Organization and design of WIS data-communication structure Item 8.2 Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS) ET-CTS-2 (Tououse,

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
SOA for EGovernment 1 Emergency Services Enterprise Framework: A Service-Oriented Approach Sukumar Dwarkanath COMCARE Michael Daconta Oberon Associates.
RMDCN Technical Solution
WIS DATA-COMMUNICATIONS FUNCTIONS AND SERVICES WIS shall provide various types of services (with different quality of service) to meet the different requirements.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
World Meteorological Organization Working together in weather, climate and water WMO Information System (WIS) Meeting of the ET-WISC Feb 2010 David.
Slide 1 ET-CTS - GISC Network Bandwidth RequirementsSlide 1 GISC network bandwidth requirements A proposed method for an educated guess… Hiroyuki Ichijo.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
World Meteorological Organisation (WMO) Observing and Information Systems Department WMO INFORMATION SYSTEM (WIS) --- COMPLIANCE SPECIFICATIONS OF GISC,
International Telecommunication Union An Insight into BDT Programme 3 Marco Obiso ICT Applications and Cybersecurity Division Telecommunication Development.
WORLD METEOROLOGICAL ORGANIZATION Weather - Climate - Water
1 Trade facilitation: Benefits and Capacity Building for Customs UNECE International Forum on Trade Facilitation, May 2003 Kunio Mikuriya Deputy.
IMTN and managed data network services Technical Conference on the WIS (Seoul, 6-8 November 2006) Hiroyuki ICHIJO (Japan Meteorological Agency.
WMO WIGOS Implementation & (WIP) RA I Sub-Regional Workshops for WIGOS and WIS for West / North Africa Nov 2013 Dr I. Zahumensky, WIGOS-PO.
World Meteorological Organization Working together in weather, climate and water ET-WISC INTERFACES WMO; OBS/WISwww.wmo.int WMO.
WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
Progress Report from ET-CTS (Expert Team on WIS-GTS Communication Techniques and Structure) Doc. 4.3 (1) Presentation version ICG-WIS-6 (Seoul, February.
V-GISC Presentation – ET_WISC – Geneva - February v-GISC key functionalities ET_WISC meeting 2-5 February 2010 Jean-Pierre Aubagnac, Jacques Roumilhac.
November 2006 TECO-WIS, Seoul 1 Definition of the Internet Network of networks –millions of smaller domestic, academic, business, and government networks.
Telecommunication status in RA VI RA VI Workshop on the implementation of WIS Sofia, Bulgaria, 1-3 November 2011 Matteo Dell’Acqua - Météo France Chair.
Understanding and Implementing WMO INFORMATION SYSTEM
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
Abteilung Systeme und Betrieb ICT-ISS, Geneva November 2008 Page 1 WIS GISCs & DCPCs Functions and Specifications Heinrich Knottenberg
- 1 - Heinrich Knottenberg ET WISC: WIS Development in 2006.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
Near East Plant Protection Network for Regional Cooperation & Knowledge Sharing Food and Agriculture Organization of the United Nations An Overview on.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
Value and Benefits of the WMO Information System (WIS)
Managing & Moving Weather, Water and Climate Information in the 21 st Century WMO Information System (WIS) 4 th WCRP Observations and Assimilation Panel.
Technical Review Group (TRG)Agenda 27/04/06 TRG Remit Membership Operation ICT Strategy ICT Roadmap.
Lesson 11-Virtual Private Networks. Overview Define Virtual Private Networks (VPNs). Deploy User VPNs. Deploy Site VPNs. Understand standard VPN techniques.
1 World Meteorological Organization WMO Information System WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water.
Future WMO Information System (FWIS) Hiroyuki Ichijo (Japan Meteorological Agency) WMO/WSIS Session on Reducing Natural Disaster Risk through Technical.
EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group for Meteorological Satellites - CGMS EUM/SIR/VWG/12/0375, v1, 10 July 2012 Coordination Group.
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
1 World Meteorological Organization AR report to ADC September 2008 Presented by Don Middleton (NCAR), on behalf of WIS and Dave Thomas, Jean-Michel.
The WMO Information System (WIS)
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
Virtual Private Ad Hoc Networking Jeroen Hoebeke, Gerry Holderbeke, Ingrid Moerman, Bard Dhoedt and Piet Demeester 2006 July 15, 2009.
May 2008 ET-CTS Toulouse 1 Debriefing on WIS Aspects Discussions from the ICM IMTN Cloud 1 (Washington Nov 2007) Jean-François Gagnon Telecommunications.
Collaboration for Beijing and Tokyo GISC prototypes -- Status of WIS center development and planning -- Submitted by Hiroyuki ICHIJO (Japan) and SHI Peiliang.
Region I WIS Pilot Projects. Background Inadequate resources to meet the costs of leased dedicated links. Frequent outages of the leased dedicated links.
Promoting excellence in social security Building on sector wide commonalities to enhance the benefits of Information.
WIS data-communications functions and services, and implementation Progress report on Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
World Meteorological Organization Working together in weather, climate and water WIGOS and WIS WMO M. Berechree (WIGOS) D. Thomas (WIS)
WIS data-communication structure Tentative outcome of study by ET-CTS (Expert Team on WIS-GTS Communication Techniques and Structure) ICG-WIS-5 (Brasilia,
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
World Meteorological Organization Working together in weather, climate and water WMO Information System (WIS) Progress Report Document 3.5 Prof G-R-Hoffmann.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
WMO WIS strategy – Life cycle data management WIS strategy – Life cycle data management Matteo Dell’Acqua.
2nd GEO Data Providers workshop (20-21 April 2017, Florence, Italy)
WIS ET-CTS Components ET-CTS Toulouse ET-CTS Toulouse
Lab A: Planning an Installation
Requirement for Full Global Operation on WIS Survey on the WIS Doc
AR report to ADC 14 May 2007 Presented by Hiroyuki Ichijo (JMA)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
RAII WIS IMPLEMENTATION PLAN
WIS data-communication structure Outcome of study by ET-CTS (Expert Team on WIS-GTS Communication Techniques and Structure) Please consider our Earth.
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
Internet Interconnection
ET-CTS - Cache in and through the cloud Background information
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
WIS Strategy – WIS 2.0 Submitted by: Matteo Dell’Acqua(CBS) (Doc 5b)
Good Morning 1/17/2019.
ET-CTS - Cache in and through the cloud
ET-WISC structure and work plan
WIS Project Office WMO Managing WIS WIS Project Office WMO
Presentation transcript:

