedure. Such procedure yet to be established by the RPG and submitted to the second session.

29 7. Through an efficient, open and transparent process of the Intersessional activities referred to in Resolution COM5/1 of the RRC-04: This activities comprises of the works which being carried out by the Intersessional Planning Group (IPG) and those which are being carried out by the Planning Exercise Team(PXT).

30 8. Due account should be taken of bilateral and multilateral (pre coordination) agreement obtained or yet to be obtained before and during the second session.

31 POSSIBLE OPTIONS

32 1.Prepare a draft Digital Plan(s) in which the existing and planned analogue as well as existing and planned assignments to other primary services are not taken into account during the design /process of the Plan(s) but protect them, as appropriate by corresponding procedures referred to in the Report of RRC-04 once the Plan(s) is/are designed/established.

33 2.Prepare a draft Digital Plan(s) with following two sub- set of option mentioned in1) above.

34 2.1During the design /process of the draft Plan(s) no account will be taken for the existing and planned analogue assignments but to protect them by an appropriate procedure after the Digital Plan is established. In this option existing and planned assignments to other primary services will be taken into account during the design of the Plan(s) pursuant to paragraph of the RRC-04 Report.

35 2.2During the design /processing of the draft Plan(s) no account will be taken for the existing and planned assignments to other primary service but to protect them by an appropriate procedure after the Digital Plan(s) is/are established. In this option existing and planned analogue will be taken into account during the design/process of Plan(s), pursuant to paragraph of the RRC-04 Report.

36 3.Determine a well established procedure for the early implementation of the Plan(s) during the transition period so as each and every administration could be in a position to implement during the transition period its new digital allotment/ assignments under certain conditions contained in the procedure.

37 4.Determine a realistic, workable, pragmatic, objective, mutually agreed transition period. This period will have to include a ceiling /deadline beyond which the established digital Plan(s) operate without suffering interference from any analogue broadcasting emissions and without protecting any of the latter emissions.

38 Two options could be further developed and elaborated in this regard:

39 A.A single transition period ceiling /deadline either 2015/2020 or 2020/2025 for the entire planning area, or;

40 B.Two different transition period ceiling /deadlines one for one group of countries mainly Europe (2015/2020) and another for the rest of the planning area (2020/2025). A procedure to be established to govern the situation in the overlapping area for the second option.

41 5. Produce a Draft Plan(s) based on different protection margin than that determined by the RRC-04 Report.

42 6.Produce a Draft Plan(s) initially based on one reception mode( fixed reception ) and after that endeavour to include other reception modes, starting with portable or mobile reception by accommodating the latter type either in an equitable manner (one per administration, or as requested by concerned administrations and then continue to accommodate the remaining second and third, … requirements per administration, as requested. After that continue with mobile reception or vice versa.

43 7. Produce a Draft Plan(s) based on different percentage of time in certain geographical area with extreme propagation condition, i.e. decoupling certain part of the planning area from other parts of the palling area.

44 8.Produce a Draft Plan(s) using different percentage of location than those specified in the RRC-04 Report for one mode of reception or all modes of reception.

45 9. Produce a Draft Plan(s) which contain all compatible digital allotments and/or assignments and include the entire or part of the remaining (incompatible) allotments/assignments in an Attachment /Annex to the Plan(s); with a time limit for coordination. After the expiry of the time limit delete them totally.

Produce a Draft Plan(s) which contain all compatible digital allotments and/or assignments and include the entire or part of the remaining (incompatible) allotments/ assignments in the Plan(s) with reduced protection margin or different location percentage. Take into account the degree of protection afforded in the subsequent modification procedure.

47 All the above-mentioned options need to be duly discussed, elaborated and provisionally agreed by IPG-1 and IPG-2 subject to decision of RRC-06. However, the PXT needs to be instructed by IPG-1 and IPG-2 to prepare necessary ways and means, including the corresponding software to implement them so as they will be available to administrations and to the second session as alternative solution for discussion and appropriate decisions by the second session.

48 The above- mention options must be available to administrations and to the second session in order that the Conference is provided with all possible solutions with basic the objective to produce an outcome/Plan(s) acceptable to all parties.

49 Thank you very much for your attention … See you at: IPG-1 : July 2005 IPG-2 : February 2006 RRC-06 : 15 May to 16 June 2006