THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley.

Slides:



Advertisements
Similar presentations
Ray Lundquist, NASA GSFC
Advertisements

Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
MET ONE 7000 Series Remote Airborne Particle Counters Customer Name Date Presenter Presenter Title.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
Scisat Test Readiness Review Ground Support Equipment Status University of Toronto 29 January 2003.
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
THEMIS F2/F3 IPSR and F4/F5 IPER 1 By Telecon, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW Thermal.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
MAVEN PER May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Thermal Millan F. Diaz-Aguado Mars Atmosphere and Volatile.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
NPDgamma Liquid Hydrogen Target Safety Review Operating Procedures At LANL November 29-30, 2005.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
Multiple Module Vacuum Oven Productivity Enhancement System.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
Performed at Brookhaven National Lab for Fermilab Main Injector Electron Cloud Studies June 2009 Linda Valerio September 11, 2009.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
This courseware is copyrighted © 2016 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
FIELDS MEP Thermal Vacuum Cycling iPER
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Gayle K. Martin November 14, 2016
IT-4189 Supply and installation of a cryogenic distribution system
1.3-GHz Cavity Vacuum Furnace at IB4
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
(EFW Systems Engineer) University of California, Berkeley
SPP FIELDS V1234 Thermal PSR
THEMIS Mission Assurance
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
Kentucky Space Facilities for satellite development, testing and operation Twyman Clements1, David Jones1 ,Jason Bratcher1, Jessamyn Delgado2, Daniel Erb1,
THEMIS FM4/FM5 INSTRUMENT SUITE
LAT Requirements Verification in TVAC
Jason Link University of Hawaii
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
Presentation transcript:

THEMIS Instrument Suite PERSuite T-V- 1 UCB, May 2, 2005 THEMIS Instrument Suite Thermal Vac Test Rick Sterling University of California, Berkeley

THEMIS Instrument Suite PERSuite T-V- 2 UCB, May 2, 2005 Thermal Vac Test Summary Six cycles Operating cold plateau: -40C Operating hot plateau: +55C Doing P1 Suite alone; subsequent suites in pairs: P2, P3 then P4,P5.

THEMIS Instrument Suite PERSuite T-V- 3 UCB, May 2, 2005 Instrument Suite on Platform

THEMIS Instrument Suite PERSuite T-V- 4 UCB, May 2, 2005 UCB/SSL Room 20 TVAC Tank Vacuum Tank formerly used for Calibration (EUVE, ORFEUS, CHIPS) Thermal System added for THEMIS TVAC

THEMIS Instrument Suite PERSuite T-V- 5 UCB, May 2, 2005 Tank –Inside Class 100,000 Clean Room –8’ Diameter X 15’ Deep –2 THEMIS Instruments Suites Fit Inside Vacuum System –Scroll Pump Rough Pump –Cryo High Vacuum Pump –Pumps Recently Refurbished –Base Pressure: Torr TQCM –Faraday Labs Instrument and Controller Installed – Hz/Hr Baseline (Empty Tank, Thermal system at 60 C) Thermal System –Thermally controlled Baseplate and Box Shroud Liquid Nitrogen Cooling Lines Power Resistor Heating Elements –Computer Control Watlow Anafaze MLS300 Controller 16 Channels Data Capture AnaWin2 Software for thermal profiles –Separate Overtemp Alarm with Shut-Down Control Temperature Range –-130 C to +95 C Status –Tank Ready for THEMIS Suite Testing Room 20 Tank Specifications

THEMIS Instrument Suite PERSuite T-V- 6 UCB, May 2, 2005 B20 CLEAN ROOM READY FOR INSTRUMENT SUITE

THEMIS Instrument Suite PERSuite T-V- 7 UCB, May 2, 2005 Carrier for Themis Instrument Suites

THEMIS Instrument Suite PERSuite T-V- 8 UCB, May 2, 2005 CHAMBER FEEDTHROUGHS

THEMIS Instrument Suite PERSuite T-V- 9 UCB, May 2, 2005 Clean Room Features 100K Class Nitrogen gas purging Continuous oxygen monitoring Temperature and Humidity Monitoring ESD Compliance Certified Crane/hoist Controlled Access Staff Training

THEMIS Instrument Suite PERSuite T-V- 10 UCB, May 2, 2005 F1 Suite TVAC will use F2 AXBs since F1 AXBs need to be delivered to Swales before the F1 Suite TVAC test date.

THEMIS Instrument Suite PERSuite T-V- 11 UCB, May 2, 2005 CPT LPT FGM 1 st Motion T1 T1 = T T2 TT SCM 1 st Motion T2 =

THEMIS Instrument Suite PERSuite T-V- 12 UCB, May 2, 2005 OVERVIEW OF HARNESSING THROUGH TV CHAMBER

THEMIS Instrument Suite PERSuite T-V- 13 UCB, May 2, 2005 GSE FOR INSTRUMENT SUITE T-V Harnesses (power and data) Special harnesses for EFI Boom motor simulators Power supplies NIOS board for interface RS422 to ethernet GSE computer displaying all relevant data and housekeeping

THEMIS Instrument Suite PERSuite T-V- 14 UCB, May 2, 2005 INSTRUMENT AND FACILITY MONITORING ON 24-7 BASIS SUPPLEMENTED BY REMOTE INSTRUMENT MONITORING ASSISTANCE / SUPPORT AVAILABLE AS NEEDED STAFFING

THEMIS Instrument Suite PERSuite T-V- 15 UCB, May 2, 2005 DOCUMENTATION Instrument Suite Thermal Vacuum Procedure Includes: Pre-test checks and verifications Physical setup and suite installation Step by step operations Vacuum requirements Thermal requirements CPT, LPT, special procedures Responsibilities