TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.

Slides:



Advertisements
Similar presentations
Kinetics.
Advertisements

Electrical and thermal testing at Glasgow and Liverpool.
AMS Software Review ACC Slow Control Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
Examples for Simple Science Research
PPS telescope – main idea Have 10 layers of PPS in one test-bench The entire construction is between scintillators (top and bottom) for external trigger.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Colorado Space Grant Consortium HOBO Computer Class #05 HOBO Computer Class #05.
Status on the VELO sensors in the vacuum chamber Gwen & Ray 08/14/2007.
UM PPS Lab Activities PPS meeting October 9 and 16, 2012.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
UM PPS Lab Activities - HV Readout Long Run - Single Source Saturation Test PPS meeting April 30, 2012.
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
TAU - status December 14. Lab setup 9/7/2011TAU - status report2 Each RO line is X100 Attenuated and 100Ω terminated 10 μm position precision of collimated.
Yiftah Silver Tel Aviv University September 27 th 2012.
Plasma Panel Sensor – Tel-Aviv September
Gas Alarm System 4th Floor, Kjemi V If Gas Alarm, What to do? 1.There is 1 min delay before signal goes to the fire brigades (if high alarm) 2.Hurry to.
1 Computer Power Supply Amateur Radio Conversion For Cheap +12 vdc Power March 17, 2003.
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Phase Changes Vaporization- The process of changing from a liquid to a gas. Endothermic- lower energy liquid goes to a higher energy gas. When this occurs.
At ppt Air Pressure CH 15 Prentice Hall p
Advanced Research Systems, Inc.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Long Run Test on Microcavity #2 PPS meeting 01/06/ The UoM guys SETUP 90 Sr (4.7 mCi in 1993) Source at ~3 inches over the panel over the pixel in.
TAKS STUDY GUIDE SOLUTIONS IPC 9D Does a chemical reaction take place when one substance dissolves in another? No, dissolving is a physical change because.
Gas Pressure L/O :- To understand what causes gas pressure.
Brought to you by powerpointpros.com Reading a Thermometer.
IEEE 2011 NSS-MIC Valencia Yiftah Silver October 26 th 2011.
My Pals are Here! Science © 2008 Marshall Cavendish (Singapore) Private Limited.
Yiftah Silver Tel Aviv University September 27 th 2012.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
Status of NA62 straw electronics Webs Covers Services Readout.
KEN, JERI FU JEN CATHOLIC UNIVERSITY 2008/DEC./11 1 Testing Status of P.P. & APD.
Temperature Sensing Temperature Bar Graph Project National Electronics Museum November 12, 2011 National Electronics Museum.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
Proton Test Beam Experimental Program Overall objective: Study response of modified monochrome DC Plasma Display Panels to low energy proton beam. Energy.
1 Performance of a CCD tracker at room temperature T. Tsukamoto (Saga Univ.) T. Kuniya, H. Watanabe (Saga Univ.); A. Miyamoto, Y. Sugimoto (KEK); S. Takahashi,
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
DSS-GUI T.Habermann. overview log in tank(s) autofill schedule info admin section (preferences) operator section (control) user section (monitoring) „quick.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
It all started simple…. One Alternator One Battery One Starter Motor.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
FIGURE 20–1 A typical engine coolant temperature (ECT) sensor
FCU Controller M/FCU
Hybrid MPGD based photon detector, R&D update.
Thermocouples and rtd Prepared By: Ansari Najma A. ( )
Setup for Cosmic Ray Test of VPA panel, using MiniDAQ
Vertical Beam Halo Study using Diamond Sensor. June 2015 ATF2
BESIII RPC Detector Jiawen Zhang
Comparator Circuits AIM:
Figure A typical engine coolant temperature (ECT) sensor
LVDT You’re expected to learn
MEG II実験 液体キセノン検出器の建設状況
55. Graphing Exponential Functions
Presentation transcript:

TAU status 14/2/2012

Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00 02:00 CH 7 Panel setup: Ni-Ni panel CF4 600Torr 6High Voltage lines 10 Read-Out lines, with attenuators V # hits/ 30 mins Sec PDP hits /channel

Temperature behavior Panel setup: Ni-SnO 2 panel MDT gas: Ar-Co 2 600Torr 6High Voltage lines 10 Read-Out lines, with attenuators. 980 V Source with collimator above RO lines 2,3,4 Some problematic channels, not electronics issue. Could be due to bad connections in the RO card ? However, these are less relevant to the measurement PDP hits /channel

Temperature behavior 13:00 reach stable temp The drop in rate starts at ~13:00. (black line ) Each red line is 24 hours. Start at 10:30 am No response to changes in temperature after the first increase in temperature. CH2 Usual behavior # hits/ 30 mins Sec PDP hits /channel hours Temp 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C

Temperature Control Problem with Temperature control. Two A/C. The left rise A/C #1 – located in the other side of the room relative to the temp sensor - but stopped working. The right drop A/C #2 - close to the Temperature sensor – not a reliable measurement. More “scientific “ method is needed to control the temperature. In order to perform more accurate measurements. In any case strange behavior of the detector. Rate declines with time. 12/2/12 Mid-day 9/2/12 12/2/12 Mid-day

The hypothesis Paschen's curve Temp decrease, so does the pressure. Breaking Voltage is lowered, so with the same HV and lower temperature we expect to have higher rate.

Test Beam preparations Online monitoring Server-client output. Multi-threaded readout: – for plotting histograms quickly. – receive PDP output. Individual CH selection A few simple drawing options