Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.

Slides:



Advertisements
Similar presentations
SPL Intercavity support Conceptual design review 04/11/ A. Vande Craen TE/MSC-CMI.
Advertisements

Deviations from fiducial locations are unacceptable in areas despite high accuracy at alignment points.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
IWAA R. BEUNARD – September 13-17, 2010 – DESY, Hamburg, Germany 1  20m Rémy Beunard A. Lefevre, F. Legruel GANIL, CAEN, FRANCE The 11th INTERNATIONAL.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
LASER AND ADVANCES IN METROLOGY
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Calibration and production of PRAXIAL (*) sensors for the ATLAS muon spectrometer Optical Metrology - SPIE Optical Measurement Systems for Industrial Inspection.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Presentation 7/05/2015 Giordana Severino ESR2.2, WP2 CERN Supervisors Marco Buzio Academic supervisor Prof. Pasquale Arpaia.
The integration of 420 m detectors into the LHC
ICARUS Collaboration Meeting Dec A. Scaramelli.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
1 Research on laser tracker measurement accuracy and data processing Liang Jing IHEP,CHINA
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Status Report of the Realignment for J-PARC 3GeV RCS N. Tani, H. Hotchi, M. Yamamoto, J. Kamiya, K. Horino, M. Kinsho J-PARC Center, JAEA 1 Outline 1.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
AUSTRALIAN NATIONAL UNIVERSITY NUCLEAR PHYSICS DEPARTMENT RECENT ALIGNMENT EFFORTS ALIGNMENT EFFORTS AT THE HEAVY ION ACCELERATOR FACILITY ACCELERATOR.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
D. Missiaen – 13/06/2014. D. Missiaen 13/06/ Agenda Introduction to alignment techniques Reserved space for Survey The CERN Co-ordinates System.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
The Alignment of DTL in CSNS Institute of High Energy Physics, CAS KE Zhiyong
ALIGNMENT OF THE NEW TRIPLETS
SPL RF coupler: integration aspects
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Workshop on Tau-Charm at High Luminosity
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Towards a common mechanical interface
The Storage Ring Control Network of NSLS-II
FAIR magnets fiducialisation WP 7.5
HIE-LINAC status report
IMP Cryomodule Assembly and Alignment
Alignment of Main Linac Cryomodule (MLC)
Cryomodule Assembly Plan
Progress and plans, Mechanics system of CEPC
Simplified Procedure Draft
Presentation transcript:

tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices. To determine the best technique for aligning any equipment, it is essential to know the precision required for the six degrees of freedom, and to understand the reasons for the requested precision. An object is “located” by its fiducial marks. High quality of mechanical connection to these marks is important in the final precision of the location of the object. Survey and Alignment Concept for Construction of SPIRAL2 Accelerator Tacheometer TDA D measuring portable arm Level NA3003 Digital CCD System connected to the Alignment Telescope Journées Accélérateurs de la SFP Roscoff, octobre Surveying instruments Final survey The solution adopted to support the linac components, is a welded-frame structure equipped with guide rails. One advantage of this solution is the possibility of bringing a component into a laboratory together with its support in order to do, for example, a realignment of the cavities inside the cryostat then to put it back on the beam line under the same conditions, using the guide rails. 4. The Superconducting Linac R. Beunard, A. Lefevre, F. Legruel, GANIL, B.P CAEN, CEDEX 5, France Alignment/Instrumentation Group/Physics Technical Department Thanks to all members of the GANIL design offices, as well as the colleagues from the other laboratories involved in this project, particularly from IPN Orsay and the DAPNIA Saclay 3. The injector beamlines Magnets Fiducialization As opposed to surveying with a theodolite, the use of a laser tracker will thus avoid dismounting certain equipment such as vacuum pumps or beam diagnostic devices during the shutdown period to permit alignment. Dipole The tolerated maximum static errors for the global alignment of the quadrupole and dipole magnets are: displacement (mm): ± 0.1 rotations (X,Y) (deg): ± Q r  Q r =d/L with d the displacement and L the length of the element rotations (Z) (deg): ± Q z  Q z =d/R with d the displacement and R the radius of the element The tolerated maximum static error for the global alignment of the diagnostic devices is: ± 0.2 mm The tolerated maximum static errors for the global alignment of the quadrupole and dipole magnets are: displacement (mm): ± 0.1 rotations (X,Y) (deg): ± Q r  Q r =d/L with d the displacement and L the length of the element rotations (Z) (deg): ± Q z  Q z =d/R with d the displacement and R the radius of the element The tolerated maximum static error for the global alignment of the diagnostic devices is: ± 0.2 mm Diagnostic boxes Fiducialization Laser Tracker 35 m Cryomodule A  = 0.06 Cryomodule B  = 0.12 Tacheometer T3000A Reflector coded invar rod 2. The RFQ RFQ Fiducialization The localization of the RFQ requires fiducial points transferred on the top of the vacuum vessel by adjustable plates equipped with a conical centering-surface for a Taylor- Hobson-Sphere. These spheres are the only reference points which will be accessible. Their spatial coordinates will be given in the reference system of the object. Network measurement for metrological control of the vanes and the fiducial points The network measurement will be made with a laser tracker. The reference network will consist of approximately 6 pillars (green), 6 floor monuments (blue) and 4 laser tracker stations. Two sets of angles and 8 interferometer distances will be observed from each tracker station to all points. Estimated global error: 60  m (RMS at 2  ). The fiducials are the points located on the magnet with respect to the theoretical beam trajectory. Each beam line magnet will be fiducialized with a reference socket cup (CERN - type) installed on the plate during the process of alignment. fiducial tilt The tolerated maximum static errors for the global alignment are: ± 0.1 mm for the displacement of the quadrupoles ± 0.03 deg for the rotations (X,Y) of the quadrupoles ± 0.1 deg for the rotations (Z) of the quadrupoles ± 1.0 mm for the displacement of the cavities ± 0.3 deg for the rotations (X,Y) of the cavities. The tolerated maximum static errors for the global alignment are: ± 0.1 mm for the displacement of the quadrupoles ± 0.03 deg for the rotations (X,Y) of the quadrupoles ± 0.1 deg for the rotations (Z) of the quadrupoles ± 1.0 mm for the displacement of the cavities ± 0.3 deg for the rotations (X,Y) of the cavities. Cryomodule B: Transfer methodology of the cavities beam axis During assembly process, once the cryomodule is closed, the interior of the superconducting cavities cannot be accessed outside a clean room. As a result, the cavities are equipped with optical targets “Taylor and Hobson” mounted on an arm in order to facilitate its adjustment inside the cryostat. The optical targets fixed on the helium tank are adjusted to be parallel to the cavity axis. The transfer was carried out by means of inter-dependent tools in the two beam tubes. The axis defined by the two beam tubes and the nut drift tube is also measured in order to define an average axis between the three cylinders. The adjustment was performed with an error on the reported axis position of the order of 0.1 mm. Cryomodule A: Transfer methodology of the cavities beam axis Once the cryomodule is closed, it is no longer possible to change the cavity position with respect to the vacuum tank. External references of the cavity position will allow the alignment of one cryomodule cavity with respect to the other ones. Previous measurements of the cavity beam axis displacement during cool-down will be necessary to check the calculation. This will be made using a bare cavity. Qualifying cryomodule B: Measurement of the cavities displacements during vacuum tests and cooling down The measurement campaign was conducted in two stages because stability to 4K is obtained only after 2 to 3 days. The first campaign concerns the impact due to the vacuum and the second due to the cooling down. The technical principles include an optical method by using a Taylor and Hobson telescope. The displacements were measured on the optical targets inserted into the arms outside cavities. fiducial Alignment concept component fiducialization As the components cannot be aligned through the beam tube, the solution adopted is to transfer new axes outside the object, i.e. to the sides of their supports by adjustable target boxes (fiducials). The three-dimensional coordinate measurements of these fiducials would be given in the reference system of the accelerating tubes of the cavities and the mechanical axis of the poles for the magnets. The measurements will be done by means of a portable-arm coordinate-measuring machine. The measuring accuracy given by this system is ± 0.06 mm (at 2  ). Transfer beam axis Beam axis Transfer beam axis 0.5m alignment target Survey reflector Tilt-meter plate Wall monument Floor monument 1 m Fiducial nest QWR (beta =0.07) 1 cavity QWR (beta =0.12) 2 cavities View of cryomodule installed on the bench for measuring Location of the measured points reflector Bench for component fiducialization