February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 Jim Thomas - LBL A Brief Introduction to the STAR Time Projection Chamber Jim Thomas Lawrence Berkeley National Laboratory June 4 th, 2009.
TPC DETECTOR SEGMENTATION OF THE READOUT PLANE LATERAL VIEW OF THE TPC
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
TPC status Marian Ivanov. Outlook TPC performance ExB correction Alignment Nonlinearities and edge effects Drift velocity calibration.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
HLT & Calibration.
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
Dariusz Miskowiec, TRD status meeting Oct alignment... i.e. how to figure out where the detectors are, and how to use this knowledge in the reconstruction.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
TPC for 2p radioactivity studies Bertram Blank, CENBG.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Progress with the TPC gas monitor Dariusz Antończyk Outline : Motivation Simulations Measurements Summary & Outlook.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
TB Peter Glässel, Heidelberg1 TPC Progress.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Status of NA62 straw electronics Webs Covers Services Readout.
TPC in Heavy Ion Experiments Jørgen A. Lien, Høgskolen i Bergen and Universitetet i Bergen, Norway for the ALICE Collaboration. Outlook: Presenting some.
Como, October 15-19, 2001H.R. Schmidt, GSI Darmstadt 1 The Time Projection Chamber for the CERN- LHC Heavy-Ion Experiment ALICE ALICE Detector overview.
22 September 2005 Haw05 1  (1405) photoproduction at SPring-8/LEPS H. Fujimura, Kyoto University Kyoto University, Japan K. Imai, M. Niiyama Research.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Taku Gunji Center for Nuclear Study The University of Tokyo
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
P. Colas - Status of the cosmic run 1 Tsukuba, January 16, 2006 STATUS OF THE DATA TAKING JANUARY 2006 COSMIC RUN.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
TPC/HBD R&D at BNL Craig Woody BNL Mini Workshop on PHENIX Upgrade Plans August 6, 2002.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Precision Drift Chambers for the ATLAS Muon Spectrometer
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
T. Zerguerras- RD51 WG Meeting- CERN - February Single-electron response and energy resolution of a Micromegas detector T. Zerguerras *, B.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Laser Calibration of a Liquid Argon TPC G. Sinnis J. Danielson W. Sondheim.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
The NA61 TPCs (1) Overview: Mechanics readout Position resolution
FEE for TPC MPD__NICA JINR
Marian Ivanov TPC status report.
Laser calibration systems
Commissioning of the ALICE HLT, TPC and PHOS systems
Gaseous Beam Position Detectors, with Low Cost and Low Material Budget
Toward the final design of a TPC for the ILD detector
MWPC prototyping and testing of STAR inner TPC upgrade
The MICROMEGAS detector in CAST
Technische Universität München
TPC Detector Control System
Presentation transcript:

February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS

February 12 th, 2004 Heidelberg TPC Meeting J.B. MOTIVATION 1 CALIBRATION OF TPC (IROC MODULE) -- DEFINED BEAM ENERGY --- electronics gain (x) chamber gain --- dE/dX studies TRACKING WITH EXTERNAL REFERENCE DEFINED PARTICLE ANGLE

February 12 th, 2004 Heidelberg TPC Meeting J.B. MOTIVATION 2 FULL OPERATION OF COMPLETE INNER SECTOR -- ALL FE CARDS (final cards) -- RCU CARD (full functionality) -- ISEG (HV) -- WIENER (LV) -- FINAL GATING GRID PULSER

February 12 th, 2004 Heidelberg TPC Meeting J.B. REQUIREMENTS (BEAM/PARTICLES/GEOMETRY) BEAM ENERGY VARIATION BEAM INTENSITY VARIATION PARTICLE SEPARATION TRACK ANGLE VARIATON EXTERNAL TRACKING TRIGGER

February 12 th, 2004 Heidelberg TPC Meeting J.B. REQUIREMENTS (ELECTRONICS/RCU) ALL FE ELECTRONIC CHANNELS 43 FE Cards RCU CARD -> 2 RCU cards with full functionality TRIGGER LOGIC -> NIM TO LVCMOS

February 12 th, 2004 Heidelberg TPC Meeting J.B. REQUIREMENTS (DAQ/DDL) VISUALIZATION -> ONLINE MONITOR COMBINATION OF THE MICROSTRIP-T AND TPC-DAQ -> EVENT BY EVENT MATCHING : TPC MICROSTRIP DDL -> 2 DDL + DATE -> Download -- MAX DATA FLOW/EVENT (WITHOUT 0-SUP.) 3.1 Mbyte/event -> (1.9 Mbyte/event / 1.2 Mbyte/event) max speed : 200 Mbytes/sec  100 events/sec CONNECTION TO CASTOR

February 12 th, 2004 Heidelberg TPC Meeting J.B. REQUIREMENTS (DATA BASE/STORAGE) 136 RUNS # 40 ANODE VOLTAGE – DRIFT # 48 (r-phi/z) - Drift # 48 BEAM ENERGY – DRIFT  5000 EVENTS PER RUN  680 k EVENTS TOTAL  ~ 2 Tbyte

