MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from.

Slides:



Advertisements
Similar presentations
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Advertisements

Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
International Muon Ionization Cooling Experiment Edward McKigney Imperial College RAL March 25, 2002 Physics Motivation and Cooling Introduction.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
Neutrino-CH 19 October 2006 Alain Blondel HARP and K2K 1. The K2K experiments 2. beam related uncertainties 3. HARP and results 4. K2K and results 5. conclusions.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Slow controls and instrumentation of MICE 1.Physics and systematics 2.How the state of the cooling channel gets defined 3.Engineering for the signal readout.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
Downstream e-  identification 1. Questions raised by the Committee 2. Particle tracking in stray magnetic field 3. Cerenkov and calorimeter sizes 4. Preliminary.
Alain Blondel Detectors UNO (400kton Water Cherenkov) Liquid Ar TPC (~100kton)
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
MICE analysis meeting Alain Blondel 5 August MICE -- what running strategy? disclaimer: of course we will evolve the running strategy as problems.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
Goal of MICE:   out /  in of   Assuming a standard (or agreed to) definition of 6-D cooling.  We can also assume that the tracker can give.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Alain Blondel Neutrino Factory scenarios I will endeavour to address some principle design issues related to the physics use of high intensity muon beams.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Controls for Particle ID/tracking in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Needed for particle ID/tracking M. A. Cummings May.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Controls and monitoring in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Data record M. A. Cummings April 2004 CERN.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
1 Neutrino detector test beam requirements 0. Disclaimer 1. News from the neutrino scene 2. Beam requirements for AIDA and others.
MICE – Video conference Alain Blondel, 17 December   MICE selected NEWS: Future meetings Safety review Study of controls Gateway I & Toward Gateway.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
(one of the) Request from MPB
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE news Alain Blondel 20 – NEWS 1.CERN’s SPSC at Villars: recommandations 2.MICE step Upcoming gateway steps 4.RF from LBNL (Mike)
Accelerator R&D for Future Neutrino Projects
M. Migliorati, C. Vaccarezza INFN - LNF
Alain Blondel 11 October 2010 GDR NEU2012 summary
The Way Forward ISS to IDS
GEANT Simulations and Track Reconstruction
Presentation transcript:

MICE CM at CERN Alain Blondel, March 29 -> April MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from the approval front 3.Agenda of this meeting 4.Aims and charges

MICE CM at CERN Alain Blondel, March 29 -> April Neutrino Factory status in the commmunity (Europe) There was a meeting on Neutrino Oscillations in Venice (Dec. 2003) This was not prepared by the 'ECFA/BENE' organization but by an independent team missioned by the INFN and IN2P3 managements. The conclusions were very much in support of -- a very large underground Water Cherenkov detector in the Fréjus Tunnel (there is a franco-italian agreement to study/promote this) -- the CERN SPL (or high intensity proton driver) and beta-beams -> study of oscillations of electron and muon (anti)neutrinos of O(500 MeV) there was a paper by L. Maiani in support of this scenario Neutrino Factory is considered as a possible step beyond this: 1. present: CNGS programme 2. next: J-PARC neutrino programme (T2K) nuclear reactor expt. (Double-Chooz) 3. Megaton Cherenkov and SPL (beta-beam) 4. Neutrino Factory

MICE CM at CERN Alain Blondel, March 29 -> April Neutrino Factory is seen as -- more precise -- allowing experiments that are decisive in solving ambiguities o energy spectrum o conjunction of e   and e   experiments (and anti-neutrino) which require high energy e -- the first step towards muon colliders Why is it not placed earlier? my interpretation: -- seen as technologically uncertain -- seen as very expensive

MICE CM at CERN Alain Blondel, March 29 -> April Where will this get us… comparison of reach in the oscillations  right to left: present limit from the CHOOZ experiment, expected sensitivity from the MINOS experiment, CNGS (OPERA+ICARUS) 0.75 MW JHF to super Kamiokande with an off-axis narrow-band beam, Superbeam: 4 MW CERN-SPL to a 400 kt water Fréjus (J-PARC phase II similar) Neutrino Factory with 40 kton large magnetic detector Mezzetto X 5

