WALK WILMINGTON Comprehensive Pedestrian Plan Final Plan Presentation July 7, 2009.

Slides:



Advertisements
Similar presentations
January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Advertisements

1 ODOTs Complete Streets Initiative. 2 Tipping Point for Complete Streets.
Missoula Planning Summit Milestone 14 August, 2008 Missoula, Montana.
Louisiana Safe Routes To School Program
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Safety Conversation: NLTAPA Conference Michael S. Griffith Director Office of Safety Technologies Federal Highway Administration.
Comprehensive Pedestrian Enforcement Captain Thomas C. Didone Montgomery County, MD Police Department 1.
Pedestrian and Bicycle Issues Richmond, CA Richmond Bicycle & Pedestrian Advisory Committee (RBPAC) June 2, 2008.
Wilmington, North Carolina Pedestrian Master Plan Steering Committee Meeting May 8, 2008.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
International Conference on Urban Traffic Safety Creating Complete Streets to Accommodate All Users Peter Lagerwey, Toole Design Group
FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets Florida Department of TRANSPORTATION Billy L. Hattaway, PE District One Secretary.
Florida Department of Transportation, November 2009
Slide 1. Slide 2 Introduction How did you get to school as a child?
INDONESIA INFRASTRUCTURE INITIATIVE A Safe System Supporting Vulnerable Road Users Dr Dale Andrea VicRoads International.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Complete Streets: Building Momentum in Westchester 2012 Southern Westchester Energy Action Consortium.
Bicycle and Pedestrian Funding Overview NYS Bicycle and Pedestrian Advisory Council August 2, 2010 Albany, New York.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
Complete Streets Policy and Implementation Jason Ridgway February 11, 2014.
County Wide Active Transportation Study (CWATS) Master Plan Active Communities Summit – October 3, 2011.
Maintenance and Protection of Traffic (MPT) – HDM Ch 16.
WALK WILMINGTON: Comprehensive Pedestrian Plan Steering Committee Meeting January 8, 2009.
1 WALK WILMINGTON A Comprehensive Pedestrian Plan Wilmington Sorosis Final Plan Presentation October 15, 2009.
Why do you need a plan for walkers? They can walk anywhere, can’t they?
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
1 WALK WILMINGTON A Comprehensive Pedestrian Plan Wilmington City Council Final Plan Presentation July 7, 2009.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
Working Together to Save Lives An Introduction to the FHWA Safety Program for FHWA’s Safety Partners.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Rural Transportation Planning Eunice Fitzpatrick Transportation Planner Kentucky River ADD Hazard, KY.
County of Fairfax, Virginia Department of Transportation 1 Requirements for Pedestrian Improvements on Road Projects in the Board’s Six Year Priority Plan.
Palm Beach MPO Draft Complete Streets Policy Palm Beach MPO Draft Complete Streets Policy Advisory Committees September
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Proposed Wedgefield K-8 School safe routes to school begin with school siting Board of County Commissioners’ meeting February 24, 2015.
Complete Streets Training
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
MISSOULA SCHOOL ZONE SPEED LIMITS PUBLIC WORKS COMMITTEE NOVEMBER, 9, 2011.
Complete Streets Training Module 4a – Understanding Context.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Complete Streets Training Module 4b – Designing for All Users.
Saving the King Street Bicycle Boulevard
Chelan County Transportation Element Update
North Lamar Boulevard Project
Draft Transportation Element September 6, 2017
FHWA Bicycle and Pedestrian Program
NVTA Countywide Pedestrian Plan of July 2016
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Safety Effects of Marked vs
Traffic Study Presented by Keith Wenners, pe, ptoe
Transportation Workshop
MPO Board Presentation
Alex Henry FDOT District Seven Safety Office
Project Location: 35th Ave HSIP8
Presentation transcript:

WALK WILMINGTON Comprehensive Pedestrian Plan Final Plan Presentation July 7, 2009

Today’s Presentation Vision and Goals Plan Overview Plan Highlights Questions

Vision The City of Wilmington will become a pedestrian- friendly environment where citizens and visitors have safe and attractive alternatives for walking in and around the city.

