Introduction of Quality Procedures in the Electronics Design Office

Slides:



Advertisements
Similar presentations
Softricity LLC Advance slides with arrow keys. Without PDMLynx Informal processes based upon excel, access, paper files No consistency across organization.
Advertisements

The Basics of Information Systems
TE-MPE-EM Costing Betty Magnin 29/11/ Costing History Operational budgets Invoicing Cost balancing over fiscal year 2 29/11/2012.
5S Essentials Five action verbs.
Function Definition  From Investigation to Specification  Defining Functions  The Universal Function Model  Identifying and Documenting Functions.
Printed Circuit Board Design
CERN Betty Magnin / Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Betty Magnin / Erik van der Bij CERN Electronics Design Office.
EUG 20/06/2012 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
PROCAL MULTI DISCIPLINE CALIBRATION SOFTWARE CALIBRATION PROCEDURE MANAGEMENT CONFIGURATION & CUSTOMISATION STAND-ALONE CERTIFICATE PRINTING.
5s Key to work place improvement Lead By: Jayanth Murthy
4/11/2011Rui de Oliveira1.  Collection of the biggest PCB failures we’ve seen at CERN workshop since 10 years.  The PTH (plated through hole) is the.
We make hot joints.. 2 Who we are. Originally part of a leading international handheld repair and rapid prototyping company, Repair point was formed *
Introduction to Quality, Cost & Delivery
Chapter 15 Designing Effective Output
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Visual Workplace - A Prerequisite To Becoming World Class
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Aid Management Platform (AMP) Introduction to AMP Tanzania, February 2009.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Circuit board
Safety, Health & Environment
Autodesk Inventor ® Professional Design, Validate and Document the Complete Machine Autodesk Inventor ® Professional Introduction.
CERN Erik van der BijTS-DEM TS-DEM Development of Electronic Modules Erik van der Bij CERN Electronics development support: how it is organized.
PRESENTED BY, SARANYA , GAYATHRI, II ECE-B.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
MIS 105 LECTURE 1 INTRODUCTION TO COMPUTER HARDWARE CHAPTER REFERENCE- CHP. 1.
Concept & Application  ISO 9000 : 2000  Quality Concepts  Kaizen  Quality circle  5s.
EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
CERN CERN EP-DI-DDL-VV 1 D E M A C - meeting 30 August 2001 This presentation will probably involve audience discussion, which will create action items.
Chapter 12 THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition THE FUTURE OF BUSINESS Gitman & McDaniel 5 th Edition Chapter Achieving World-Class Operations.
Electronic Drafting DFT 58A&B Cliff Monroe - Instructor.
CERN EST -DEM CERN Erik van der Bij EP ELECTRONICS ADVISORY BOARD 4th Meeting 7 November 2002 Erik van der Bij CERN EST-DEM Group leader.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Lesson 13 Databases Unit 2—Using the Computer. Computer Concepts BASICS - 22 Objectives Define the purpose and function of database software. Identify.
5S Introduction – Workplace Organisation
TE-MPE Annual Meeting Activity report of EM section 11/12/2015 Betty Magnin.
Overview of Proposed Changes to the Special Rules for Procedure of the General Assembly and the Standing Rules for the General Assembly, General Board,
Chapter 19 Manufacturing and Quality Control
TE-MPE-EM: Subcontracting Raphaël Berberat
Latest news from GUCS ( Groupe Utilisateurs Catia-SmarTeam ) T.Klioutchnikova10th Catia Users Forum 22/03/2012.
TE-MPE-EM Assembly workshop Betty Magnin 29/11/
TE-MPE-EM Design Office William Billereau 29/11/
FIVE-S HOW IT STARTED We all want to have a more productive and efficient operation; We want employees to be able to get their jobs done, to be less frustrated.
Management Methodology Objectives 1.To create a clutter-free workplace for better movement and comfort of employees. 2.To avoid unnecessary accidents.
Subcontracting of electronics modules
Project Plan, Task Checklist, Estimates Project Prototyping
Welcome ! Capstone Design Lab is a new 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Welcome ! Capstone Design Lab is a newer 4 credit course specifically aimed to give you industry design exposure in a design team atmosphere The course.
Subcontracting and company selection
Interactive Factors in Manufacturing
MPE-EM Workshop Purchasing strategy for electronic modules
Project Plan, Task Checklist, Estimates Project Prototyping
BASIC INFORMATION ABOUT DATABASE MANAGEMENT SOFTWARE
MPE-EM Workshop Design Office William Billereau
Purchasing supplies at CERN
Total Productive Maintenance
GlueX Electronics Review Jefferson Lab July 23-24, 2003
An Overview Microsoft Office.
مقدمه 5S يكي از مباحث عمده در مديريت ژاپني ميباشد كه ابتدا در ژاپن و سپس در ساير كشورها به كار گرفته شده است.هدف 5S به بياني ساده، سامان دادن، نظم و ترتيب،
Lean and Quality Management The 5S
Breakthrough Performance: Implementing the Lean Enterprise
QE 107: Workshop Technology Section 5: Manufacturing Organisation
The Basics of Information Systems
SDLC Phases Systems Design.
Fertilizer Industry Safety Information Analysis and Sharing Program
The Basics of Information Systems
Computer-Aided Design (CAD)
Presentation transcript:

