A. Perin, CERN, TE-CRG, 13 June 2012 1 ICL, 13 June 2012 Consolidation of the DFBX CL control system.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
WIRE SAW TO CUT PIPES. SPECIALIZED WIRE SAW TO CUT PIPES Technical details: electric or hydraulic driven easy to fix to the pipe under.
The cryogenic systems of the ATLAS and CMS detectors Johan Bremer on behalf of TE/CRG 06/06/2013AFF.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
11/07/20071 Hardware Commissioning Forum: DFBs R. Rabehl AT-ACR.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Zian Zhu Magnet parameters Coil/Cryostat/Support design Magnetic field analysis Cryogenics Iron yoke structure Mechanical Integration Superconducting Magnet.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
19/02/2014A. D'Auria CERN/PH-DT-DI Maintenance ID flushing system:  Maintenance 2 dryers  Installation 2 flow meters  Maintenance of several hygrometers.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT 24 Feb 2004 R. BossertCERN/KEK/FNAL Meeting 1 Inner Triplet Interconnects Electrical Connections.
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
A. P. AT-CRG, 21 October MP3 21 October 2009 Gas flow control valves for current leads brief overview A. Perin, TE-CRG.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
NA62 RICH Gas System V2.0 S. Haider PH/DT/DI LHC-Gas-Project.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Dimensions, pressures and temperatures of cryogenic circuits for the SPL U. Wagner TE-CRG.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
GIF++ gas system Outline:  Beam and cosmic trigger  Gas distribution panels  Gas detection (present and final layout)  Conclusions 14/1/2015R. Guida,
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
A. Perin TE-CRG, 06 April LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs A. Perin, TE-CRG.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
AT/CRG/cd 1 DFBX Low Current Lead Chimneys Consolidation May 16th 2008.
CERN Cryolab CO 2 cooling for pixel detectors Investigation of heat transfer Christopher Franke, Torsten Köttig, Jihao Wu, Friedrich Haug TE-CRG-CI.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
M. Battistin –17 th d June 2009 DC Project 1 M. Battistin 17 th June 2009 Detector Cooling Project - WP3 Advancement status.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
IBBelle: Status & Plans
Considerations from machine protection and the ELQA teams
He Plant, LN2 Systems and Commissioing
IT-4189 Supply and installation of a cryogenic distribution system
Cryo equipment strategy in the R2E context
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
HFM Test Station Main Cryostat
Totem Gas Systems ( T1 , T2 ) S. Haider PH / DT1.
Gas System Commissioning
Micro-channel Cooling
Forum on Tracking Detector Mechanics - Bonn, May 2016
XFEL Vacuum System Commissioning
GIS Portal Racks Project
Mains Plug Wiring: Brown lead Live Blue Lead Neutral
IT & D1 HeII cooling-variants
Second Meeting of the Material Budget & Engineering Working Group
Cryogenics – The Basics
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system

A. Perin, CERN, TE-CRG, 13 June Outline The current control system has limitations on the current ramp rates and accelerations. For the 120 A the limitations are even more severe and do not allow the proper operation of these leads (cf LHC-DFBX-EC-0002 ) The thermometer used to control the gas flow was installed during the commissioning phase. It is not redundant and it is exposed to potential damage during the interventions on the DFBXs. The control method that is currently being used does not give any information on the actual real cooling of the leads and allows just a minimal level of control. Goals of the project: Improve robustness of control system Remove the limitations due to the current control system

A. Perin, CERN, TE-CRG, 13 June Outline On the 8 DFBX there are 112 resistive 600A leads 80 resistive 120 A leads : 40 control loops For each DFBX (14 x 600 A) + (5x 120A) gas flows

A. Perin, CERN, TE-CRG, 13 June Main points Main technical features Control in open loop: mass flow as a function of current in the leads Non radiation-hard flowmeters located in protected areas Gas flow to be routed to the flowmeters and back (max 100 m) (e.g. 0.1 g/s, diam. 15 mm tube, DP = 7 mbar) Get the information on electrical current and use it to regulate the mass flow

A. Perin, CERN, TE-CRG, 13 June Main points Main technical features Control in open loop: mass flow as a function of current in the leads Non radiation-hard flowmeters located in protected areas. (development of radtol flowmeters could not be done) Gas flow to be routed to the flowmeters and back (max 100 m) (e.g. 0.1 g/s, diam. 15 mm tube, DP = 7 mbar) Get the information on electrical current and use it to regulate the mass flow What do we need? -Install a rack (std. 19") with 19 flowmeters in a protected area for each DFBX -Signal connection to the cryo racks (approx. 40 wires) -Routing of 19 pipes diam. approx. 15 mm (inner diam) from DFBX to rack + routing of a 50 mm pipe back to the helium recovery line. -Get the electrical current information to cryo PLC.

A. Perin, CERN, TE-CRG, 13 June Main points What do we need? -Install a rack (std. 19") with 19 flowmeters in a protected area for each DFBX -Signal connection to the cryo racks (approx. 40 wires) -Routing of 19 pipes diam. approx. 15 mm (inner diam) from DFBX to rack + routing of a 50 mm pipe back to the helium recovery line. -Get the electrical current information to cryo PLC. Installation of racks -One standard rack / DFBX -Located next to cryo rack where possible (R2E)

A. Perin, CERN, TE-CRG, 13 June Main points Installation of racks -One standard rack / DFBX (could be different shape if needed) -Located next to cryo rack where possible (R2E) -First analysis for possible locations