California Department of Transportation District 11 NSF Summer Team Internship 2012 Tamina Akram ♦ Leonora Pizarro ♦

Slides:



Advertisements
Similar presentations
Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Advertisements

Joe Rouse California Department of Transportation Division of Traffic Operations Office of System Management Operations.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
What is the NSF CAREER Program? NSF website:
Silver Star Rd. (SR 438) Public Meeting Public Information Meeting Intersection Safety Improvements Silver Star Road (SR 438) at Ocoee Hills Road From.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
The mission of California’s Department of Transportation (Caltrans) is to improve mobility across the state. Caltrans aims to accomplish their mission.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
METHODS Each intern conducted subject matter research as independent study format (from home or library) within the Intern Team Surveyed public literature.
Semi-autonomous Robots and Efficiency Through Internet Access Victor Barriga Southwestern College Computer Science NSF Grant.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
California Department of Transportation District 11 - Internship Angela Inciong- SDSU Civil Engineer Tamina Akram- SDSU Civil Engineer.
C OMPLETE S TREETS AND Y OU Alana Hitchcock Complete Streets Coordinator Office of Community Planning Planning Horizons, January 11, 2012.
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Organizing a Rail Office: Keys to Success Tammy Nicholson Iowa Department of Transportation Office of Rail Transportation.
Fresno State – Office of Community and Economic Development Office of Community & Economic Development.
Presented to presented by Truck Size and Weight Wisconsin’s Legislative Process AASHTO Subcommittee on Highway Transport 2013 July 10 th Wilmington, NC.
An Introduction to the Federal Motor Carrier Safety Administration.
Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
Example of Maryland Performance Management Neil J. Pedersen, Administrator MARYLAND STATE HIGHWAY ADMINISTRATION Fall 2008.
Traffic Generation Assessment February 21, What did the County do BEFORE TGA and what is it?
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Petia Guerrero and Arturo I. Sotomayor Department of Mechanical Engineering, College of Engineering and Engineering Technology, Northern Illinois University.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Agricultural Careers Geographic Information Systems Specialist By: Dr. Frank Flanders and Ms. Anna Burgess Georgia Agricultural Education Curriculum Office.
INDOT Access Management Study _________________________ Long Range Transportation Planning Section Division of Environment, Planning and Engineering INDIANA.
Research Program Overview National Institute on Disability and Rehabilitation Research Robert J. Jaeger, Ph.D. Interagency and International Affairs Interagency.
PennDOT’s Study of NCHRP Research Results Implementation TRB State Representatives & AASHTO National RAC Meetings July 27, Michael Bonini Transportation.
Adam Taylor, San Diego Coastkeeper Lab: San Diego Coastkeeper is currently sampling and retrieving data from 10 of San Diego County’s 11 watersheds. Watersheds.
NSF Grant #: Azhar Yalda & Roberto Gomez San Diego State University Job Details Hired as a tester and support personnel, Azhar provided clerical.
Measuring Travel Time Reliability of Transportation Systems Abstract When traveling people want to be on time and avoid any traveling delays. We worked.
Traffic Engineering Lopez,Juan Lorenzo; Aguilar-Carranza,Natalie Rick Engineering Company, 5620 Friars Road San Diego CA 92110;Caltrans,4050 Taylor Street.
Making Work Zones Work Better Chung Eng Work Zone Mobility & Safety Team Office of Transportation Operations Federal Highway Administration US Department.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 Transit Planning Presented by Priscilla Martinez-Velez California Department.
Caltrans Research Highlights Presented by The California Department of Transportation Tab 63.
Project Location Map Contents of Presentation Welcome Project Location Map Contents of Presentation Agency Involvement & Responsibilities Project Purpose.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 April 3, 2013 SBCAG North County Subregional Committee State Route 246 Passing Lanes.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
Presented by Justin Mirante Technology and Engineering Teacher and Department Chair
CUTC/RAC Collaboration Meeting Coco Briseno California Department of Transportation (Caltrans) July 28, 2015.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
US 421 Centerline Rumble Strips in Chatham Co. Renee B. Roach, P.E. and Al Grandy May 2, 2007.
HUMAN RESOURCE DEPARTMENT In collaboration with QUALITY ASSURANCE DIVISION Engr. Farakh Javed Assistant Director Quality Enhancement Cell Good Governance,
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
Towards Zero Copies Brian Alconcel, P.E. Chief, Office of Highway System Information & Performance CALIFORNIA DEPARTMENT OF TRANSPORTATION - CALTRANS.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 (formerly 5305) Transit Planning Presented by Priscilla Martinez-Velez California.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
Project Sponsor: Ohio Department of Transportation District 12.
2007 Incident Management Summit Sri Balasubramanian Chief, Office of Emergency Management Division of Maintenance California Department Of Transportation.
District 11 CEAL Meeting: Bike/Ped Update SETH CUTTER DISTRICT BICYCLE AND PEDESTRIAN COORDINATOR APRIL 13, 2016.
Visit Our Website at: Click to edit Master title style.
California Department of Education
Improvements to Stockton Street
Irvine Ranch Water District Distributed Energy Storage Case Study
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
Palm Avenue between 9th and 10th Streets
Mrs Lebogang Mogakabe M Tech (Student): Civil Engineering 10 July 2018
ODOT’s Responsibilities under the Americans with Disabilities Act
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

