Progress in CW-Timing Distribution for Future Light Sources RUSSELL WILCOX, GANG HUANG, LARRY DOOLITTLE, JOHN BYRD ICFA WORKSHOP ON FUTURE LIGHT SOURCES.

Slides:



Advertisements
Similar presentations
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
Advertisements

XFEL 2004 at SLAC m. ferianis Synchronization and phase monitoring: recent results at ELETTRA Synchronization experiment using light sources currently.
LLRF workshop 2013 Towards the next generation LLRF LBNL Gang Huang On behalf of LLRF Team LLRF workshop Oct. 1, 2013.
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
Laser / RF Timing (Engineering of Femtosecond Timing Systems)
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Leo Holberg et al (NIST)
MIT Ultrafast Optics & Quantum Electronics Group Femtosecond Technologies for Optical clocks, Timing Distribution and RF Synchronization J.-W. Kim, F.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Synchronization System for LUX John Staples, LBNL 26 July 2004.
RF Synchronisation Issues
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Towards ultrastable linac-driven free electron lasers Towards ultrastable linac-driven free electron lasers John Byrd Lawrence Berkeley National Laboratory,
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
RF Synchronization, control and stability Takuya Natsui.
John Byrd 10 August 2011DPF2011, Providence, RI1 Applications of optical technology in accelerator instrumentation and diagnostics John Byrd Lawrence Berkeley.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
SPX – Timing and Synchronization WBS U WBS U Frank Lenkszus Senior Electronics Engineer AES/Controls DOE Lehman CD-2 Review of APS-Upgrade.
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
Volker Schlott SV84, LL-RF Workshop, CERN, October 11 th, 2005 Femto-Second Stable Timing and Synchronization Systems Volker Schlott, PSI Motivation –
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
R. Akre RF / Timing August 11, 2004 LCLS Drive Laser Timing Stability Measurements Department of Energy Review of the Linac.
Lasers and RF-Timing Franz X. Kaertner
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Injection Locked Oscillators Optoelectronic Applications E. Shumakher, J. Lasri, B. Sheinman, G. Eisenstein, D. Ritter Electrical Engineering Dept. TECHNION.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
FROAI2M. FerianisShanghai, August 2011 All-optical femtosecond timing system for the FEL Mario Ferianis, Sincrotrone Trieste, Italy.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
1/19/2006Frank Lenkszus Advanced Photon Source 1 ILC Timing Frank Lenkszus Controls Group Advanced Photon Source Argonne National Lab.
X-RAY LIGHT SOURCE BY INVERSE COMPTON SCATTERING OF CSR FLS Mar. 6 Miho Shimada High Energy Research Accelerator Organization, KEK.
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
On the Synchronization of lasers for FEL facility M.Danailov Electronic versus direct optical locking Direct optical locking in master-slave configuration.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
SQL Related Experiments at the ANU Conor Mow-Lowry, G de Vine, K MacKenzie, B Sheard, Dr D Shaddock, Dr B Buchler, Dr M Gray, Dr PK Lam, Prof. David McClelland.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
Summary Timing and Diagnostics 1 Franz X. Kärtner and 2 Steve Jamison 1 CFEL - DESY and MIT, 2 Daresbury.
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
LLRF Stability Improvements for the Operation of SACLA T. Ohshima*, H. Maesaka, S. Matsubara, Y. Otake RIKEN, SPring-8 center LLRF workshop 2015, Shanghai,
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Integrated phase reference distribution LLRF and laser synchronization system Gang Huang 1, Jin Yang 1,2, Qiang Du 1, Wenhui Huang 2, Yilun Xu 1,2, Larry.
Sub-10 fs RF Regulation at REGAE Matthias Hoffmann for the LLRF team Low Level Radio Frequency Workshop 2015 Shanghai,
Status of SPARC synchronization system and possible upgrades
LCLS_II High Rep Rate Operation and Femtosecond Timing
Beam dynamics for an X-band LINAC driving a 1 keV FEL
RF Synchronization Activity
An X-band system for phase space linearisation on CLARA
ILC Phase Reference Distribution R&D
Timing and synchronization at SPARC
RF Synchronisation Issues
Status of Synchronization System
LCLS Longitudinal Feedback and Stability Requirements
LCLS Drive Laser Timing Stability Measurements
LCLS RF Stability Requirements
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Presentation transcript:

