Network Customer Meeting Access Metric Update November 16, 2006.

Slides:



Advertisements
Similar presentations
1 CDM Study October 19, 2011 Stan But Manager, Economics & Load Forecasting.
Advertisements

Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
October 8, 2013 Eric Fox and Mike Russo. AGENDA »Recent Sales and Customer Trends »Preliminary State Sales and Demand Forecast »Building a No DSM Forecast.
Technical Conference Avoided Cost Modeling January 6, 2015.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Texas Deregulation – A Success Story The ERCOT Market Framework Has Been A Success Implementation  Bilateral Contracts - Participants contract up to 100%
22 April 2010 EWEC 2010 Warsaw2 Jesper Munksgaard Ph.D., Senior Consultant Merit Order Effect of Wind Power – Impact on EU 2020 Electricity Prices.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
UNCLASSIFIED Department of Economic Development, Jobs, Transport and Resources Victorian Energy Efficiency Target Forum 16 April 2015 Village Roadshow.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Energy supply forecast Presentation to Connecticut’s Energy Future Conference by Bridgett Neely, London Economics International LLC December 2, 2004 Hartford,
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
On Target Group Coaching
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
ATC Major Projects Update Flora Flygt, Director of System Planning Franc Fennessy, Manager of Local Relations Wisconsin Industrial Energy Group August.
The Need for Electric Transmission Improvements in Dane County.
Production Cost Model Fundamentals
Avoided Costs of Generation
©2004 PJM 1 STATE OF THE MARKET REPORT 2003 Joseph E. Bowring Manager PJM Market Monitoring Unit FERC Briefing Washington, D.C. April 14, 2004.
Why is WPL filing a rate case?  Last Base Case Rates were set January, 2007  Cost of our utility investments must be reflected in prices our customers.
Economic Impact of New Hampshire Participation in Regional Greenhouse Gas Initiative University of New Hampshire Whittemore School of Business & Economics.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Energy Analysis Office Lori Bird Senior Energy Analyst National Renewable Energy Lab Trends in Utility Green Pricing Programs 10 th.
Cork June Dynamic modelling of transmission systems: costs of seasonal-zonal transmission loss factor charging and the impact of large-scale offshore.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
©2005 PJM 1 STATE OF THE MARKET REPORT 2004 Joseph E. Bowring Market Monitor FERC Briefing April 13, 2005.
PJM©2015 Updates to PJM Load Forecast Model OPSI Annual Meeting October 12, 2015 Tom Falin Manager – Resource Planning
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Evaluation of Wood Smoke Quantification and Attribution RTF PAC October 17, 2014.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
1 UFE Workshop Sponsored by COPS October 19, 2004.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
1 SMD and Efficiency Programs Standard Market Design (SMD) –Implemented March, 2003 –Major feature, locational assignment of costs and locational price.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Rocky Mountain States Sub-Regional Transmission Study December 9, 2003 Generation Additions Strawman.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Cost-Effectiveness Analysis of BGE’s DSM Programs Marshall Keneipp, PE Summit Blue Consulting, LLC Prepared for: Energy Efficiency and Conservation Stakeholders.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
1 A Conversation about MISO Paul Spicer November 8, 2007.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
CDM Study Stan But October 19, 2011
Further Information on MISO FTR Auctions
Evolving Economic Dispatch in SPP
CDM Study Stan But October 19, 2011
Wholesale Electricity Costs
Presentation transcript:

Network Customer Meeting Access Metric Update November 16, 2006

2 Agenda 2006 Access Goal 2006 Access Goal Purpose of Discussion Purpose of Discussion April Metric Discussion and Decision April Metric Discussion and Decision Locational Marginal Prices and Net Ratepayer Benefit Locational Marginal Prices and Net Ratepayer Benefit LMP Differentials in the Paddock- Rockdale Analysis LMP Differentials in the Paddock- Rockdale Analysis Revised Metric Proposal Revised Metric Proposal Access Goal Update Access Goal Update