February 12 th, 2004 Heidelberg TPC Meeting J.B. REQUIREMENTS (DCS) DCS (NOT WITH ECS) -- OPERATION OF ISEG/WIENER -- VOLTAGE/CURRENT/ /TEMP/PRESSURE MONITORING AND ARCHIVING

February 12 th, 2004 Heidelberg TPC Meeting J.B. REQUIREMENTS (READOUT/FIELD CAGE/GAS) WORKING READOUT CHAMBER AT NOMINAL VOLTAGE (Ne/CO2/N2) (85.7/9.5/4.8) DRIFT FIELD OF 400 V/cm OXYGEN < 10 ppm STABLE GAS MIX (NE/CO2/N2) (85.7/9.5/4.8) TEMP / PRESSURE

February 12 th, 2004 Heidelberg TPC Meeting J.B. REQUIREMENTS (T10 BEAM LINE) MECHANIC SUPPORT (phi-angle and z-angle variation) MICROSTRIP TELESCOPE TRIGGER SYSTEM (SCINT.C)

February 12 th, 2004 Heidelberg TPC Meeting J.B. REQUIREMENT (MANPOWER/TEAMS) CHAMBER/FIELD- CAGE/GAS/MICROSTRIP/BEAM /SURV. FE-ELECTRONICS DCS RCU DAQ-DDL SOFTWARE

February 12 th, 2004 Heidelberg TPC Meeting J.B. STATUS (READOUT/FIELD CAGE/ GAS SYSTEM) READOUT -- operational FIELD CAGE -- He-Leak detection  leak drift/CO2 volume -- Field optimization  in progress (40 k events) GAS SYSTEM -- He Leak detection  improvement -- pump circuit changed  permanent circulation -- pump service kit ordered /spare pump

February 12 th, 2004 Heidelberg TPC Meeting J.B. STATUS (FE ELCTRONIC) FE ELECTRONIC CARDS --- complete COOLING PLATES arrived at CERN (43 needed) COOLING SYSTEM --- manifold under work CAPTON CABLE available / 200 ordered CONNECTION TO RCU --- TO BE TESTED

February 12 th, 2004 Heidelberg TPC Meeting J.B. STATUS (T10 BEAM AREA) WORK STARTS BY FEBRUARY 17 th NOT CLEAR WHICH SUPPORT TABLE WILL BE USED

February 12 th, 2004 Heidelberg TPC Meeting J.B. STATUS RCU AT PRESENT WE TAKE DATA WITH “OLD” RCU CARD AND 8 FE CARDS THE FINAL RCU WAS NOT YET TESTED !

February 12 th, 2004 Heidelberg TPC Meeting J.B. SCHEDULE (BEAM AREA/ BEAM TIME) BEAM AREA WILL BE CLOSED BY MAY 3 rd FROM MAY 3 rd – MAY 18 th (no M- STRIP TELESCOPE) FROM MAY 19 th – JUNE 2 nd (M-STRIP TELESCOPE AVAILABLE)

February 12 th, 2004 Heidelberg TPC Meeting J.B. SCHEDULE AND DEADLINES (RCU/DDL/TRIGGER) ARRIVAL OF FINAL(*) RCU CARD AT CERN BY MARCH 15 th (2004) STABLE OPERATION OF COMPLETE SYSTEM AT T10 BY APRIL 15 th (2004)

February 12 th, 2004 Heidelberg TPC Meeting J.B. SCHEDULE (installation) Installation of FE electronics Installation of TPC / FIELD CAGE IN T10

February 12 th, 2004 Heidelberg TPC Meeting J.B. CONCLUSIONS (1) WE ACCUMULATED SO FAR WITH 8 FE CARDS 40k EVENTS -- HIGH MULITPLICITY, SINGLE TRACKS (Summary by Marek and Marian)  BEAM TEST IS UNIQUE CHANCE TO COMPLETE THE TEST PROGRAM

February 12 th, 2004 Heidelberg TPC Meeting J.B. CONCLUSIONS (2) ONLY THE COMBINATION OF ALL FE CARDS WITH THE FINAL RCU (ALL FUNCTIONALITY) WILL ALLOW US : -- TO PERFORM THE COMPLETE CALIBRATION PROGRAM -- TO TEST THE FUNCTIONALITY UNDER “REALISTIC CONDITIONS”

February 12 th, 2004 Heidelberg TPC Meeting J.B. CONCLUSIONS (3) (risk/performance) THE FIELD CAGE AND GAS SYSTEM ARE OLD ! (RISK OF DAMAGE DURING TRANSPORT) THE MATERIAL BUDGET OF THE FIELD CAGE IS NOT AS IN THE FINAL ALICE EXPERIMENT !

February 12 th, 2004 Heidelberg TPC Meeting J.B. CONCLUSIONS (4) (MOUNTING OF FE CARDS) FINAL MOUNTING OF FE CARDS CAN NOT BE TESTED DUE TO DIFFERENT SUPPORT STRUCTURE

February 12 th, 2004 Heidelberg TPC Meeting J.B. SUMMARY PARAMETER BEAM ENERGY (0.5,..,7 GeV/c) BEAM STRUCTURE PARTICLE COMPOSITION (p,pi+/pi-,e) RESOLUTION OF SILICON (~ 3 um) INTERACTION MATERIAL (5mm Al)