Progress in CW-Timing Distribution for Future Light Sources RUSSELL WILCOX, GANG HUANG, LARRY DOOLITTLE, JOHN BYRD ICFA WORKSHOP ON FUTURE LIGHT SOURCES MARCH 7,2012

Outline How the CW/RF system works Timing requirements for NGLS CW systems running and developing Conclusions

One timing channel Note: this is a synchronizer/controller, not just an RF clock delivery system When controlling a low noise VCO, it contributes <10fs RMS (200m, 20 hours to 2kHz [loop BW]) Rb lock 0.01C AM CW laser 0.01C FS RF phase detect, correct optical delay sensing FRM fiber 1 fiber 2 d1d1 d2d2  FS  RF transmitter receiver Laser or klystron

Information flow in the receiver All implemented digitally on an FPGA Phase sensitivity <0.01º, thus 10fs for 3GHz FS PI phase shifter, VCO or laser optical delay correction RF delay correction signal calibration reference calibration reference sig - ref interferometer error transmission fiber light phase information group/phase factor

Next Generation Light Source High repetition rate electron source CW SC linac Output photon properties –100kHz FEL (seed and experiment lasers, diagnostics) –Wavelength: 1 to 4nm –Pulse width 200fs to 200as

Jitter Tolerances Estimated (CD0 Design) CD0 Jitter Tols: 1.8 GeV, 300 pC, One BC only, Gaussian input, 70-MeV start “10/25/11” better? 3.9 CM1 CM2 CM3 CM9 CM10 CM30 BC1 168 MeV R 56 = 75 mm BC2 640 MeV R 56 = 48 mm GUN 1 MeV Heater 70 MeV R 56 = 4 mm L0  = ? I pk = 60 A L1  =  28° I pk = 120 A Lh  =  ° L2  =  31° I pk = ? L3  =  18° I pk = 600 A SPRDR 2.4 GeV R 56 = 0 L0 RF Phase: 0.050° L1 RF Phase: 0.010° Lh RF Phase: 0.100° L2 RF Phase: 0.010° L3 RF Phase: 0.010° L0 RF Voltage 0.010% L1 RF Voltage 0.010% Lh RF Voltage 0.010% L2 RF Voltage 0.010% L3 RF Voltage 0.010% Gun Timing: 0.1ps Bunch Charge: 2.0% Heater R 56 : 1% BC1 R 56 : 0.005% SPRDR 10fs 670 m to spreader end

3.9 CM1 CM2 CM3 CM9 CM10 CM30 BC1 168 MeV BC2 640 MeV GUN 1 MeV Heater 70 MeV L0 L1 Lh L2 L3 SPREADER 2.4 GeV Stabilized clock reference distribution - <10 fsec RF Control – 0.01%,0.01 deg at 1.3 GHz Beam-based Feedback ΔE Δσ τ SP ΔE Δσ τ SP Δt ΔE τ SP Optical synchronization between arrival time and user lasers- ~1 fsec Master BATBAT BATBAT User laser NGLS timing system overall

High reprate enables better sync Faster “beam-based” feedback –Error terms are correctable up to ~100kHz with 1 MHz sampling Faster averaging for slow but precise drift –Keep as precision for long term

An integrated timing approach Control lasers to minimize high frequency jitter Use final cross-correlator to correct for FEL and thermal slow drift TX modelocked oscillator power amplifier FEL experiment clock transmitter modulator seed lasers experiment lasers

X-ray/optical cross-correlator example Optically streaked photoelectron spectra –From A. R. Maier, FEL 2011 –New J. Phys 13, (2011) (similar, longer pulse) Runs next to experiment, but with special laser

Existing and developing CW systems –Existing LLRF system –Existing LCLS user laser timing –Developing SPX SCRF and user laser timing –Developing 1fs sync in lab