Access Goal April: Define a metric to assess the value of access and congestion costs in ATC’s transmission system April: Define a metric to assess the value of access and congestion costs in ATC’s transmission system September: Propose a 4/1/2010 target for this metric that addresses the access concerns of our customers September: Propose a 4/1/2010 target for this metric that addresses the access concerns of our customers December: Propose changes to our construction plans to meet the 2010 target December: Propose changes to our construction plans to meet the 2010 target

4 Purpose of Presentation Discuss proposed changes to the Access metric Discuss proposed changes to the Access metric –What we proposed in April LMP differentials between ATC and neighboring hubs and within ATC LMP differentials between ATC and neighboring hubs and within ATC –What customers said Pursue projects Pursue projects Pay attention to what customers are actually paying Pay attention to what customers are actually paying –What we are recommending now Do not set target based on the LMP Differentials metric approved in April Do not set target based on the LMP Differentials metric approved in April Continue to report LMP Differential metrics as a way to track overall market position Continue to report LMP Differential metrics as a way to track overall market position Approve Expected Net Ratepayer Benefit as new metric for investment decisions and goal setting Approve Expected Net Ratepayer Benefit as new metric for investment decisions and goal setting

5 Purpose of Presentation –Why this proposal is an improvement Net Ratepayer Benefit is a more direct measure of the benefit ATC can bring to our customers ($) Net Ratepayer Benefit is a more direct measure of the benefit ATC can bring to our customers ($) Net Ratepayer Benefit includes project costs Net Ratepayer Benefit includes project costs –What you can expect on Access in December Adjusted construction queue based on screening 200 additional projects and evaluating the top projects using Expected Net Ratepayer Benefit Adjusted construction queue based on screening 200 additional projects and evaluating the top projects using Expected Net Ratepayer Benefit Target value for Expected Net Ratepayer Benefit Target value for Expected Net Ratepayer Benefit

6 Review April Metric Discussion

7 April Milestone: 2006 Access Goal Define a metric to assess the value of access and congestion costs in ATC’s transmission system Define a metric to assess the value of access and congestion costs in ATC’s transmission system Completed April 30, 2006: Completed April 30, 2006: Weighted average of: Weighted average of: –LMP differentials between ATC and 3 neighboring hubs (“Into” metric) –Absolute value of LMP differentials within ATC footprint (“Within” metric) GoalStatus

8 April Review - Into-ATC Metric LMP Premium to Neighboring Hubs ATC$53 NI $47 IL $47 MN $49 (MISO $50) ATC LMP is at a +$5.3/MWh (+11%) Premium to Outside Hubs with 1/3 weight on each hub October ’05 – September ‘06 In April, the 12-month average LMP differential was 19%.

9 Into-ATC Metric: LMP Differential to Composite Hub (monthly)

10 Factors Within and Outside ATC’s Control Affect Metrics ATC activities affecting metric ATC activities affecting metric –Expanding import capability –Upgrading transmission between ATC load zones –Upgrading transmission to low-cost ATC generators –Providing reliability-related transmission upgrades –Optimizing transmission outages Factors affecting metric outside ATC control Factors affecting metric outside ATC control –More generation at congested nodes –More generation close to load –Load growth in already constrained ATC zones –More use of low-cost fuel in ATC –Anything reducing LMP in MISO but not ATC –Changing coal/natural gas price differentials

11 Net Ratepayer Benefit Net Ratepayer Benefit: Savings in energy costs to retail customers (over the life of the project) net of project costs Net Ratepayer Benefit: Savings in energy costs to retail customers (over the life of the project) net of project costs Energy cost to retail customers in the MISO market Energy cost to retail customers in the MISO market –Cost of supply at load LMP –Minus: LMP revenues to utility –Plus: cost of utility generation –Minus: FTR revenues to utilities

