IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly.

Slides:



Advertisements
Similar presentations
Design of Eco House Maldives Training Program for Architects on eco-design 08/08/05 – 13/08/05 Bangkok, Thailand Hussain Naeem Mohamed Ali Ismail Rasheedh.
Advertisements

Sec-84, Gurgaon. An integrated Mixed Used Development Project Office, Retail & Residences.
Existing Maximum Capacity = 240 (approx.) Comfortable Seating = 170 (approx. 70%) Current Sunday Attendance = 160 (approx.) During Awana Night, Every.
ACACIA COUNTRY & GOLF CLUB REVISED MASTER PLAN GATE HOUSE ACACIA COUNTRY & GOLF CLUB.
Eastchester Union Free School District Pre-Bond Planning Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools.
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
2008 Goal New Goloka Dhama Dimmocks Mill Road, Hillsborough, NC, To build a nice temple facilities for Sri Sri Radha Golokananda Ji in Hillsborough,
Pulivendula 1.  construction area of 1.32 Lakhs Sq.ft comprising Laboratory Animal House, Community center, Shopping Complex, Primary School, Auditorium,
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
ECCC Growth Strategy. Average Sunday Attendance ,006 1,120.
Presenting an exquisite boutique town home community, designed with the finest of craft to mirror the person you are… A personality pronounced in every.
Church Renovation/ Expansion Proposals Willowdale.
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
UN Capital Master Plan Renovation Strategy IV Version 9 August 2006 schedule (condensed)
WELCOME TO NEIL Plot no: 117, Road No
MEDICAL SEMI-TEMPORARY STRUCTURES Examples of medical semi- temporary structures in MSF programs By Jérôme Michon and Yannick Garbusinski and Hugues Robert.
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Appropriate: Set apart for a particular use; suitable. Dedicated: To devote wholly or chiefly.
PERFORMANCE & CODE ANALYSIS TIMBer Inc. ·Brooke Fedder · Marie Rottschaeffer· Izzie Molinuevo· Tena Pettit·
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
PROPOSED RESIDENTIAL SCHOOL FOR
________________________________________________________________________________________________________________________________________________________.
Liberty Elementary: Preparing for the Future Building New Pre Construction Meeting.
Frontal View of the Apartment – Flat is on the 3 rd floor contact FORSALEFORSALE.
Energy Conservation Project UNIT 7 STANDARDS: NCES 2.2.2,
BRANDON BAPTIST CHURCH MASTER PLAN 8/31/2015 BRANDON BAPTIST MASTER PLAN BRANDON BAPTIST CHURCH MASTER PLAN 1.
Master Plan Update February 4, 2015 Georgetown University Hoya Roundtable Student Engagement.
Major projects carried out by Design cell ( July 2015 ) 12/22/20151Design cell IIT,Bombay Aug 2015.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
A house to Jesús Soto Venezuela, Well known Venezuelan artist who works in Kinetic Art style. Energy is one of the elements most eye-catching.
Family Life Center / Youth Center 201 Music Office 216 – 217 Children’s Classroom 202 – 203 future use 218 Kid’s Klub 204 old sanctuary 219 – 220 Storage.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
A sustainable house By Ashleigh Towler. Down stairs garage Living room Bedroom 1 Laundry Kitchen/ dining room Bath entry.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
Work Progress Photos From 15 TH To 30 TH NOV 2015.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Shakopee Convention Center A study of sustainable design and technology.
Long List Workshop – Option 1 Clinical Theme & Benefit Hot/Cold split in completed build Trauma/Neurosciences provided as first stage Demolish Barry Building.
Hayesbrook Community Pavilion. Aims St Stephen’s Church offers a variety of activities open to the whole community including Youth Clubs (Young & Old.
OVER VIEW. FACILITIES Block 1 : Academic and Admin Block 2 : Academic Masjid Digitalized Multi lingual library Research Centre Audio Visual theatre Live.
SOBHA GREEN ACRES PRE LAUNCH OFFERS Bookings are Open Now. Hurry!! Call
Fundamentals of Construction
A very impressive villa in Dabouq, a prestigious neighborhood of Amman completed in The villa is set on five levels and comes fully furnished.
A HOUSE.
“kicking on to the finish”
Our Journey so Far. Our Journey so Far Christ Apostolic Church, House of Praise was founded in 1982 The church started holding its services in one.
Diocese of Northampton Scott Tallon Walker Architects
Site Based Preconstruction – Site Set Up
uacn property development company plc
SABANCI PERFORMING ARTS CENTER
HAVEN OF HOPE VISION CLARKSVILLE PROPERTY.
Facilities Report to the Buffalo State College Senate May 6, 2016
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Vice President, Facilities & Capital Projects
1 Semester Project Design A Multi Story Office Building
Office Chambers. Office Chambers Classrooms FEATURES Air conditioned. Plasma TV. Capacity of 40 students each. Computers.
Programming.
2007 Bond Issue Capital Improvement Program
HAVEN OF HOPE VISION CLARKSVILLE PROPERTY.
PHASE I NEW SANCTUARY BUILDING COMPLETE WORSHIP SPACE FOR 350
Fundamentals of Construction Gateway – Unit 7 – Green Architecture
Integration with THE COMMUNITY. Integration with THE COMMUNITY.
Pension and Health Insurance
Expansion Project Saturday, February 9, 2019
Multi-Family Fourplex Apartment
Where do you go from here?
Lego Transformation Step 1 –
Presentation transcript:

IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly area and Class Rooms 2. Church Office and Meeting rooms 3. Parsonage for Pastors 4. Multipurpose Hall The Building project has been taken up in 2 phases Phase 1 – Main Building – Ground + 3 floors ( 4000 Sft/ floor) – Total 16,000 sft Phase 2 - Toilet Block / Stores etc

JULY 2011 THE IDEA OF A NEW MULTI PURPOSE BUILDING BUILDING PLAN APPROVALMAY 2012 FINAL DESIGN NOV 2012

GROUND BREAKING CEREMONY BY Bishop Dr.Taranath S Sagar On 3 rd March 2013

AN ARTIST’S IMPRESSION OF THE BUILDING

EXISTING CHURCH SILVER JUBILEE BLOCK Phase-1 T O I L E T B L O C K Ph2 TEMP SUNDAY SCHOOL BLOCK TEMP CHURCH OFFICE TEMP TOILET BLOCK EXISTINGLAWNEXISTINGLAWN PLAN OF THE NEW BUILDING – Phase 1 & Phase 2

GROUND FLOOR PLAN DRIVE WAY TOILET(G)TOILET(L)STORESPANTRY MEDICAL/ NURSING TRANSFORMER SECURITY PORTICO Ground Floor will consist of CAR PARKING, TOILETS, etc.

FIRST FLOOR PLAN MULTI PURPOSE HALL SUNDAY CLASS STORES BALCONY SUNDAY CLASS STAGE GREEN ROOM HALL CAPACITY ( appx), Will be used by SS, Church services ( Virtual Church), VBS programs, retreats, seminars, functions etc.

SECOND FLOOR PLAN BALCONY OPEN TERRACE CONFERENCE TOILETS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS SUNDAY CLASS/ BREAK OUT SUNDAY CLASS/ BREAK OUT ASSO PASTOR SENIOR PASTOR JR. PASTOR VISITORS OFFICE Sunday School Block, Church offices, Meeting/ Conference rooms etc.

THIRD FLOOR PLAN BALCONY OPEN SPACE KITCHEN DINING BED ROOM LIVING SENIOR PASTOR’s HOUSE ASSO. PASTOR’s HOUSE LIVING DINING KITCHEN BED ROOM Parsonage – Senior Pastor / Asst. Pastor

TERRACE FLOOR PLAN Open terrace – Planned a temporary roof at a later stage and can be used for functions etc. Capacity – 400 ( appx)

SALIENT FEATURES PRE S * Multipurpose Hall will be used by Sunday School for Opening session, VBS etc. * Hall will also be used during Church service as a Virtual Church, and for retreats, seminars, functions etc. * Sunday School Block with 12 classrooms equipped with the latest audio/visual eqpt * State of art conference room * Green building – Maximum use of Natural light, Solar energy and rain water harvesting

COST OF CONSTRUCTION TOTAL COST Phase I (Main Building- Total area – 16,000 sft) 340 lakhs (appx'ly) 60 lakhs (appx'ly) Phase 2 (Toilet/ Stores) 4 Crore ( appx'ly)

ACTUAL WORK STARTED NOV '13 COMPLETION TIME ( Phase I- Main Building ) 15 Months (Jan' 2015 ) PRE SPRESENT POSITION Phase 1 FOUNDATION COMPLETED AS ON FIRST WEEK OF FEB'14