Sector 1 Instrument Relocation for LEReC Systems in the LEReC Region (39m - 64m) to be Relocated 7 separate assembliesNew LocationChampionsApproved ARTUS.

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
Minutes from Sector 1 Relocation Meeting, May 22 nd 9:15 LCR D. Gassner K Mernick suggest moving the BBQ kicker and triple purpose pick-up assemblies to.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Low Energy RHIC e - Cooling Meeting Notes 1 –LF Solenoids & HF (Matching) Solenoids: Out for bid??? –20 o Dipole  Magnet gap is 4 inches/transport lines.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Low Energy RHIC e - Cooling LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity 704 MHz SRF gun converted to booster cavity 5-cell 704 MHz.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
January 4, 2007 RHIC II Project Internal Cost Review Gary McIntyre RHIC Ring Modifications January 4, 2007 Project Overview.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
APEX Report March 3, 2010 Fulvia Pilat Time Meeting, March 9, 2010.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.J. Tuozzolo will schedule a visit to NSLS next week to evaluate available magnets, power supplies,
ECOOL Meeting 03/26/10 1 Low-E cooler baseline decisions: 1.FNAL’s cooling section “as is” – with weak solenoids, correctors, etc. (to prevent over focusing.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
October, 2009 Magnet Electrical Systems Bob Lambiase October, 2009 Internal Review.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Low Energy RHIC e - Cooling Meeting Minutes – 11/5/14 1.Funding is available to purchase magnets. 2.Comment during presentation of attached slides: 180.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
January 4, 2007 RHIC II Project Internal Cost Review Existing RHIC power supply Modifications Don Bruno & George Ganetis January 4, 2007 Power Supply Modifications.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
SPHENIX MECHANICAL D. Lynch, R. Ruggiero June 12, /12/2014sPHENIX Mechanical Design.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Beam Line Layout – Cooling Section (to be installed by 1 Dec ember 2015) J. Kewisch wants to move the 20 dipole, yellow (to the right) toward the triplet.
APEX RUN-11 APEX Schedule May 11, 2011 Injection 12am8am BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … Spin Flipper Bai, Pablo, Oddo, Craig, Kevin IPM calibration.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
LEReC. COOLING in Blue RHIC ring COOLING in Yellow RHIC ring 63.9 m to IP2 Beam Dump 20° Bending Magnets DC e - Gun 704 SRF Booster Cavity 2.1 GHz Cu.
LEReC Electron beam requirement for cooling Kinetic energy, MeV 1.6
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Low Energy RHIC e - Cooling Meeting Minutes – 12/17/ For the matching energy of electron and ion beams methods for electron energy measurement were.
Minutes meeting Mapes, Miller, Kayran, Fedotov, Gassner, Hamdi, Bruno, Mahler, Weiss, Hammons, Arno, Nayak, Fite, Bellavia The layout shown in.
LEReC System 1. LEReC Injection section 2016 CeC Beam Dump 45°dipole (CeC) Profile Monitor (ERL HE) No SRF Cavity DC e - Gun ERL Solenoid ERL Halo Monitors.
KEK news ( ) S.Tanaka.
Test of Optical Stochastic Cooling in CESR
LIU–PLI report LIU PSB meeting.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
IR Lattice with Detector Solenoid
Electron Collider Ring Magnets Preliminary Summary
IR Beam Transport Status
Presentation transcript:

Sector 1 Instrument Relocation for LEReC Systems in the LEReC Region (39m - 64m) to be Relocated 7 separate assembliesNew LocationChampionsApproved ARTUS Kickers - Blue V, Yellow HSector 2DreesDrees/Mernick IPMs - Blue H, Yellow VSector 12TepikianTepikian/Minty Moveable BPM & LF SchottkySector 1 (closer to Q4) Brown/BlaskiewiczBrown/Blaskiewicz BBQ Kicker stripline (1m) YO1Sector 2 MarusicMinty/Mernick Triple Purpose Pick-Up YO1 ~42mSector 2Minty/Marusic/Blaskiewicz Mernick/Blask Quad Pick-upSector 2Minty Mernick/Minty Cable Tray Waterfall Systems to be Removed Electron Detectors (8)Zhang/BlaskiewiczBlaskiewicz Luminescence Monitor Cross at B m MintyMinty Stochastic Cooling Ceramic Pick-Ups[6-9 GHz] sector 1 & 2Mernick/Brennan/BlaskiewiczMernick/Blask June 5, 2015

