J A Hill – EID RAL 1-2 September 2005 1 EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.

Slides:



Advertisements
Similar presentations
ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
Advertisements

CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
Sci-Fi Tracker: Progress Report Malcolm Ellis, MICE Video Conference Wednesday 6 th October 2004.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
EC: 7 DISK concept Preliminary considerations
ATLAS Internal ID Service Integration
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Integration and Services RE3/1 and RE4/1
Integration and Services RE3/1 and RE4/1
End-cap Mechanics FDR Overview of the Project
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
T1 status (a selection from EDR presentations)
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Mini-drawers, FE-ASIC , Integrator
G. Carboni for the Muon Group
Services Layout – Update
Chamber Design and Integration RE3/1 and RE4/1
Far Detector Activities Late 2017 – Early 2018
MicroMegas Mechanical Meeting --- Cern April 2014
Status of the PANDA Solenoid Magnet Production in BINP
UK CMS Oversight Committee Mtg
Type 2 Supercrystal Type 1 Supercrystal
Status of the PANDA Solenoid Magnet Production in BINP
as a prototype for Super c-tau factory
Presentation transcript:

J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September

J A Hill – EID RAL 1-2 September ECAL EE End Cap components BACKPLATE SUPPORT RING SUPERCRYSTALS THIS FACE PATCH PANELS ENVIRONMENTAL SHIELD

J A Hill – EID RAL 1-2 September EE End Cap Mechanics 2005 Highlights End Cap Dee's have now been successfully fitted to both YE+ (Sept 04) and YE- (Feb 05) ends of CMS detector. New contract agreement for the supply of four ‘new’ support rings signed agreed in May Production of Environmental Screen in Russia. Progress in the layout and design of major End Cap components, Electronics units and related service support systems. End Cap services have been fitted to both YE+ and YE- using the final design of the End Cap Patch Panels.

J A Hill – EID RAL 1-2 September ECAL End Cap – at CERN during 2005 End Cap Major components trial fitted to YE- in February Like the YE+ fitting the assembly was successful with all EE/HE fixtures holes (bar one) being clear to fit. Major dimensional gaps between HE/EE/ES checked manually, clearance as expected. The final design layout of the End Cap Patch Panels was presented to CERN in early 2005, have now been used on the dummy End Caps for the service routing of all cables. ‘Dummy’ End Caps have been fitted to both YE+/YE- ends to allow the routing and laying out of End Cap and Preshower services. A decision has been made to introduce a flexible link between the End Cap cooling connections on the Patch Panels to the ECAL service trays, RAL has provided a specification for this requirement.

J A Hill – EID RAL 1-2 September ECAL EE Endcap Support Rings Production All four rings ‘cold rolled’ at Barnshaws, July ‘Rough’ machining of ring section at TM Engineers, August A new contract was placed with TM Engineers in May 2005, delivery at CERN for first pair expected October 2005, second pair December Base material supplied by ALCOA in 4 sections 350mm x 200mm x 7.7metres lengths. Sections ultrasonically inspected for flaws, none found. Each section cold rolled to correct internal radii (tolerance within 5mm of 1.65m rad). All rolled section have been stress relieved by heat treatment. Sections are currently undergoing rough machining, a further heat treatment may follow prior to final machining (note that 82% of material is machined away!). RAL staff to witness final load test….

J A Hill – EID RAL 1-2 September ECAL EE End Cap component Production EE End Cap Environmental screen under construction at Energia, Moscow. Environmental screen produced as single circular component before ‘splitting’. Procurement and engineering dealt with by IHEP Protvino, RAL engineers provide support. Delivery of both End Cap shields due at CERN October/November Castings of 100ch and 75ch cooling bars produced. Machining of all cooling bars in progress, delivery to CERN believed to be Open section of outer shield showing the cooling circuit. ‘Complete’ section of outer shield. Arrangement of prototype 100ch cooling bars.

J A Hill – EID RAL 1-2 September ECAL EE End Cap Build – Layout BACKPLATE SUPPORT RING VFE ELECTRONICS MODERATOR END CAP DEESIDE VIEW ~3.6m

J A Hill – EID RAL 1-2 September ECAL End Cap Build - Layers Arrangement at the Rear of the End Cap Backplate Backplate Cooling, fitting of patch panels, FOM Protection plates, HV support End Cap inner Shielding, Front Moderator Protection plates, LV support Mechatronics Support plates Umbilical connection, VFE Mothercards/support frames, LV distribution Mechtronics cooling system, internal flow and return manifolds VFE, LV and FE cards attachment, Inner Moderator Data/trigger fibre boxes plus support Rear Moderator, closure of End Cap

J A Hill – EID RAL 1-2 September ECAL End Cap Build - Progress Detailed drawings of End Cap Moderator system complete. Tender to be dealt with by IHEP Protvino, production in Russia late 2005/early Development of internal manifold systems approaching prototype stage however progress now on hold due to problems encountered on ECAL Barrel cooling. Drawings of current Mechatronics scheme, approaching prototype stage. Development model being produced with machined components from Bristol and Imperial.

J A Hill – EID RAL 1-2 September ECAL End Cap Schedule 1.Production Drawings – Work continues, where possible, towards producing detailed drawings for the manufacture of End Cap components in the region behind the Backplate. The final design of many items are still on hold pending decisions on umbilical design, Mechatronics cooling, HV and LV service routing and LED pulsing system. The current plan is to release all major production drawings by summer Test Beam – The announcement of this will allow the many of the working components to be manufactured to a level between prototype and final production. This includes the electronics cooling system and manifolds, various support plates as well as its supporting structure. Drawings for the 2006 test beam components must be completed by April 2006 as the components will be required for the November 2006 test run. 3.During 2006 it is hoped to use the existing backplates and support ring in the Crystal Palace to further develop the routing and final loom schemes for HV, LV and fibre routing. Procedures for the use of the Super Crystal assembly manipulator to be understood and documented.

J A Hill – EID RAL 1-2 September ECAL End Cap - Summary Good Progress to date New contract for End Cap Support Rings, completion by December 2005 Dry fitting of End Cap Major Mechanics to both ends of CMS a success End Cap Services have been fitted on both YE- an YE+ End Cap Environmental shields to be delivered Autumn 2005 Drawings available for End Cap Moderator system, manufacture to begin Winter 2005 Order placed for VFE cooling bars Further progress required Design of region behind the backplate progressing but requires input and assistance from other ECAL members Attention essential…. Decisions and direction required on engineering for Mechatronics cooling