ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September 2014 - San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.

Slides:



Advertisements
Similar presentations
1E. TsitronePWI TF meeting 13-15/11/2006 Euratom ITER divertor status Annual ITER divertor meeting (4-6 october 2006, St Petersbourg) Memorandum of undestanding.
Advertisements

Report from US ITER Fusion Power Associates December 15, 2011 Ned Sauthoff Project Manager.
Page 1 SUISS ILOS – 20/06/2012 The ITER Project Overall Procurement Strategy and Business Opportunities ITER Organization Françoise Flament Head of Procurement.
Office of Central Integration and Engineering
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
EPICS Collaboration Meeting – Aix-en-Provence June 2010 Page 1 ITER welcomes EPICS WD Klotz ITER int. Organiztion That’s me.
EFDA Fusion Roadmap Status of implementation Francesco Romanelli EFDA Leader.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
Japan considerations on design and qualification of PFC's for near term machines (ITER) Satoshi Suzuki 1, Satoshi Konishi 2 1 Japan Atomic Energy Agency.
ITER Cryoplant System Status
Page 1 Assembly and Installation Information Day – 21 st May 2015 © 2015, ITER Organization ITER_D_RDUX69Page 1 Tender Processes and Rules Françoise Flament.
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
1 The Broader Approach Projects P. Barabaschi F4E Garching – 14 Apr 2011.
Page 1 Electrical Supply Contract Information Day – 16 th July 2015 © 2015, ITER Organization IDM UID: iTER_D_R6QAFK Page 1 Tender Processes and Rules.
Norbert Holtkamp, October Status of the ITER Project Norbert Holtkamp Status of the ITER Project Norbert Holtkamp Principal Deputy Director General.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
Kaname Ikeda, October Status of the ITER Project Status of the ITER Project Kaname Ikeda ITER Nominee Director-General October 2006.
General Info and Procurements Výroční schůzka v TIC Praha, 07.září 2010 Podklad Contract and Procurement Group.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
TBM Costing Lessons from Recent ITER Activities Scott Willms Los Alamos National Laboratory Presented at INL August 10, 2005.
Hutch Neilson Princeton Plasma Physics Laboratory K-DEMO Project Meeting 26 June 2013 NFRI-PPPL K-DEMO Project Status and Plans Overview.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
Energy for the Future Belene Nuclear Power Plant Project Status.
Norbert Holtkamp, October The Engineering Challenges of ITER The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Status of QUACO project
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC November, 2003.
Healthy Young Minds Matter: The Procurement Process John Fuller Assistant Director - Procurement NHS Gloucestershire September 2009.
Fusion Technology Summary Report Jean Paul Allain IEEE-NPSS AdCom Meeting July 19, 2014 Paris, France.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
O. Kester, NuSTAR annual meeting, 27/02/2013
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Next Step & Time plan Marcello Losasso, CERN
CSP 25th November 2010 Technical agreement number 3: overview
What is BSBF2018 Big Science Business Forum 2018 will be the first one-stop-shop for European companies and other stakeholders to learn about Europe’s.
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
MicroMegas Mechanical Meeting --- Cern April 2014
Accelerator Module Test Facility
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
ILO meeting #40 Ongoing & Forthcoming Calls
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
Youth Pre-Apprentice Recruiting, Screening and Testing
Report on HIE-ISOLDE Status
VLT Meeting, Washington DC, August 25, 2005
The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006 Norbert Holtkamp, October 2006.
Prototype cryomodule development
Daresbury ESS In-Kind Contributions
February 2007 Note: Source:.
Bunker Project Schedule/Budget
MET workshop Eldin Mukovic
Progress in the ITER Neutral Beam Test Facility
Globus-M2 will be constructed by the end of 2015
East Hall under construction
Presentation transcript:

ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 1

Reminder: MIG/BI GroupReminder: MIG/BI Group F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 2

Magnets (PF Coils) Awarded: Winding tooling {OPE-463]: signed with Sea- Alp consortium on 8 th of May On-going: Impregnation & Additional tooling [OPE- 559] Under evaluation: Site & Infrastructure Management [OPE- 568] Under preparation: Manufacturing and cold test [OPE-570](CFT 11/2014) Cold test engineering study and facility construction [OPE-585]-cf market survey F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 3

In VesselIn Vessel Divertor Under evaluation: OMF-567: 3 rd Tungsten IVT prototype (deadline 17/06): start of the dialogue in September 2014 (target contract signature June 2015). Cassette body assembly: market survey mid (target CFT Q1 2016) First Wall Awarded: [OPE-443] full scale prototype. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 4

Remote HandlingRemote Handling Awarded: Divertor RHS [OMF 340-1] to Assystem UK (rank 1) On-going: Cask & Plug RHS [OMF-577] CFEI published 3 rd June Deadline for requests to participate: 4 July Invitation to dialogue: expected October In-Vessel Viewing System [OMF-383] on-going dialogue since mid July Final invitation to submit tender: December Tender submission deadline: January Expected Award: July Under evaluation: Neutral Beam RHS [OMF 340-3] Tender phase ongoing, deadline for submission of tenders 16/06/2014. Expected Award: ExCo Jan F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 5

Cryoplant & Fuel cycleCryoplant & Fuel cycle Tritium Plant Under preparation: Conceptual design for Hydrogen Isotope Separation System [ex-OPE-441]. Possible ITA signature with IO. Target CFT Q Vacuum pumping Awarded: OPE-551: He gas transfer lines. Signed on 04/09/2014 with Criotec Impianti. F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 6 ITER Cryopump component

TBM & Materials developmentTBM & Materials development Ancillary system F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 7

Technical SupportTechnical Support F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 8

Planning and SchedulingPlanning and Scheduling Under evaluation: [OMF 555]: FW for dual use export compliance services [OMF 556]: FW for Planning and scheduling [OMF 557]: FW for Quality Inspection F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 9

Neutral Beam & EC Power SuppliesNeutral Beam & EC Power Supplies F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 10 1 MW CW Gyrotron (140 GHz) W7-X

Diagnostics F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 11

Buildings (and site adaptation) 1/2Buildings (and site adaptation) 1/2 F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 12

Buildings (and site adaptation) 2/2Buildings (and site adaptation) 2/2 F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 13

Antennas & Plasma EngineeringAntennas & Plasma Engineering EC launcher Antennas F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 14

F4E Market Intelligence group - ILO Meeting #26 – 29th September 2014 – San Sebastian 15 ILO Meeting #26 Market surveysILO Meeting #26 Market surveys Market Surveys on-going DIAGNOSTICS- bolometer sensor manufacturing MAGNETS- PF coils cold tests Market Surveys to come DIVERTOR – Cassette assembly, Q EC UL/CODAC – System and Instrumentation Engineering Support, Q Info Days to come 10 th June 2015: F4E Forum