12 LMP and Net Ratepayer Benefit Locational Marginal Prices vary depending on Locational Marginal Prices vary depending on –Size, location and behavior of load –Size, location, cost and behavior of existing generators –Additions and retirements of generation –Shifts in relative fuel prices –Size and location of transmission lines Expected Net Ratepayer Benefit uses changes in locational marginal prices that result from adding transmission lines based on an ex- ante analysis Expected Net Ratepayer Benefit uses changes in locational marginal prices that result from adding transmission lines based on an ex- ante analysis

13 Paddock-Rockdale Analysis Impacts on Into-ATC LMP Differentials and Net Ratepayer Benefit

14 Into-ATC Metric in 2011 (%) Without Paddock-Rockdale Reference Robust Economy High Retirements High Environmental Slow Growth Fuel Supply Disruption High Growth Wisconsin = Metric Without PR2 0%2%4%6%8%10%12%14%16%18% Into-ATC Metric as a % of Outside Reference Hub LMP Market Future  Significant differences in the metric due to different model assumptions regarding generation, load and fuel prices.  Transmission system is same in every future.

15 Contributors to Into-Metric Changes Significant Drivers of LMP Differentials in Paddock-Rockdale Analysis Change in Input Variable Change in LMP Differential ATC Load Forecast MW 6% Coal Generation Additions Outside WI MW 1% Load Forecast Outside ATC MW <1% So, what is the impact of transmission on LMP differentials? Note: Results are preliminary and not additive.

16 Into-ATC Metric in 2011 (%) Impacts of Transmission Improvements Reference Robust Economy High Retirements High Environmental Slow Growth Fuel Supply Disruption High Growth Wisconsin 1.1% 5.1% 0.3% 0.4% 1.2% 1.1% 0.8% 0%2%4%6%8%10%12%14%16%18% Into-ATC Metric as a % of Outside Reference Hub LMP Market Future ($millions) = Metric With PR2 = Metric Without PR2

17 Net Ratepayer Benefit Impact of Transmission Improvements Future Annual Savings ($m) Net Ratepayer Benefit ($m) Reference11175 Robust Economy High Retirements 171,077 High Environmental 1029 Slow Growth 3(106) Fuel Supply Disruption 1001,165 High Growth Wisconsin 17613

18 Lessons Learned LMP differentials are impacted by market events beyond ATC’s control LMP differentials are impacted by market events beyond ATC’s control ATC has developed a methodology for estimating net ratepayer benefits resulting from transmission improvements ATC has developed a methodology for estimating net ratepayer benefits resulting from transmission improvements Net Ratepayer Benefits are the best way to evaluate transmission investment decisions Net Ratepayer Benefits are the best way to evaluate transmission investment decisions  We did not recommend setting a target based on the LMP Differentials metric approved in April.

19 September Milestone 2006 Access Goal Propose a 4/1/2010 target for this metric that addresses the access concerns of our customers Propose a 4/1/2010 target for this metric that addresses the access concerns of our customers Adopt Expected Net Ratepayer Benefit as the metric Adopt Expected Net Ratepayer Benefit as the metric Put in service by 2010 projects that provide $xxx million of Net Ratepayer Benefit over the life of the projects Put in service by 2010 projects that provide $xxx million of Net Ratepayer Benefit over the life of the projects –Will provide a target in December Target will be measured on an ex- ante basis Target will be measured on an ex- ante basis New projects will be analyzed across a range of futures (details to be developed) New projects will be analyzed across a range of futures (details to be developed) GoalRecommendation

20 December Milestone 2006 Access Goal Propose changes to our construction plans to meet the 2010 target Propose changes to our construction plans to meet the 2010 target Inserted Paddock-Rockdale and associated projects into construction queue Inserted Paddock-Rockdale and associated projects into construction queue For additional projects For additional projects –Developed an efficient economic screening process –Identified 200 projects for screening and prioritization –Evaluate Net Ratepayer Benefits of top projects –Adjust the construction queue based on net ratepayer benefit and in- service date of projects Present target number Present target number GoalStatus/Recommendation