Minutes from Sector 1 Relocation Meeting, May 22 nd 9:15 LCR D. Gassner (Updated Minutes after June 5 th Mechanical Topics meeting) K Mernick suggest moving the BBQ kicker, Quad Pick-up and triple purpose pick-up assemblies to sector 2, yellow (it appears that there is room). This allows shorter cable lengths, moving towards YO1 Q4 would have meant (undesirable) longer cables than the existing. (this was later implemented) K Mernick suggests that we don’t need the moveable X-Y capability on the triple purpose pick-up, this can simplify the relocation effort and beam line assembly. (this was later retracted, decide to keep existing motion features if needed in the future) Can remove the stochastic cooling ceramic pick-ups [6-9 GHz] in sector 1 & 2 since these are no longer used. The preference is for the IPMs to be installed as close to Q3 as possible in sector 12. Since they need to be offset because the beam pipes are close together, the horizontal should be closer to Q3. Jesse working on layout of new IPM locations (plan view) with longitudinal offset and separate stands for review. George suggests prioritizing the order of the installations and a bake-out schedule, see next comment. Need to get Mike Mapes & Dan Weiss involved as soon as possible for vacuum, mechanical and bake-out planning. (Vacuum Group plans to size interconnect beam pipes and bellows after devices are reinstalled) Rob M is following up with Angelika regarding beta function considerations of the new proposed locations of the ARTUS kickers adjacent to the existing ones in sector 2. (Proposed ARTUS locations later determined to be OK) Confirmation that GOF magnets will stay in sector 1 (near Q3), need to check with Gary W’s latest LEReC layout. (This was later confirmed to be OK) Joe T indicated designer Vito committed for this priority and need dedicated mechanical engineers. (Vito plans to start creating 3D Pro-E drawings when he returns from vacation June 12 th )(Ammar M & Taylor C plan to help as needed) Dan Lehn will start to order Rexroth stand materials to prepare for the new device stand modifications. System Champions need to approve the relocation plan for their respective systems. (This completed June 3 rd ) Warm Space Committee needs to approve the relocation plan. (Have verbal from Dan T at May 2 nd meeting)

Next six slides are the Allotment Drawings – Sector 1 Before Relocation – Sector 1 After Relocation – Sector 2 Before Relocation – Sector 2 After Relocation – Sector 12 Before Relocation – Sector 12 After Relocation courtesy Vito De Monte

Sector 1 Before Relocation Remove Stochastic Cooling Ceramic pick-ups Moveable BPM & LF Schottky Moved towards Q4 LEReC Region Remove Electron Detector Q3

Sector 1 After Moveable BPM & LF Schottky Moved towards Q4

Sector 2 Before Relocation ARTUS Kickers - Proposed new locations adjacent to existing ARTUS Kickers in Sector 2 Remove Electron Detector For ARTUS H Kicker Remove Unused Luminescence monitor cross for ARTUS V Kicker Existing ARTUS V Kicker Existing ARTUS H Kicker Use open space for Moveable Pick-ups & BBQ Kicker

Sector 2 After ARTUS Kickers moved from Sector 1 BBQ Kicker, Quad Pick-up & Moveable Pick-ups Quad Pick Up (0.25m)

Sector 12 Before Relocation IPM Proposed locations Area Clear Area Clear Horiz IPM Vert IPM Q3

Sector 12 After IPMs moved from Sector 1, Jesse working On final location, slightly offset to allow space for stands

Courtesy A. Fedotov About 25m of RHIC transport (from 39-64m from IP2) needs to be cleared out soon after Run15 ends so the LEReC beam lines can be installed. 39m 64m Sector 1 Instrument Relocation for LEReC

ARTUS Kickers Multi-use Striplines: Tune Meter Kickers Longitudinal Damper Injection Damper Gap Cleaning - 1 Horizontal kicker and 1 Vertical kicker Assembly - Each Assembly consists of two sets of 2 meter long strip lines - 7/8” and 3/8” Heliax cables - Move to Sector 2, adjacent to existing ARTUS kickers Champion: Drees

Ionization Profile Monitors Horizontal IPM Vertical IPM Each IPM has ~30 cables A common stand for both IPMs in sector 12 was considered until Jesse found a conflict. Present plan is for separate stands with the IPMs offset enough for clearance. Electronics will be moved from 1002 to 1012 Michiko evaluated options for the IPMs: Relocation of BH and YV IPMs: to sector 2 ok for LEReC and 100 GeV p+p. to sector 12 required to resolve profiles for 250 GeV p+p. After consultation with Wolfram (03/16/15), IPMs will be relocated to sector 12. Champion: Tepikian

Moveable BPM & LF Schottky ¼” heliax and motion control cables Move from BI1 41m (from IP2) to 65m (closer to Q4) Champions: Brown/Blaskiewicz

Triple Pick-up Assembly Move from YO1 42m to YI2 59m ¼” heliax and motion control cables BBQ stripline pick-up (1m) Quad pick-up (0.25m) Head-Tail pick-up (1m) Champions: Minty/Marusic/Blaskiewicz

BBQ Kicker (1m strip line) & Quad Pick-Up (0.25m) Base-Band Tune Stripline Kicker 3/8” heliax cables BBQ Move from YO1 40m to YI2 56m Champion: Mernick/Minty/Marusic Quad Pick-up moved adjacent to BBQ kicker to YI2 57m

Cable Tray Waterfall (near Q3) Cables will be rerouted in new tray - Power supply - Vacuum - Instrumentation - Cryo Q3 Dave Phillips working on placing two trays: one against the triplet on the inside of the ring and one against the DX inside of the ring.

Next four slides are Excel versions of the Layouts The s-parameters are approximate for general vicinity indications – Sector 1 Before Relocation – Sector 1 After Relocation – Sector 2 Before Relocation – Sector 2 After Relocation

Sector 1

Sector 2