Peter-Raymond Kettle MEG Review February 2008 1 MEG Commissioning & Engineering Run 2007.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
PSI - Jun. 27th, Status of the electronics systems of the MEG experiment.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
The PSD upgrade performance Front-End-Electronics MAPD HV system Temperature stabilization MAPD gain monitoring system Slow control Readout –present and.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Measurement of the Positive Muon Lifetime to 1 ppm David Webber Preliminary Examination March 31, 2005.
A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
14 February 2007Fabrizio Cei1 INFN and University of Pisa PSI Review Meeting PSI, 14 February 2007 Status of MEG Software.
DAQ+trigger operation during 2008 run D. Nicolò University of Pisa & INFN, Pisa.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Peter-Raymond KettleMEG Review February MEG 2008 Run Run Coordinator’s view E e /E Max 
MEG 2009 現状と展望 東京大学素粒子物理国際研究センター 岩本敏幸 他 MEG コラボレーション 日本物理学会 2009 年秋季大会 甲南大学岡本キャンパス.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Calibration and monitoring of the experiment using the Cockcroft-Walton accelerator G. Signorelli Sezione di Pisa MEG Review meeting - 20 Feb On.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
PSI - Jul. 18th, Status of the electronics and DAQ systems of the MEG experiment.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Peter-Raymond Kettle MEG Review February BeamBeam LineLine StatusStatus.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Xenon Detector Installation schedule Satoshi MIHARA.
ECAL Off detector Electronics Workshop Lisbon April T. Camporesi ECAL activity sites 2005 Integration (now) 904 (now) Cosmic ray calibration (May)
1 CERN 2007 Installation and Run Plan Erika Garutti & Fabrizio Salvatore.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
MEG 実験 2009 液体キセノン検出器の性能 II 西村康宏, 他 MEG コラボレーション 東京大学素粒子物理国際研究セン ター 第 65 回年次大会 岡山大学.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
MEG I Accounting & Retrospective Peter-Raymond KettleMEG Fukuoka Meeting October
Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20071 Beam Schedule Update.
CLAS12 Commissioning with Cosmincs
Preparation for CERN test beam
Luminosity Monitor Status
Liquid Xenon Detector for the MEG Experiment
CMS Preshower: Startup procedures: Reconstruction & calibration
G0 Accelerator Planning Meeting (11/1/05)
TC status & remaining tasks
Preparation of the CLAS12 First Experiment Status and Time-Line
Mini Tower Preliminary Results
MEG II実験 液体キセノン検出器の建設状況
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Trigger operation during 2007 run
Presentation transcript:

Peter-Raymond Kettle MEG Review February MEG Commissioning & Engineering Run 2007

Peter-Raymond KettleMEG Review February Beam Time Goals & Constraints Engineering Run Goals: all parts of the Detector Operational all parts of the Detector Operational Read-out/Data-taking Chain tested Read-out/Data-taking Chain tested all Triggers implemented + Rate Check all Triggers implemented + Rate Check full set of Calibration & Test Data full set of Calibration & Test Data contribute to “Long-term” Goal of contribute to “Long-term” Goal of understanding our Detector understanding our DetectorConstraints: Experiment Change-over - Experiment Change-over - Kottmann et al. beam time Kottmann et al. beam time - in total 2 weeks extra beam time given to them!!! - in total 2 weeks extra beam time given to them!!! weeks for  -beamline installation + BTS cool- down after Kottmann et al weeks for  -beamline installation + BTS cool- down after Kottmann et al. Calorimeter Cryostat delivery + seal problem Calorimeter Cryostat delivery + seal problem LXe HV feed through problem LXe HV feed through problem optimal either Beginning or End of a Period optimal either Beginning or End of a Period Calo. Delay Feed through problem Calo. Delay Feed through problem but many task could Progress in parallel  Only 3 Months available for Beam !!!

Peter-Raymond KettleMEG Review February Commissioning & Engineering Run With 3 months to achieve proposed goals needed “rigid” organization & planning but flexibility to implement changes With 3 months to achieve proposed goals needed “rigid” organization & planning but flexibility to implement changes Run Coordindation group formed: Run Coordindation group formed: 6 beam coordinators + 1 offline coordinator 6 beam coordinators + 1 offline coordinator  Split time into 2 overlapping parts: Split time into 2 overlapping parts: COMMISSIONINGCOMMISSIONING Full Run Full Trigger Implementation DAQ/Readout chain tested Calibration & Test Data + CEX Full Run Full Trigger Implementation DAQ/Readout chain tested Calibration & Test Data + CEX Parasitic Run Beam optimization in parallel with Debug, Tune & Calibrate Parasitic Run Beam optimization in parallel with Debug, Tune & Calibrate LED, , C-W Cosmics & Michel e + LED, , C-W Cosmics & Michel e + 2 x 12 Hrs Only detector Experts nights 2 x 12 Hrs Only detector Experts nights 3 x 8 Hrs Shift leader + 1 crew 3 x 8 Hrs Shift leader + 1 crew to allow for flexibility + continuity: Coordinators each 2 weeks Coordinators each 2 weeks Daily Run Meetings (on-site) Daily Run Meetings (on-site) Weekly Video Meeting (Calloboration) - strategy Weekly Video Meeting (Calloboration) - strategy Web-based schedule + shift list + on-call list Web-based schedule + shift list + on-call list