Plan Goals 1. SAFETY- All pedestrians can travel safely along and across Wilmington’s roads and paths –Reduce pedestrian crashes –Install new signalized pedestrian crossings –Educate drivers, pedestrians and police 2. TRANSPORTATION CHOICE- Pedestrians of all abilities have comfortable and convenient options –Add two miles of sidewalk annually($420,000) –Address barriers such as crossings, bridges, missing sidewalks –Design streets to balance needs of all users –Improve off-road connectivity (paths, greenways) –Ensure sidewalks and paths are maintained and accessible

Plan Goals 3. BUILT ENVIRONMENT, LAND USE AND CONNECTIVITY- Development enhances the pedestrian experience and encourage walking –New regulations promote pedestrian-scaled development –Require pedestrian connections to adjoining properties, sidewalks and neighborhoods 4. EDUCATION, AWARENESS AND ENFORCEMENT- Drivers, pedestrians and officials understand pedestrian rights and laws. Increased pedestrian activity –Public service announcements and marketing campaigns –Promote walking and bicycling (e.g. Walk to School Day, Wilmington Walks

Plan Goals 5. HEALTH- Wilmington’s residents are physically active and can make more pedestrian trips –Recommend daily levels of physical activity –Improve air quality through reduced routine car trips 6. ECONOMIC DEVELOPMENT- Visitors and customers have an attractive and inviting walking environment –Pedestrian lighting in busy pedestrian areas –Include benches, plantings and other amenities in streetscape improvement projects –Continue to revitalize commercial areas (e.g. downtown Wilmington) that attract tourists and shoppers

What’s in the Plan? Planning Inputs –Review of adopted plans and policies (City & NCDOT) –Assessment of planned and proposed projects (City & NCDOT) –Stakeholder Input Public surveys and questionnaires Interviews with City staff, NCDOT, WAVE Transit, New Hanover County Schools, etc. –Extensive field assessment –Data analysis Demand for pedestrian facilities Crash data Stakeholder comments

What’s in the Plan? Facility Recommendations (Infrastructure) –Sidewalks, crossings, signals, etc. –Project phasing –Approximate cost –Funding opportunities Policy Recommendations –Make sure improvements happen during: New road projects With road repaving or upgrade NCDOT projects Development projects

What’s in the Plan? Design Standards –Road markings (intersections/crossings) –Parking lot design –Medians and pedestrian islands Program Recommendations –Enforcement –Driver and Pedestrian Education –Encouragement Implementation and Funding –Phasing –Responsibility –Funding strategies

planning inputs

Planning Context –Choices: Wilmington Future Land Use Plan –Wilmington Vision 2020: Downtown Waterfront Plan –WMPO Long Range Transportation Plan –Cape Fear Historic Byway Corridor Management Plan Several complementary goals, priorities and strategies in other plans. Sidewalk Priority Areas Map from Choices: Wilmington Future Land Use Plan

Planning Context –Choices: Wilmington Future Land Use Plan Level of Service for Sidewalks (Strategy 1.1.2) –Wilmington Vision 2020: Downtown Waterfront Plan Improve access to the Riverwalk along key pedestrian routes (Strategy 2, Action 1) Several complementary goals, priorities and strategies in other plans. Sidewalk Priority Areas Map from Choices: Wilmington Future Land Use Plan

Planning Context WMPO Long Range Transportation Plan –Recommends corridor improvements to better accommodate pedestrians Independence Blvd. Oleander Drive North and South Kerr Ave. Cape Fear Historic Byway Corridor Management Plan –Multiple recommendations to enhance the pedestrian experience and promote tourism and economic development “Encourage visitors to get out of their cars and safely explore the corridor…” “Increase pedestrian and biking safety along the byway corridor…”

Planning Context NCDOT Board of Transportation Strategic Plan –“Provide a safe and well-maintained interconnected transportation system that offers modal choices for the movement of all people and goods.” NCDOT Board of Transportation Resolution: Bicycling and Walking in North Carolina, a Critical Part of the Transportation System (2000) –“Bicycling and walking shall be a routine part of the NCDOT’s planning, design, construction, and operations activities…” –“North Carolina cities and towns are encouraged to make bicycling and walking improvements an integral part of their transportation planning and programming.”