MICE CM at CERN Alain Blondel, March 29 -> April NUFACT Superbeam only Beta-beam only Betabeam + superbeam Upgrade 400kton-> 1 Mton J-PARC HK 540 kton? 3 sigma sensitivity of various options

MICE CM at CERN Alain Blondel, March 29 -> April Neutrino Factory studies and R&D USA, Europe, Japan have each their scheme. Only one has been costed, US study II: Neutrino Factory CAN be done…..but it is too expensive as is. Aim: ascertain challenges can be met + cut cost in half. + detector: MINOS * 10 = about 300 M€ or M$

MICE CM at CERN Alain Blondel, March 29 -> April Our difficulties in finding the funding are undoubtedly related to the perception of Neutrino Factory as a long term, expensive and uncertain goal. Yet, the physics case is as strong as ever… and the progress in the R&D is remarkable. => we must keep insisting on the physics virtues of muon storage rings, and perform the R&D that will bring the technology closer to reality.

MICE CM at CERN Alain Blondel, March 29 -> April some NEWS from the approval front (more will be summarized in the collaboration board meeeting) -- UK Gateway 1 will be passed with ambre light (red on funding) Not official yet -- US funding review will be April "However, that has now been changed and we are aiming for sometime in May " -- CH exceptional funding request was submitted in october 2003… positive review but negative outcome in march will go into regular funding at lower level. (more in september 2004) -- EU design study proposal (Rob Edgecock et al) will be submitted in february will include MICE request -- Italian funding request refused in RAL management will visit INFN management as soon as Gateway 1 is official main stumbling block as I see it: funding for the spectrometer solenoids

MICE CM at CERN Alain Blondel, March 29 -> April  - STEP I: spring 2006 STEP II: summer 2006 STEP III: winter 2007 STEP IV: spring 2007 STEP V: fall 2007 STEP VI: 2008

MICE CM at CERN Alain Blondel, March 29 -> April MICE collaboration meeting 29 March -- April some aims as defined in RAL oct internal safety review to be passed (and was passed, congratulations!) answer committees questions and address remaining issues (other absorbers, heat load, etc.) -- clarify RF power source scenario -- establish costs and WBS of experiment --> rebaseline beam cryocoolers detector shielding design particle ID system aim is to eliminate double counting of contingency, sharpen the cost estimates and reduce them if possible (while keeping the experiments ambitions) -- progress on the validation of tracker (number of photons, efficiency, dead channels?) -- begin study of needs in controls and monitoring with help from simulations and design team

MICE CM at CERN Alain Blondel, March 29 -> April Monday 9:30 Plenary (AB auditorium) 13:30 AFCWG (AB auditorium) 13:30 Tracker ( ) technical board meeting ( ) Tuesday 9:00-12:00 beamline (AB auditorium) 10:45 Alignment and tolerances ( ) 13:30 PID (AB auditorium) 13:30 RF ( A) (with phone connection) Wednesday 9:00 simulations (32-1-A 24) 9:00 magnets and integration (AB auditorium) 13:30 Plenary: reports from wroking groups 17:30 Collaboration board meeting (room A) 19:30 buses will wait in front of building 33 collaboration dinner Thursday 9:00 PLENARY (AB auditorium) in particular discussion on controls and monitoring 52 have registered (a record! )

MICE CM at CERN Alain Blondel, March 29 -> April MICE Collaboration Board Agenda CERN March 31 17:30 AB auditorium unless phone connection requested. 1. Approval of the Minutes of the last meeting 2. Spokesman’s Remarks Executive Board Report 3. Funding Situation by country Belgium (G Gregoire) France (J-M Rey) Italy (V Palladino Japan (Y Kuno) Russia (A Skrinsky) Switzerland (A Blondel) UK (K Long, P Drumm) USA (D Kaplan) 4. Technical Coordinator’s Report 5. Any Issues from the Plenary Meeting requiring decisions 6. Procedure for election of Collaboration Board Chairperson 7. Election of First MICE Spokesperson 8. AOB