RF timing configuration 11 links now used (?), 32 possible –Separate 3GHz system being replaced channel by channel

The Fermi transmitter is compact Transmitter rack sender Sync head In accelerator tunnel

results Initial out-of-loop test showed 87fs RMS for controlling cavity Final arrival time jitter due to many sync channels, may average Electron bunch arrival time measurement Drive KLY3 unstable Mario. Ferianis, FEL 2011 All-optical femtosecond timing system for the FEL

LCLS laser timing configuration System has 16 channel capability, 6 used Typical 300m fibers, 10ps correction (thermal) linacundulator bunch arrival monitor AMOSXRXPP CXI NEH laser room timing TX laser MEC laser

16 channel transmitter fits in a rack Transmitter is simple –All smarts are in RX “Sender” has only EDFA, local ref arms Amplifier and splitter (“sender”) Modulator Wavelength locker CW laser

In-loop LCLS jitter When controlling a nice RF phase shifter, performance is better than with lasers In-loop laser jitter a good indication of experimental jitter 125kHz BW (gray): 120fs RMS 1kHz BW (black): 25fs RMS 125kHz BW (gray): 31fs RMS 1kHz BW (black): 8fs RMS Phase shifter loop (reference) Laser loop (to experiment)

LCLS experimental (out-of-loop) jitter Variability probably due to readjustment of laser 120fs RMS J. M. Glownia et al, Opt. Exp. 18, (2011) delay, fs Andreas Maier, at SLAC Oct. 2011, also New J. Phys. 13, (2011) 60fs RMS Optically streaked photoelectrons from Ne Ionization of N2

SPX at APS proposed configuration F. Lenkszus, “Phase Reference Distribution for SPX – Notes for Discussion”, APS Internal Note, Jan 2011.

Current SPX LLRF system results

Some conclusions from experience Failures, out-of-spec performance due to ancillary systems A good interface is essential Most jitter due to laser (LCLS)

LCLS user and maintenance interfaces Prevent failures due to operator error Enable quick parameter check for maintenance

Our laser jitter studies at LCLS Single side band phase noise measurement At the ~2kHz resonance, gain <1 to avoid oscillation This limits noise suppression at lower frequencies –Where most of the jitter comes from Look for mechanical resonances, acoustic noise reference free run locked

Our laser jitter studies at LBNL Modelocked fiber laser tuned with piezo mirror Laser control loop pinged with step Transfer function analyzed Compensation added to loop gain This should allow for higher gain, lower noise

Syncing CEP-stable laser to carrier Envelope is locked to carrier, transmit single frequency, beat with carrier to get error signal –Wilcox et al, J. Modern Opt. 58, 1460 (2011) Like chain and sprockets We are using the full optical bandwidth reprate comb1 line picker line TX line RX comb2 hetero- dyne

Line picker/transmission experiment CW ML ÷5 interferometer controller +FS -FS FS PI amp VCO stability B 100m stability A 0.95fs RMS (picking) Transmission = 0.41fs RMS (B-A) 1550nm fiber lasers No attempt to stabilize long term

Laser sync experiment with Menlo Erbium doped fiber laser used here By adding an EO phase modulator in the cavity, control BW can increase, cut jitter to ~1fs Previous experiments (e.g. Opt. Lett. 28, 663 (2003)) have shown ~1fs jitter with similar schemes, Ti/Sapphire laser used here comb1 comb2 reprate control cross-correlator CW hetero- dyne hetero- dyne Experiment done at Menlo Systems: current piezo BW <8fs integrated jitter EO modulator BW

Interferometer noise is small Length sensor for our 3GHz system Can track 10ns time shift within bandwidth –Impervious to all but fast, hard shocks to fiber 1.4fs, unlocked 52as, locked

Conclusions We currently have two timing systems in operation in FEL facilities, and another in development for a storage ring Using operational experience, we are both improving the existing systems and designing the next one for the NGLS To meet new NGLS requirements, we are developing a ~1fs laser sync system