SAT3/WASC/SAFE – Public / Private Global Partnership

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Providing the right Backbone Infrastructure for Broadband Folu Aderibigbe, Head Glo1.
Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 Confidential and proprietary material for authorized Verizon Foundation personnel only. Use, disclosure or distribution of this material is not permitted.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
International Telecommunication Union Committed to connecting the world 1 Global Trends and Future Growth Malcolm Johnson Director Telecommunication Standardization.
Overview of ICT Infrastructure in Africa Region and ITU-NEPAD Preliminary Assistance ITU Public & Private Sectors Partnership Forum for Africa Region.
International Telecommunication Union HIPSSA Project Support for Harmonization of the ICT Policies in Sub-Sahara Africa The assessment of international.
THE COMTEL PROJECT COMESA SECRETARIAT 2 COMESA Membership Member States of COMESA are: Angola Burundi Comoros Congo, DR Djibouti Egypt Eritrea Ethiopia.
International Telecommunication Union HIPSSA Project Support for Harmonization of the ICT Policies in Sub-Sahara Africa An overview of the international.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
ZMQS ZMQS
Micro Focus Research 1 As far as youre aware, how does your organization plan to drive business growth over the next three years? (Respondents' first choices)
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
1 of Audience Survey Results Larry D. Gustke, Ph.D. – October 5, 2013.
ABC Technology Project
SEMINAR ON SUB-MARINE CABLE PROJECT IN BANGLADESH Presented By: Engr.M.Monwar Hossain (G.M, BTTB) Chief Guest:Prof.Dr.M.Anwarul Azim (Vice-Chancellor,DUET,Gazipur.)
2 |SharePoint Saturday New York City
© S Haughton more than 3?
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 First EMRAS II Technical Meeting IAEA Headquarters, Vienna, 19–23 January 2009.
Addition 1’s to 20.
25 seconds left…...
Test B, 100 Subtraction Facts
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
How Cells Obtain Energy from Food
McGraw-Hill©The McGraw-Hill Companies, Inc., 2001 Chapter 16 Integrated Services Digital Network (ISDN)
Traktor- og motorlære Kapitel 1 1 Kopiering forbudt.
Internet Access and Digital Divide-Nigeria Victor CHUKWUMA, Department of Physics, Olabisi Onabanjo University, PO Box 351, Ago- Iwoye Ogun State, NIGERIA.
Broadband Connectivity (for) Africa
Connecting Africa to leverage ICT for Economic Development
Presentation transcript:

SAT3/WASC/SAFE – Public / Private Global Partnership ICT SUMMIT - JHB - Jun04 SAT3/WASC/SAFE – Public / Private Global Partnership TELKOM SA LTD

SAT-3/WASC/SAFE – what is it? ICT SUMMIT - JHB - Jun04 SAT-3/WASC/SAFE – what is it? 27,850 km submarine cable system The name: 3rd South Atlantic Telephone cable – SAT3 West Africa Submarine Cable - WASC South Africa – Far East - SAFE Acronym: SAT3/WASC/SAFE Commercial service since April 2002 Design capacity – 120Gb/s (6m tel. calls) TELKOM SA LTD

SAT-3/WASC/SAFE 1. Portugal 2. Spain 3. Senegal 4. Cote d’Ivoire ICT SUMMIT - JHB - Jun04 SAT-3/WASC/SAFE 1 1 2 1. Portugal 2. Spain 3. Senegal 2 3 15 6 4 5 7 16 8 4. Cote d’Ivoire 5. Ghana 6. Benin 7. Nigeria 8. Cameroon 9. Gabon 10. Angola 11. South Africa (1) 9 10 12. South Africa (2) 13. Reunion 14. Mauritius 15. India 16. Malaysia 14 13 11 12 TELKOM SA LTD

SAT-3/WASC/SAFE – the partnership ICT SUMMIT - JHB - Jun04 SAT-3/WASC/SAFE – the partnership The consortium co-owners: Africa: 12 investors (46%) America: 4 investors (14%) Asia: 8 investors (17%) Europe: 12 investors (23%) Construction & Maintenance Agreement Shareholders agreement depicting rights and liabilities Cable system construction, maintenance and operation SAT-3/WASC/SAFE serves as a shining example in demonstrating the ability of African and Global telecommunications companies to work together in harmony towards realizing an important building block in pursuit of the development and improvement of African infrastructure TELKOM SA LTD

THE PARTNERSHIP APPROACH ICT SUMMIT - JHB - Jun04 LEVERAGING GLOBAL ECONOMIES EUROPE SEA-ME-WE-3 (Phase 1) – RFS 1999 ASIA SAT-3/WASC (Phase 2) – RFS 2002 SAFE TELKOM SA LTD

Telkom View on AFRICAN Partnerships The RIGHT Partnership – A completed AFRICAN FIBRE RING SEA-ME-WE-2 SEA-ME-WE-3 PHASE 1 SAT-3/WASC/SAFE PHASE 2 EAST AFRICA PHASE 3

GLOBAL VIEW EASSy SAFE SAT-3/WASC SEA ME WE 3 1 2 3 4 16 23 7 8 5 6 17 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 SEA ME WE 3 SAFE SAT-3/WASC EASSy GLOBAL VIEW

CABLE ADVANTAGES FOR AFRICA ICT SUMMIT - JHB - Jun04 CABLE ADVANTAGES FOR AFRICA Ownership of the infrastructure Improves business applications and internet speed (less latency) Increases the available bandwidth for specific country / region Ability to access numerous regional / neighbouring countries Ability to access >150 countries globally Reduce the region’s dependency on satellite Lower network costs at higher bandwidth Cost reductions can be used to address domestic needs Facilitates cooperation – i.e. shared backhaul / cable stations TELKOM SA LTD

Consider existing gaps Position as a global system Co-operate ICT SUMMIT - JHB - Jun04 MACRO LESSONS Consider existing gaps Position as a global system Co-operate Expect to pay for it Operator involvement Flexibility Avoid oversupply or nice to have TELKOM SA LTD

Gain momentum with serious Parties ICT SUMMIT - JHB - Jun04 MACRO LESSONS (2) Gain momentum with serious Parties Establish a robust / redundant network Own / control strategic infrastructure Active participation Expect to work Make financial arrangements early If its commercially viable – do it – if not … TELKOM SA LTD

GLOBAL CAPACITY BUSINESS ICT SUMMIT - JHB - Jun04 THANK YOU JOHAN MEYER EXECUTIVE GLOBAL CAPACITY BUSINESS TELKOM SOUTH AFRICA TELKOM SA LTD