MICE CM at CERN Alain Blondel, March 29 -> April Controlling MICE A preliminary set of control measurements and experiments Physics point of view -- to begin discussion --

MICE CM at CERN Alain Blondel, March 29 -> April Experimental Systematics Mice fiction in 2007 or so.. MICE measures e.g. (  out  in ) exp = ± (statistical) and compares with (  out  in ) theory. = and compares with (  out  in ) theory. = and tries to understand the difference. SIMULATION REALITY MEASUREMENT theory systematics: modeling of cooling cell is not as reality experimental systematics: modeling of spectrometers is not as reality

MICE CM at CERN Alain Blondel, March 29 -> April Principle of experimenter's point of view. We will measure the emittance ratio with a statistical precision of   ut /  in of    leave aside issues on definition of emittance and such. 6D emittance IS well defined) we have to investigate the sources of systematic errors at a level that is about 3 times smaller, so that 10 independent sources will accumulate to the same level --> aim at keeping each source of error at level if we can.

MICE CM at CERN Alain Blondel, March 29 -> April Example of such: Coil tilt tolerance. Take U. Bravar's MICE note 62: this looks like a quadratic dependence. it takes 4 0 =0.068 rad to get a change by ==> it will take  (tilt) = 0.068rad x sqrt(0.001/0.065) to get a change by this is 8mrad or 0.5 degrees. this sensitivity is (3x) smaller than the tolerance calculated by U. Bravar, because MICE will be sensitive to effects that are somewhat smaller than what is assumed to be needed for the cooling channel. similarly for the transverse position I find ~6mm tolerance instead of 20mm

MICE CM at CERN Alain Blondel, March 29 -> April In fact we will probably be able to position the magnets to a better precision than that. BUT: The magnet system will be operated in a variety of currents and even polarities and it is difficult to assume that the field maps will simply be the linear superposition of those measured on each single magnet independently: forces are likely to squeeze the supports and move the coils in the cryostats. (or maybe not?) ==> we will measure the magnetic field with probes (NIKHEF) (contacts Frank Linde and Frank Filthaut and )

MICE CM at CERN Alain Blondel, March 29 -> April The magnetic measurement devices as from the proposal see pages 52, 53. NB, we need to know *where* the probes are for this to work

MICE CM at CERN Alain Blondel, March 29 -> April quantitydesign tol.monitoringwith beam beam optics transfer matrix: par ex. (p t, p L, phi, x 0, y 0 ) in (p t, p L, phi, x 0, y 0 ) out measure with no RF and empty absorbers each time one changes the mag set-up. positions of coils some mmalignment currents some amp-meter mag field some mag probes amount of absorber (in g/cm 2) = 1mm/35 cmdensity through T & P thickness how??? measure energy loss of muons for 0 absorber, 1 absorber, two absorbers with RF off. RF field measure E to  E/E= measure energy of muons vs RF phase before and after cooling channel What needs to be controlled from the point of view of the physics? How can we control it by design tolerances / by monitoring / with the beam itself

MICE CM at CERN Alain Blondel, March 29 -> April example of such an experiment E out -E in (GeV) simulated by Janot in 2001 this measures E RF (t) (nb: this was at 88 MHz)

MICE CM at CERN Alain Blondel, March 29 -> April summary at first look the required monitoring consists of -- Ampermeter for each coil -- Magnetic field measurement -- monitor position of probes and coil assemblies -- E RF (t) (gradient and phase of each cavity) -- absorber density (i.e. T & P) and thickness. Some of these are not so obvious but this is what one should be able to do in a neutrino factory The muons themselves will provide very powerful cross-checks (energy loss and energy gain, transfer matrix) (this one cannot do easily at all in a neutrino factory) Is this the right approach? Did I forgot something? How does one do that? Who does it?

MICE CM at CERN Alain Blondel, March 29 -> April