INFSO-RI ENG Exploitation Plan ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009
INFSO-RI Budapest, June 2009ENG Exploitation Plan Contents ENG Exploitation Plan ENG Potential Internal Customers Requirements for ENG Internal Customers ENG Adption Plan ENG from Research to Production Activities Performed
INFSO-RI Budapest, June 2009ENG Exploitation Plan
INFSO-RI Budapest, June 2009ENG Exploitation Plan Integration of ETICS system in Spago4Q and adoption of the ETICS software for internal use Reduce costs and improve quality of the software a company-owned infrastructure for building, testing and quality verification would bring a total reduction of 50% of initial testing costs and an increase of the overall quality of the projects as an ISO and CMMI level 3 certified firm ENG is highly interested in the quality assurance monitoring aspects The integration ETICS/Spago4Q would contribute to the consolidation of Spago4Q one of Engineering open source products for the quality verification of processes and products
INFSO-RI Budapest, June 2009ENG Exploitation Plan Why Continuous Integration Software integration today …
INFSO-RI Budapest, June 2009ENG Exploitation Plan ENG Potential Internal Customers
INFSO-RI Budapest, June 2009ENG Exploitation Plan ENG Potential Internal Customers Directors and Head of production units They are interested in: Having a satisfied customer Delivering a high quality product Access high level info (Not interested in what kind of tool but in data) Project Managers They are interested in: Simplifying their work Monitoring costs (hardware, personnel etc.) (Reluctant in using a tool they haven’t chosen) Developers They are interested in: Performance An easy to use tool (Reluctant in changing the old tools for new ones)
INFSO-RI Budapest, June 2009ENG Exploitation Plan ETICS for Directors Monitor the quality of the product according to company quality standards (ISO, CMMI, ITIL) Quality metrics A-QCM Gather homogeneous info from projects Build and test reports Having a satisfied customer Delivering a high quality product Access high level info (Not interested in what kind of tool but in data)
INFSO-RI Budapest, June 2009ENG Exploitation Plan ETICS for Project Managers Real-time insight into Progress Build status - Test status -Trend analysis Easy integration with the existing tool set Support for different build tools, Support for different VCS, Plug-in architecture Traceability and auditability of the work performed unique identification of source code used for each build tracebility from the build artifact back to the originating source code Role based mechanism Increased productivity continuous integration and automation automation of Test execution Simplifying their work Monitoring costs (Reluctant in using a tool they haven’t chosen)
INFSO-RI Budapest, June 2009ENG Exploitation Plan ETICS for Developers Not obstrusive Support for different languages and tools Support for different VCS Plug-in architecture Simplifies reuse existing work single place to find available projects Easy to install Linux Windows Easy to use Performance Time spent on building, testing, in opening the webinterface etc.??? Performance An easy to use tool (Reluctant in changing the old tools for new ones)
INFSO-RI Budapest, June 2009ENG Exploitation Plan Requirements for ENG Internal Customers Possibility to have insight into project activities (Trend analysis, graphs) Role based mechanism Easy to Install ( Windows) Easy to use Performance Time spent on building, testing, in opening the webinterface etc.
INFSO-RI Budapest, June 2009ENG Exploitation Plan ENG Adoption Strategy
INFSO-RI Budapest, June 2009ENG Exploitation Plan ENG Adoption Strategy Short Term ETICS part of the API portal; local installation Medium Term Integration of ETICS in Spago4Q Long Term ETICS as a service (Pont S. Martin)
INFSO-RI Budapest, June 2009ENG Exploitation Plan ENG from Research to Production
INFSO-RI Budapest, June 2009ENG Exploitation Plan ENG from Research to Production ResearchInnovationProduction Ideas for research projects Technological experimentation Risults from research projects Verification of architectural and technological solutions
INFSO-RI Budapest, June 2009ENG Exploitation Plan Activities Performed
INFSO-RI Budapest, June 2009ENG Exploitation Plan ETICS software for internal use ENG project managers in the research area (CASPAR, Pharos, Qualipso) Representatives of companies part of Engineering group (Neta, Engiweb Security S.p.A) R&I department Head and PMs Meetings with Spago4Q representatives PM and technical personnel High level integration study Stage to finalize the integration study and to perform integration (September/October)