Organization and design of WIS data-communication structure Item 8.2 Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS) ET-CTS-2 (Tououse, May 2008) Hiroyuki ICHIJO (Japan)

ICM-IMTN (cloud I) (October 2007) Progress Report Interim Report ET-CTS-1 (Tokyo, April 2006) ICG-WIS-3 (Beijing, 5-8 September 2006) Follow-up discussion Outcome Compiling further study items ICG-WIS-4 (Reading, 4-7 September 2007) Follow-up Discussion Contribution ET-CTS-2 (Toulouse, May 2008) ICG-WIS-5 (Brasilia, July 2008) DratfRecommendation ICT-ISS (4Q 2008) CBS-XIV (Croatia, 25 March-2 April 2009) Position of our meeting Recommendation We are here Outcome RA VI ROC & Steering Group Meeting (Vienna, 3-6 June 2008) VGISC-info & ET-WISC (Darmstadt, June 2008)

Foreword Cg-XV agreed that the WIS implementation plan has two parts that would be developed in parallel: Part A: the continued consolidation and further improvements of the GTS for time-critical and operation-critical data, including its extension to meet operational requirements of WMO Programmes in addition to the World Weather Watch (including improved management of services); Part B: an extension of the information services through flexible data discovery, access and retrieval services to authorized users, as well as flexible timely delivery services.