Planning Context US DOT’s 2000 Guidance Memorandum- "Due consideration" defined as: –A presumption that bicyclists and pedestrians will be accommodated in the design of new and improved transportation facilities –The decision NOT to accommodate them should be the exception not the rule –Must be exceptional circumstances for denying access through design or prohibition

Online and In-Person Surveys Web based survey available from February through June In-person survey conducted at Downtown at Sundown, Saturday Farmer’s Market, Juneteenth Festival

Pedestrian Survey Unsafe and uncomfortable crossings the most critical issue for pedestrians (online 67%, in-person 29%) Factors making it unpleasant to walk –Missing sidewalks –Drivers not stopping for pedestrians –Heavy traffic and fast moving vehicles Areas where improvements are needed –On major corridors – 80% –Near highway interchanges – 65% –Near parks and recreation areas – 50% 76% said they would accept longer car trips if it made it safer to walk

Public Comments “The existing built environment does not support pedestrian travel” “There are very few places that one does not require a car to get to” “Over 50% of bus stops do not have sidewalks” “Very few kids walk or bike to school” “At most major intersections, there are no pedestrian cross-walks or "Walk" lights - cars rule”

Staff and Agency Interviews City Departments –Engineering –Traffic Engineering –Police –Parks, Recreation & Downtown Services –Planning NCDOT –Division 3 –Division of Bicycle and Pedestrian Transportation Cape Fear Public Transportation Authority (WAVE Transit) New Hanover County Public Schools

Field Analysis The Good –Lots of people walking –Good network downtown The Bad –Missing sidewalks along arterials and in newer areas –Many signals without ped signals or crosswalks –Drivers don’t yield to peds

Pedestrian Crash Statistics Wilmington second for number of crashes per capita Top 10 North Carolina Cities for Pedestrian Crashes ( ) Number of Crashes Percent of NC TotalPopulation Crashes per 10,000 People Asheville , Wilmington , Gastonia , Charlotte , Greensboro , Durham , Raleigh , Fayetteville , High Point , Winston-Salem ,

Pedestrian Crash Statistics

–Fatalities and disabling crashes concentrated along arterial roadways –Less severe crashes occurred on all road classifications

Pedestrian Crash Statistics Cost of pedestrian crashes to Wilmington’s economy –Includes medical costs, public services, loss of productivity, employer cost, property damage and change in quality of life Cost of Pedestrian Crashes ( ) Injury Type Cumulative Injuries Cost per Injury 1 Total K Type Injury (fatality)20 $4,200,000 $ 84,000,000 A Type Injury (disabling)45 $240,000 $ 10,800,000 B Type Injury (evident)207 $71,000 $ 14,697,000 C Type Injury (possible)240 $35,000 $ 8,400,000 O Type Injury (property damage only)29 $4,800 $ 139,200 Unknown26 Total567 $ 118,036,200 1 Estimate in 2007 dollars

Identify Areas of Highest Demand for Pedestrian Facilities Population Density + School Proximity + Park Proximity + Allowable zoning density Demand for Pedestrian Facilities

Additional planning inputs Recent developments and ongoing initiatives –Safe Routes to Schools –Neighborhood Traffic Management Program –WAVE Transit Route Restructuring –Cross-City Trail and River to the Sea Bikeway –Riverwalk Expansion Upcoming developments –Traffic signal system upgrade –Pilot scramble intersection –North 3 rd Street Streetscape project –Dawson and Wooster Street Pedestrian Safety Improvements –NCDOT Spot Safety Improvements

pedestrian facility recommendations

Map Existing Conditions Existing sidewalks –Almost 290 miles Existing signalized intersections Existing pedestrian signal heads Existing trails and multi-use paths

Recommended Improvements 450 miles of new sidewalks 182 signal improvements –Retrofit pedestrian signals and crosswalks to existing traffic signals –Install new traffic signals with pedestrian signals –Install pedestrian hybrid signals (HAWKs) and Rapid Flash Beacons Phased over 20 years Prioritized areas with highest pedestrian demand Identified implementation and funding strategies –Grants (State, Federal, Non-profit) –Public/private partnerships –Concurrent with development –Capital improvement plan –Concurrent with road improvement projects