California Department of Transportation District 11 NSF Summer Team Internship 2012 Tamina Akram ♦ Leonora Pizarro ♦ San Diego State University Department of Civil Engineering NSF Grant # DUE INTRODUCTION The California Department of Transportation (Caltrans) is a department in the state of California with the mission to improve mobility across the state. It manages the state highway system which includes the California Freeway and Expressway System and is actively involved with public transportation systems throughout the state. District 11 is in charge of the San Diego county and Imperial Valley located in Southern California. METHODS TAMINA - ADA DIVISION: Corrected ‘Redline’ Design Plans using Bentley Microstation CAD software and the Plans Preparation Manual. Took and calculated field measurements LEONORA - ADVANCED PLANNING DIVISION: Utilized Microstation CAD to draft strip map of the SR-78 highway. Calculated capacity of AM and PM peak hour traffic per lane for SR-78. Corrected weaving analysis on existing Westbound and Eastbound SR-78 interchanges on Microsoft Excel. Caltrans District 11 Office in Old Town RESULTS TAMINA: The slope was adjusted to ensure greater safety for handicap people. LEONORA: The strip map with the calculated capacity per lane allows the engineers to see which lanes along the highway exceed standard. Comparisons can then be made between traffic in those interchanges for the next decades. It shows the solution chosen by the engineer will indeed decrease congestion. ACKNOWLEDGEMENTS We would like to acknowledge the National Science Foundation for funding and providing this opportunity. We would also like to thank the MESA staff and Eric Pamintuan for all their guidance. Special thanks to our Caltrans mentors: Al-Jafri Abu-Bakr, Vasant Kale, Mohammad Oladi, Roy Flores, Frank Contreraz, and Benjamin Guerrero. CONCLUSION Our experiences through our internships has given us insight into the transportation engineering industry that we would not have the benefit of obtaining in our academic curriculum. Both of us were able to become familiar with Microstation CAD. Leonora was able to gain more knowledge of highway design and see the process taken by Advanced Planning to resolve deficiencies along the highway. Tamina became much more acquainted with various ADA projects and familiarized herself with ADA rules and regulations. DESIGN – AMERICAN DISABILITY ACT (ADA) DIVISION This division provides the procedures, policies, standards, guidance, technical assistance, and training needed to facilitate the transportation improvements in California. An Example of ADA design: The images below show the corner of Palm Avenue and 13 Th Street. The slope was 13% and was supposed to be lowered to Maximum 8.33% per ADA standard. ADVANCED PLANNING DIVISION This division focuses on developing and maintaining a system that provides safe, reliable transportation, and mobility for the people and services of the state. This involves identifying the structural or operational deficiencies in the transportation system and producing a solution. A Project Study Report (PSR) is formatted which meets the statutory requirements and is a model for Project Initiation Documents (PIDs). Image of the existing sidewalk, which was not Built to ADA standard. Image of the existing design at the corner of 13 Th Street and Palm Avenue before construction. Image of the design at the corner of 13 Th Street and Palm Avenue after construction. Portions of the strip map of the SR-78 showing the Peak AM and PM Traffic. The twelve Caltrans Districts and their counties. Portions of the strip Map of the SR-78 showing capacity for the AM Peak hour. Aerial Views of separate sections along the SR-78 Image of the continuation of the ramp around 13 Th Street and Palm Avenue on Palm Avenue side after construction