Part A : improved GTS for time-critical and operation-critical data for all WMO Programmes

1. SWOT analysis of the GTS StrengthsWeakness The GTS is: a) in operation on a 24x7 basis; b) functioned well under interoperation rules; c) secure as a private network; d) organized regionally and globally by sharing roles and responsibility. e) Necessity of sustainable funding is well understood. a) Higher total running cost b) No overall operational management c) Difficulty in discovery of available data & arranging delivery d) Difficulty in organizing traffic between non- adjacent centers & adjusting routing e) Limited Bandwidth f) Imperfect achievement in meeting the requirements of time-critical data exchange g) Slow in responding to changing user requirements and technical developments OpportunitiesThreats a) IMTN and RMDCN demonstrate that the use of managed data network services leads to one of successful evolution ways. b) Potential for trend from traditional bilateral to more coordinated approaches c) Infiltration of IP migration strategy d) Range expansion of standardized TCP/IP based applications a) Some centers fail to catch up or keep up with the modernization. As the result, they act as a brake on progress and incur security risk. b) Lack of overall traffic management becomes a problem, e.g. dividing traffic between private network and the Internet, priority control for WWW operation-critical and other traffic. c) Failure to address new requirements leads WMO members to the use of alternative networks outside WMO structure.

Key ideas from SWOT analysis (1) Use of cost-effective managed data network services through a coordinated approach; (2) Necessity of overall management for data exchange operation with security; (3) New applications taking a place of store-and-forward mechanism; (4) Coordination scheme to respond to changing user requirements and technical developments; (5) Preparing a remedy for differences between centers in progress speed.

Consideration approaches Totality approach (GMDCN idea) Individual approach Key ideas from SWOT Fundamental solutionDetailed solutions Design baseline Most feasible design

2. Totality approach Evolving GTS Additional Meteorological Networks GMDCN WIS real-time network Supplied by a single provider The fundamental concept for WIS real-time networks is on the precondition of establishment of a single coordinated global network (Global Meteorological Data Communication Network: GMDCN)

Design principles of GMDCN based on the key ideas (1) The GMDCN should provide any-to-any connectivity in transport level for all participating centers by using a managed data network service (e.g. IP-VPN with MPLS could be most feasible); (2) A well-organized framework with its control body is indispensable for overall technical and administrative management (e.g. traffic, security, monitoring, backup arrangement, competitive procurement and contract, funding coordination and so on); (3) Required connections for new and traditional message switching applications between centers are mapped on the top of the any-to-any connectivity network (i.e. separation of application level communication from transport level capability);

Design principles of GMDCN based on the key ideas (cont.) (4) The GMDCN should keep scalability and flexibility to respond to new requirements from all WMO and related international programmes (e.g. improving exchange of high priority data and products in support of a virtual all hazards network within the WIS-GTS, increasing participating centers, applications, data types and volume, and easy introduction of new technology); (5) Gateway facilities/functions and guidelines should be provided to promote the migration to the GMDCN.

Example of GMDCN cloud with gateways Site D acts as a gateway for Site F Site A acts as a gateway for Site G

Practical items to study further (1) Connection with WIS participants other than NMHSs DCPCs and NCs operated by non-NMHSs are basically connected with a GISC in their responsible area. There are three types of the connections as follows: a) Direct type by an additional meteorological connection through the GMDCN; b) Direct type by other means such as Internet VPN and bilateral dedicated links; c) Indirect type through a gateway operated by their associated NMHSs. Although administrative and security issues should be coordinated, non-NMHS participation in the GMDCN will facilitate collaboration with other international community.

Practical items to study further (cont.) (2) Backup solution Backup solution for the GMDCN keeping any-to-any connectivity is practically nothing but Internet based methods in the view of allowable cost for all centers. Internet VPN solution is desirable. There is another backup consideration in a GISC failure case. It is beneficial that the GMDCN model provides backup connections with alternate GISCs easily. (3) Gateway issues A small number of core GMDCN centers such as GISCs and major RTHs should act as a gateway enabling data exchange between the inside and outside of the GMDCN. Each gateway center has responsibility for interfacing with the outside centers and protecting the GMDCN against unauthentic access from the outside. Interface details should be coordinated between gateway and outside centers.