Project Phasing Improvements Short (0-5 Years) Medium (5-10 years) Long (10-20 years) Sidewalks26 miles206 mi.240 mi. Cost (approx.)$3.5 mil.$27 mil.$31 mil. Signal/crossings Cost (approx.)$4.1 mil.$1.9 mil.$1 mil. Where (generally) Downtown, older suburbs, along major arterials Older suburbs, newer areas, arterials and major collectors Newer suburbs, minor collectors

policy recommendations

Policy Recommendations Changes to Land Development Code Fee-in-lieu of constructing sidewalks Install crosswalks and pedestrian signals on all legs at signalized intersections Reduce crossing distances Reduce turning vehicle speeds New pedestrian signal types –HAWK –Rapid Flash Beacon

Land Development Code Current Practice –Sidewalk requirements are currently located in multiple sections of the document –Vague provisions for exemption from requirement to build sidewalk –Unclear requirements for internal pedestrian circulation system design and connections to adjoining sidewalks Recommendations –Consolidate sidewalk provisions into one section –Clarify that pedestrian connections to existing or proposed sidewalks are required for all construction –Provide clear guidance on the design of pedestrian facilities in parking lots

Fee in Lieu of Constructing Sidewalks Concept Allows applicants to contribute money to sidewalk fund instead of building sidewalk Sidewalk projects can be phased or consolidated Money can be used to build facilities in places where they are most needed- even off- site. Recommendation City would establish fees for pedestrian facilities Similar to park fees City would identify pedestrian benefit zones (next slide) Money must be spent within a defined time period

Pedestrian Benefit Zones Concept Complements Fee in Lieu program Funds spent near the development and will benefit pedestrians in that zone Zones should focus on improving continuity and road crossings

Policy Requesting Sidewalks along and crossings of NCDOT Roadways Current Practice Neither Wilmington nor WMPO have formal policy requesting sidewalks and crossing facilities on all non limited access NCDOT road projects. Recommendation City and WMPO should adopt policy requesting sidewalks and crossing facilities on all non limited access NCDOT road projects

Crosswalk Marking Policies Signalized and Uncontrolled Current Policy or Practice Wilmington does not have a formal policy for when and how to mark crosswalks City is required to ask for crosswalks on NCDOT roadway Research found no NCDOT guidelines for marking crosswalks at signalized intersections NCDOT Std. Practice C-36 addresses midblock crosswalks Shipyard Blvd. and Carolina Beach Rd. Vehicles stopped in the pedestrian crossing area Example of legal marked and unmarked crossings

Recommendations Develop crosswalk marking guidelines Adopt NCDOT pedestrian midblock crossing policy Modify design details to show crosswalks Mark crosswalks at signalized intersections across all crossings (legs) Install pedestrian signals on signalized crossings greater than two lanes Crosswalk Marking Policies Signalized and Uncontrolled

Signals and Signage Turning Vehicles Yield to Pedestrians

Signals and Signage Leading Pedestrian Intervals (LPI) Current Policy or Practice Wilmington does not currently have a policy for using LPI at traffic signals Recommendation City should develop LPI policy City should pilot LPI in high pedestrian demand areas (e.g. North 3 rd St. at Chestnut Street) Wilmington should consider LPI where there is high chance for auto-pedestrian conflicts

Signals and Signage Pedestrian actuated signals Current Policy or Practice Many push buttons are not accessible City uses push button activated signals at all pedestrian signals except downtown Recommendation City should adopt 2009 MUTCD policy for button siting and design City should upgrade non compliant buttons City should use concurrent signals in peak ped areas Push button is not accessible

Signals and Signage Pedestrian Hybrid Signal (HAWK) Current Policy or Practice Wilmington and NCDOT do not have current policy for pedestrian hybrid signals HAWK signals are in use in several areas around the country (see movie) Recommendation City should adopt 2009 MUTCD policy for the pedestrian hybrid signal Recommended locations for the signal include high volume multi lane arterials with long distances between signalized intersections (e.g. Wooster Street, Market Street) HAWK Signal- Tucson AZ