Peter-Raymond KettleMEG Review February Organization In Practice Continuity + Schooling Continuity + Schooling staggered + overlapping shifts staggered + overlapping shifts basic 3 days/person shift-block basic 3 days/person shift-block detector experts start as shift detector experts start as shift leaders leaders Information Access Information Access “How to” information database for shift “How to” information database for shift crews on MEGWiki – grew with time crews on MEGWiki – grew with time

Peter-Raymond KettleMEG Review February Experimental Conditions – Beam Line (1) Improved COBRA He-environment: monitoring with O 2 -sensors ~ (97±1)% - but air doping was needed for DCs (1) Improved COBRA He-environment: monitoring with O 2 -sensors ~ (97±1)% - but air doping was needed for DCs O 2 sensor (2) Target found to be slightly misaligned! target made for  = 21° but due to DC support could only be 13° inclined expect only ~ 75% of  s to hit target for 2007 (2) Target found to be slightly misaligned! target made for  = 21° but due to DC support could only be 13° inclined expect only ~ 75% of  s to hit target for 2007 !!! Laser check (estimate)!!! !!! Laser check (estimate)!!! slant angle =(12.5±0.5)° slant angle =(12.5±0.5)° vertical misalignment  =(22.8  5.0) mr shift of Laser cross  SHIFT =(5.51.0) mm !!! Laser check (estimate)!!! !!! Laser check (estimate)!!! slant angle =(12.5±0.5)° slant angle =(12.5±0.5)° vertical misalignment  =(22.8  5.0) mr shift of Laser cross  SHIFT =(5.51.0) mm (3) New degrader needed (air doping + range-curve) 300  m Mylar (old 480  m CH 2 ) Now can transmit 1  10 8  + /s to COBRA centre with Degrader (2mA I p ) For Run used: Ultra-low Intensity ~ 5  10 6  -stops/s Nominal Intensity ~ 3  10 7  -stops/s (3) New degrader needed (air doping + range-curve) 300  m Mylar (old 480  m CH 2 ) Now can transmit 1  10 8  + /s to COBRA centre with Degrader (2mA I p ) For Run used: Ultra-low Intensity ~ 5  10 6  -stops/s Nominal Intensity ~ 3  10 7  -stops/s

Peter-Raymond KettleMEG Review February Detectors etc. TCs DCs Calo. NaI Full complement of detectors Full complement of detectors Calo: initial problems with HV initial problems with HV feedthroughs – noise + feedthroughs – noise + splitter input-stage damaged splitter input-stage damaged Liquid purification success Liquid purification success 70l/hr ~ 250 hrs for > 3m 70l/hr ~ 250 hrs for > 3mCalo: initial problems with HV initial problems with HV feedthroughs – noise + feedthroughs – noise + splitter input-stage damaged splitter input-stage damaged Liquid purification success Liquid purification success 70l/hr ~ 250 hrs for > 3m 70l/hr ~ 250 hrs for > 3m DCs: external HV problem in external HV problem in pure He air-doping needed pure He air-doping neededDCs: external HV problem in external HV problem in pure He air-doping needed pure He air-doping needed TCs: late arrival APD power late arrival APD power supplies + DAQ problems supplies + DAQ problemsTCs: late arrival APD power late arrival APD power supplies + DAQ problems supplies + DAQ problems C-W: proved v. successful proved v. successful Li (17.6, 14.6 MeV) + B (4.4, 11.7, 16.1 MeV) targets – Energy + Timing C-W: proved v. successful proved v. successful Li (17.6, 14.6 MeV) + B (4.4, 11.7, 16.1 MeV) targets – Energy + Timing NaI: automated mover automated mover temp. contolled APDs temp. contolled APDs  E/E ~5-6% (  )  E/E ~5-6% (  )NaI: automated mover automated mover temp. contolled APDs temp. contolled APDs  E/E ~5-6% (  )  E/E ~5-6% (  ) C-W

