Office of Science Coupling Coil Status S. Gourlay August 1, 2012.

Slides:



Advertisements
Similar presentations
Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Advertisements

Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Vacuum Vessel Production Readiness Review
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
LARP Collaboration Meeting Racetrack Coil Fabrication
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
MICE/MuCool Coupling Magnets ICST/HIT Progress and Schedule for the MICE/MuCool Coupling Coil Project HIT MICE CC Project Group.
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXC Nb-Ti 120mm 120T/m 2m models
HFM Test Station Main Cryostat
LARP Phase II Secondary Collimator RC1
Spectrometer Solenoid Fabrication Status and Schedule
Far Detector Activities Late 2017 – Early 2018
MICE Coupling Coil Update
Teleconference ACS – FREIA 20th February 2018
Dee1 View from back of back plate
LARP Rotatable Collimators for LHC Phase II Collimation
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Office of Science Coupling Coil Status S. Gourlay August 1, 2012

Office of Science Coupling Coil Test Prep Cooling tube welding –Pressure test Horizontal and vertical milling operations –Lead, Quench Protection mounts Coil vacuum epoxy impregnation –Gap between cover plate and coil –Seal gap (no leaks!) Design/fab holding fixture for potting Manufacture QP and lead support parts Install temp sensors, strain gauges

Office of Science Coupling Coil Status/Activities Pressure test complete –Documentation in progress QP hardware installed Thermal test with fixture complete Should start potting today –Out by tomorrow Install strain gauges (six) in strategic areas Assemble lead stabilizers Shipping crate will arrive this week