Signals and Signage Rapid Flashing Warning Beacons Current Policy or Practice Wilmington and NCDOT both use conventional flashing beacons Neither agency has a policy for rapid flashing beacons (RFBs) Recommendation Wilmington should develop RFB policy based on FHWA interim approval recommendation Wilmington should develop a standard sign detail Wilmington should develop a policy restricting the use of the conventional flashing beacon

Intersections and Roadway Design Turning Radius and Intersection Size Wilmington – 35 foot radius NCDOT – large radius with no islands Recommendation: - Use minimum necessary

Intersections and Roadway Design Island Channelization Current Policy or Practice Island channelization is used infrequently in Wilmington by NCDOT and the city Recommendation Wilmington and NCDOT should provide island channelization between though and right turning traffic –Provides pedestrians with a place to land and wait for traffic –Reduces crossing times and subsequently signal cycle lengths Island Channelization can shorten pedestrian crossings of wide roadways and minimize high speed right turns and promote motorist yielding for pedestrians. Source: Maryland SHA Raised crosswalk

Intersections and Roadway Design Median Refuge Islands Current Policy or Practice Wilmington and NCDOT both install median islands on arterial roadways –However they are frequently very narrow or do not accommodate all types of pedestrians Recommendation Wilmington and NCDOT should provide median islands on all roadways with four or more travel lanes –Should be at least six feet wide –Should provide pavement level cut throughs or ADA compliant curb ramps Must assess impact on intersection and roadway capacity Common median design in Wilmington Desired median width

Considerations Higher speeds contribute to increased likelihood of injury or death when hit Reduced speed limits provides opportunity to reduce travel lane widths- Pedestrian median refuges may be provided without increasing overall road width Wilmington may request speed limit reductions/modifications along NCDOT roadways within city limits 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 20 mphm ph 30 mph 40 mph Killing Speed and Saving Lives, UK Department of Transportation Pedestrian Fatality Related to Speed Fatalities based on speed of vehicle. A pedestrian’s chance of death if hit by a motor vehicles traveling at different speeds Intersections and Roadway Design Posted Speed Limit Reductions

Current Policy or Practice Wilmington does not currently have a policy for setting speed limits along arterial roadways NCDOT establishes speed limits on state roadways using 85 th percentile method –Or “35 mph or lower speed limits should be considered when the overall amount of roadside development is or exceeds 75% for a given roadway length of 0.25 mile. This development may be residential and/or commercial.” - Guidelines for the Establishment of Restrictive Speed Limits policy developed in 1995

Intersections and Roadway Design Posted Speed Limit Reductions Recommendation WMPO Functional Classification Character Zone Local or Neighborhood Collector Urban CollectorArterial Limited Access Arterial or Freeway Central Business District25 85 th percentile Urban Core25 85 th percentile Traditional Suburban th percentile Automobile-Oriented Suburban th percentile Wilmington should consider establishing speed limits based on roadway classification and character zone

Intersections and Roadway Design Posted Speed Limit Reductions Recommendation Speed limits based on road classification and development character Lower speeds where pedestrians are likely to be present –Downtown –Commercial areas –Neighborhoods

design details

Design Details Driveway design Crosswalk marking –Signalized intersections –Non-signalized intersections –Midblock crossings Crossing islands and medians Parking lot design e.g. Proposed Crossing Island Detail

programs education, encouragement and enforcement

Education, Encouragement and Enforcement Education Safe Routes to Schools –Provides funds to support projects and programs NHTSA Child Pedestrian Safety Curriculum –Develops safe walking skills in elementary school kids Collaboration with Media –Newspapers, web, radio and television Encouragement Walk to School Day –Annual event celebrating kids and parents walking Walking and Running Clubs –Regularly scheduled events –Clubs for all ages and abilities

Education, Encouragement and Enforcement Enforcement Police training –Pedestrian laws, rights and responsibilities –Accurate crash reporting –NCDOT officer training curriculum Targeted enforcement –Improve driver and pedestrian behaviors Jaywalking and failure to yield –Crosswalk stings –Speed control

Design Study Areas South College Road and New Centre Drive Shipyard Boulevard and Carolina Beach Road Eastwood Road and Military Cutoff Road

South College Road and New Centre Drive New Centre Drive and South College Road

South College Road and New Centre Drive

implementation and funding

Questions?