Peter-Raymond KettleMEG Review February Trigger + DAQ Trigger + Splitters Trigger + Splitters Online Cluster Megonxx Online Cluster Megonxx Staged trigger implementation: Staged trigger implementation: Single detectors + Michel trigger Single detectors + Michel trigger Coincidence detectors e.g. DC+CR Coincidence detectors e.g. DC+CR TC+LXe rad.  -decay, 11 B C-W (narrow  t=20 ns) TC+LXe rad.  -decay, 11 B C-W (narrow  t=20 ns) TC+DC TC+DC Direction matching    e  (planned TC fibres) Direction matching    e  (planned TC fibres) too slow  XEC PMT-index + TC-bar(index,z) too slow  XEC PMT-index + TC-bar(index,z) where z from bar charge-ratio where z from bar charge-ratio 24 Trigger types introduced (max. 32) 24 Trigger types introduced (max. 32) Multiple triggers with prescaling  Read-out Trig. Monitoring (cyclic-buffers) Works nicely Trig. Monitoring (cyclic-buffers) Works nicely Staged trigger implementation: Staged trigger implementation: Single detectors + Michel trigger Single detectors + Michel trigger Coincidence detectors e.g. DC+CR Coincidence detectors e.g. DC+CR TC+LXe rad.  -decay, 11 B C-W (narrow  t=20 ns) TC+LXe rad.  -decay, 11 B C-W (narrow  t=20 ns) TC+DC TC+DC Direction matching    e  (planned TC fibres) Direction matching    e  (planned TC fibres) too slow  XEC PMT-index + TC-bar(index,z) too slow  XEC PMT-index + TC-bar(index,z) where z from bar charge-ratio where z from bar charge-ratio 24 Trigger types introduced (max. 32) 24 Trigger types introduced (max. 32) Multiple triggers with prescaling  Read-out Trig. Monitoring (cyclic-buffers) Works nicely Trig. Monitoring (cyclic-buffers) Works nicely lcmeg05lcmeg05 lcmeg04lcmeg04 lcmeg03lcmeg03 lcmeg02lcmeg02 lcmeg01lcmeg01 Offline Cluster lcmeg Offline Cluster lcmeg Limits: DAQ/DRS readout limited by VME (83MB/s) DAQ/DRS readout limited by VME (83MB/s) ~ 30 events/s full waveforms (threading) ~ 30 events/s full waveforms (threading) Online (backend) 1.2TB storage Online (backend) 1.2TB storage Offline (lcmeg) 64 CPUs + 50TB disk Offline (lcmeg) 64 CPUs + 50TB disk “Lazylogger” autocopy Online  Offline “Lazylogger” autocopy Online  Offline factor 2 compression factor 2 compression DRS3 – tested improved (clock signals, temp eff. Etc.) DRS v2

Peter-Raymond KettleMEG Review February MEG Monitoring Tools MSCB Area Network SCS2000 controller SCS2000 controller In order to ensure smooth experimental running !!! monitoring essential !!! SLOW-CONTROL:   MSCB-submaster+ SCS dedicated LabView control software   Midas history virtually all equipment monitored & logged In order to ensure smooth experimental running !!! monitoring essential !!! SLOW-CONTROL:   MSCB-submaster+ SCS dedicated LabView control software   Midas history virtually all equipment monitored & logged ONLINE:  Data Quality using Argus MEGanalyzer with Event Display digital oscilloscope for all channels digital oscilloscope for all channels LXe, TCs, DCs, NaI, Trig., DRS included LXe, TCs, DCs, NaI, Trig., DRS included  Midas Voice Alarm system MEGanalyzer Midas History

Peter-Raymond KettleMEG Review February CEX – Calorimeter  0 -Calibration  54.9MeV 82.9MeV 1.3MeV for  >170 o 0.3MeV for  >175 o   170 o 175 o After Data-taking with   e  trigger still time for planned “reduced” CEX Run: still time for planned “reduced” CEX Run: LH 2 -target Setup  -Beam > 1.4 MHz of 70.5 MeV/c  -  -Beam > 1.4 MHz of 70.5 MeV/c  - LH 2 -Target + Control & Stabilization System LH 2 -Target + Control & Stabilization System LHe supply (dewars) LHe supply (dewars) 9-Crystal NaI array + Pb/Scintillator as Tag 9-Crystal NaI array + Pb/Scintillator as Tag LXe Calorimeter LXe Calorimeter NaI LH 2 -target setup/testing in // with muon data-taking outside zone ~ 5 days Data-taking 450 Runs ~ 2.2 M events  H ~ 8.5 mm  V ~ 7.5 mm fully contained

Peter-Raymond KettleMEG Review February SummarySummary Due to the “Great Effort” by All – we were able to meet our goals for the Engineering Run having tested ALL Detector Parts having tested ALL Detector Parts implemented all Trigger Chains & checked Rates implemented all Trigger Chains & checked Rates full set of Calibration & “Physics” Data taken full set of Calibration & “Physics” Data taken RunData In Total In Total 9974 Runs taken amounting to ~ 29.5 TB of Data ~ 29.5 TB of Data Analysis is in progress !!! In Total In Total 9974 Runs taken amounting to ~ 29.5 TB of Data ~ 29.5 TB of Data Analysis is in progress !!! Chronology Data transferred TB