Introduction of Quality Procedures in the Electronics Design Office TS-DEM Introduction of Quality Procedures in the Electronics Design Office Betty Magnin CERN

TS/DEM mission From schematics to mounted PCBs 1 to 200 pieces/project, largest 2000 pieces Project cost: CHF 150.- to CHF 20’000.- Around 800 projects / year (500 new designs, 150 modifications, 150 production only)

Introduction 2002: two Design Offices from EST and PS merged. Both had their own tools and methods 2003: we provided additional services with small series production of electronics 2004: FSU contract requires change of methods 2004: volume of projects drastically increased

TS-DEM Planning office (DEM-BE) Request Circuit or module Design office DEM-BE Planning office (DEM-BE) ‘commercial’ contact Ordering Tracking Invoicing Circuit manufacturing DEM-PMT Assembly DEM-WS Sub-contracting (overflow of CERN capacity) Prototypes, fast turn-around local industry Sub-contracting Large quantities member states

Plan and follow-up the project Process Chart Order components from stores Deliver and Invoice Design librairies Design layout Order PCB’s Order Assembly Order mechanical parts Receive order Advise for DFM Plan and follow-up the project

Why quality procedures ? Understand and satisfy the customer’s needs Standardise working methods Design layout suited for manufacturing and assembly Have a reliable management of the activity, inhouse and subcontracted

The sources of non-quality Can be determined through Ishikawa Diagram (4P’s) People Plant Design Office Procedures Policies

People Determination of designers’ versatility Training through visits to assembly site Technical training to increase versatility and competencies (Cadence, High-Speed Design,…) Regrouping of the two design offices in one building

Plant 5S Process The five S stand for the five first letters of Japanese words meaning: Sorting out (Seiri), Systematic arrangement (Seiton), Spic and span (Seiso), Standardizing (Seiketsu), Self-discipline (Shitsuke) Eliminate what is useless Organise archiving of paper document and files Organise storing of components and documents for orders

Procedures Specify input data (together with DUG) Promote Design Review (together with DUG) Elaborate input data verification check-list Define a common procedure to produce documentation of mechanics drawn with Autocad Review generic PCB layout (panelisation, fiducials,…) Specify format of board and assembly part-lists Elaborate output data validation check-list EDMS archiving

Document management via EDMS Schematics Specification PCB Layout Manufacturing Assembly Mechanics Pictures Supplier info Items: EDA-xxxxx We send only the EDA number to subcontractors!

Policies Standardise design rules Standardise librairies                                 Policies Standardise design rules Standardise librairies Review available standards: JEDEC, NF, IPC, … Define IPC as the standard: covers all aspects from design to manufacturing, assembly and repair IPC: Institute for Printed Circuits

Prototype electronics production multi-layer PCB, standard priority Planification Prototype electronics production multi-layer PCB, standard priority Layout (and queue) 4 weeks PCB fabrication 3 weeks Queue 2-3 weeks Layout 1-2 weeks Assembly 2 weeks Margin 1 week Control of the turn-around time means: - tight planning and follow-up - companies you can rely on

Planification Until 2004, several tools JMT2 project for DEM one Filemaker database, 3 Excel files JMT2 project for DEM released for invoicing of multisection jobs Under test for the invoicing of specific PMT and WS jobs In work for the planning aspects The Design Office needs a single centralised activity management tool until the JMT2 project of TS/CSE is fully released

Activity management tool Centralised entry of all needs Simultaneously accessible by all section members Issues queries of orders to be launched by a supplier (internal or external) Issues queries of ongoing or late orders Issues the global invoice, for a one time entry in JMT2 when the job is delivered Simple MS-Access Data Base requiring no special knowledge to be maintained

Outil de gestion-planification

Next steps Continue with the planned actions Training (visits of PMT and WS workshop, EMC, …) Document in EDMS the procedures defined in 2004 Finalise the input and output controls for designs Finalise the implementation of JMT2

Conclusions Quality is important There is a lot to improve will give cheaper and better producible electronics will give higher quality designs (more reliable, less noise...) I have the ideas on how to improve using standards, technical training, improving procedures We have started the process, but it is not easy long history high workload for LHC no resources for a “bureau de méthodes”