Practical items to study further (cont.) (4) Administrative aspect There are lots of administrative barriers to realize the GMDCN on a large scale: # consensus process of all participants; # coordinated procurement on one-stop contract manner; # overall operational management scheme; # governance body. Managed Network by a single provider GISC DCPC NC Collaboration Framework MoU Contract with SLA

3. Individual approach

3.1 WIS core network All GISCs must synchronize large volume of data and products with their metadata catalogues on a real-time basis literally through a WIS core network. Therefore indispensable requirements of the core network are predictability and stability in available throughput (bandwidth and network delay time), reliability for continuous operation on 24x7 basis without interruption and security against malicious attacks such as intrusion, denial of service, tampering, spoofing and snooping. To meet the requirements, not the Internet but closed network services on SLA (Service Level Agreement) should be used.

Full-mesh topology of WIS core network Full-mesh topology will bring two benefits: (1) maximum redundancy in the configuration of GISC backup channels; (2) operational simplicity in data synchronization It is not easy to realize the full-mesh GISC topology unless the two clouds are consolidated into a single coordinated one. In the sense, the IMTN project is expected to steer the next plan for a single cloud. GTS IMTN WIS core network More than 180 centers Max 18 centers Less than 10 centers

Practical items to study further (1) Management and coordination scheme Management and coordination scheme of the core network should be carefully examined. Especially a coordination body may have to be restricted to IMTN centers or GISCs to keep a light footwork for evolution to an innovative future network. (2) Multicast-oriented network Considering synchronization among GISCs, the WIS core network may be designed on multicast-oriented architecture in future. IPv6 is a promising opportunity to migrate from unicast to multicast- oriented networks. However IPv6 may be premature. GISC Unicast-oriented network GISC Responsibility Area GISC Multicast-oriented network GISC Responsibility Area Multicast group Duplicated transmission

Practical items to study further (cont.) (3) Backup solution of WIS core network a) Dual network configuration by two different network suppliers in association with a sophisticated routing protocol for effective load balancing (e.g. not HSRP (Hot Standby Routing Protocol) but EIGRP (Enhanced Inter-Gateway Routing Protocol)) However it may be not necessarily practical from the views of effectiveness, difficulty in implementation, traffic management and cost tolerance. b) The Internet backup would be a promising practical solution. RMDCN in RAVI has a comprehensive backup plan. Their empirical outcome will be a good contribution to the study, especially guideline on the following points: # Backup control, automatic or manual # Security requirements and sustainable level # Limitation of backup traffic

GISC WIS core network #1 WIS core network #2 GISC Dual network configuration Consideration points: i)Risk avoidance by two suppliers ii)Cost tolerable condition iii)Usual traffic load balancing iv)Administrative and technical aspects in implementation GISC WIS core network Internet GISC Internet backup Consideration points: i)Backup control (automatic or manual) ii) Security requirements and sustainable level iii) Management of backup traffic

3.2 Time-critical operational links (GISC-DCPC, GISC-NC, DCPC-NC) (1) Links between NMHSs NMHS links are composed within GTS, although topological rearrangement may be slightly needed. Traditional store-and-forward mechanism of the GTS is able to provide a pseudo indirect path for data exchange between any two WIS centers. However there are operational problems in switching delay, routing arrangement and format restrictions. To meet requirements in timeliness, adjustment of the current GTS configuration is desirable so that all hierarchical connections of GISC- DCPC, GISC-NC and DCPC-NC become more directly. (2) Links between NMHS and non-NMHS (other organization) Links including non-NMHS are possibly established by special arrangement within WIS framework. Authorized NCs and DCPCs operated by non-NMHSs are located outside of the GTS world. New links by other telecom means such as Internet VPN and ad hoc dedicated connections are needed.

Practical items to study further (1) Adoption of Internet VPN links and introduction of GMDCN concept Since various kinds of WIS centers have to keep sustainable operational links, it is essential to seek cost-effective options to minimize their recurrent costs. Reasonable link options are definitely designed on the Internet basis. Most promising option is an Internet VPN link. In addition complement options, e.g. HTTPS Web data ingest and data collection & distribution should be prepared as a GISC function. On the other hand, there must be NCs which prefer stable dedicated links to Internet links. To meet their requirements with cost- effectiveness, a collaboration framework to join a common managed network service should be coordinated as well as the INTN project. In the sense, the GMDCN concept is possibly a good solution for time- critical operational links which directly connects two WIS centers.

Practical items to study further (cont.) (2) Traffic consideration for network design In most cases, traffic unbalance between incoming and outgoing is inevitable. It is worth studying possibilities of appropriate methods for asymmetric capacity, e.g. flexible contract manner of managed network services, combination of two-way and one-way links, and addition of complementary Internet VPN link for overflow traffic. GISC DCPC GTS Internet GISC DCPC GTS (two-way) One-way Example ideas for asymmetric capacity

3.3 Multicast component Large volume of data set required by NCs and authorized users with common interests should be distributed efficiently on multicast manners. The standard DVB-S multicast technology allows use of off-the-shelf inexpensive V-SAT equipment. EUMETcast is one of successful examples. IGDDS ( Integrated Global Data Dissemination Service ) is a collaboration scheme for satellite data and product circulation and is now one of WIS core components. It is expected that the IGDDS would facilitate the WIS multicast plan for global coverage.

4. Standardization of protocols and procedures The standardization of protocols and procedures has implications in the feasibility of technical solutions as well as smoothness of the subsequent implementation. In this context, the team should contribute technical recommendations to regulatory documentation. Possible technical contribution items are as follows: (1) Comparison of VPN techniques (IPsec, PPTP, SSL and SSH) (2) Differences between WMO standards in Attachment II-15 (Use of TCP/IP on the GTS) and industrial standards (3) Standard VSAT An important aspect is the definition of the governance structures to control data flows and growth of traffic. Not telecommunication supervisors but data managers may control data flows and growth. Governance of this aspect of the data exchange needs to be redefined. 5. Governance organization and traffic management

Part B : for data discovery, access and retrieval services, including time delivery services

1. Connectivity Data Discovery, Access and Retrieval (DAR) services with relevant data management functions have policy principles as follows: (1) Procedures for managing of access rights, control of data retrieval, registration and identification of users, etc can be defined, as and when required; (2) Anonymous downloading is technically possible, but depends on whether a NC permits that feature; (3) DAR mechanisms have no system-inherent features that would violate international legal frameworks. To meet the principles, DAR components and connection networks with necessary protocols and procedures should be based on universal standards and independent from specific vendor architectures. Inevitably DAR services are implemented essentially through the Internet with HTTP, FTP and other Internet based protocols. The WIS core network is expected to support the services with synchronization of metadata catalogues.

1. Connectivity (cont.) WIS core network Internet Discovery, Access and Retrieval (DAR) Connectivity of DAR services

1. Connectivity (cont.) Timely delivery services for data and products based on delayed mode "push" mechanism are possibly implemented through a combination of dedicated telecommunication means and of public data networks, especially the Internet.

2. Authentication and certification Quote the outcome of discussion. 3. Supporting protocols Quote the outcome of discussion.

Recommendations Basically recommendations will be developed during the meeting and be finalized after the meeting by correspondence. 1. Recommended organization and design for Part A In my personal thought: a) GMDCN concept is recommendable as a middle-term future goal; b) however it is necessary to add more practical/pragmatic points from the study of the individual approach; c) furthermore we should take into consideration the study of item 8.4 "Strategy for phased implementation of WIS data communication structure". 2. Recommended organization and design for Part B during the meeting

Thank you for your attention and valuable comments in advance Cheers! ET-CTS, one of the most powerful teams Please consider our Earth environment before printing