Team legado 1. Amer Al Mazrouei 2. Mohammed Sharara.

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

CMRSC Division of Hematology/Oncology
Baldrige National Quality Program 2003 Baldrige National Quality Program The Site Visit Process and Evaluating Site Visit Issue Worksheets.
Site Visit Review Just-in-Time Training. Pre-work and Training Judging Examiner Evaluation Process Stage 1 Independent Review Stage 2 Consensus Review.
Team Legados Detailed Design Presentation Team members: Mohammed Sharara 3488 Amir Almazrouei 3529 Mohammed Abdullah3633 Fahad Altamimi 3464.
Project Management. Main Phases of Project Development.
Facilitated by Joanne Fraser RiverSystems
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
The exhibition process The phases of an exhibition.
Project Management Module 3. Keep focused on the timeline Week Prepare for Kick-off Meeting Assign teams Team forming Review and execute.
Silicon Prairie Initiative on Robotics in Information Technology
Silicon Prairie Initiative on Robotics in Information Technology
Starting a project 1 Starting a Project Where do we now start? Where are we going? Will we know when we arrive?
Webinar #1 The Webinar will begin shortly. Please make sure your phone is muted. (*6 to Mute, #6 to Unmute) 7/3/20151.
HKU Faculty of Education1 Project planning Seminar 4 BSIM0011 Project Management.
1 SPIRIT Silicon Prairie Initiative on Robotics in Information Technology Engineering Design Tools.
Program Management Satisfy requirements of all individual projects with minimal resources Human resource is the most expensive Leadership Methods of documenting.
Business Consulting Services Agenda Discussion: Management Reports Discussion: Project Reports Discussion: Engagement Proposal Upcoming Events Review Project.
Family Outreach and Response Program Strategic Plan September 26 th, 2012.
Project Management and Scheduling
HOW TO SUSTAIN YOUR BACKPACK PROGRAM. LOCAL RESOURCES STAFF VOLUNTEERS FOOD CARRIERS TRANSPORTATION FUNDING MEDIA.
C ALL C ENTER O PTIMIZATION P ROJECT J.P. Cap + Vitality, Inc. | J.P. Cap |
Lecture 4: Phases of Engineering Design
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
L545 Systems Analysis & Design Week 4: September 23, 2008.
Do it pro bono. Key Messages & Brand Strategy Service Grant.
1 MBA PROJECT Nasir Afghan/Asad Ilyas. 2 Objective To enable MBA students to execute a client focused challenging assignment and to enhance.
Board of Advisors Roadmap. A few trends… TIMELINE Direct Your Internal CII Team 3 Years Basic Member Established Member Leading Member Upon Joining Establish.
Project Management Donald Hsu, Ph.D. Dominican College
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
WEEK 3 Introduction to Project Management. Agenda Review – Any questions from last week Phase 2: Planning ◦ Project Plans & Deliverables.
TRANSITION PLAN STAKEHOLDER GROUP CENTER FOR DEAF AND HARD OF HEARING EDUCATION.
Preparing for the Launch Mohammed El- Affendi. Launch Major Tasks  The Launch is performed according to script “LAU1”, table 3.1 in the book (page 39),
Software Engineering Management Lecture 1 The Software Process.
Ch 3 & 4 Project Planning & Management. What We Must Do Define: determine scope and specifications. Plan: break the project into pieces that can be assigned.
ME 481 Mechanical Engineering Design Projects Project Management.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
1 Project Kick Off Briefing Cost Data Integrity Project August 30, 2007.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Draft TIP for E-rate. What is E-rate? The E-rate provides discounts to assist schools and libraries in the United States to obtain affordable telecommunications.
Important Idea, Skill or Attitude I learned from this course which I can use in my job: The advance facilitation processes (only stage 2: Clarify desired.
A Progress Report. Work Completed  All criteria have been analyzed and processed for analysis  Data ranges within each criteria have been selected.
DESIGN 1 DPT224 TOPIC 2: ENGINEERING DESIGN PROCESS.
Developing your Research Plan for FemNorthNet Community Case Studies 1.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Goals/ Objectives Safe PortableAffordableEasy to use Reliabl e Score Safe***11114 Portable0***1001 Affordable00***000 Easy to use011***13 Reliable0110***2.
The Design Management Team Framing the Scope of Work and Learning the Roles for the LCC Team.
Slide 1 Project 1 Lab 8 T&N3311 PJ1 Information & Communications Technology HD in Telecommunications and Networking Content of this lesson  Final tutorial.
The P Process Eight Key Questions 1. What is the communication problem? 2. What do we need to do? 3. What materials/interventions do we need to develop?
Discuss the analytical skills, including systems thinking, needed for a systems analyst to be successful Describe the technical skills required of a systems.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
1 Project Management C13PM Session 2 Project Initiation & Definition Russell Taylor Business Department Staff Workroom
This video is for UNC Charlotte faculty developing a response form as part of the content validity protocol. The response form is what expert reviewers.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Project Management ISE 5101 Karl Smith Project Monitoring & Control I Project Meetings.
Reform Groups and Analyze Preliminary Designs. Schedule Week 6 Lab Small Group Presentations Form into three large teams Agree on problem statement and.
Project Management Finals Lesson 1 - Principles - Techniques - Tools.
Systems Implementation,
Welcome W 4.2 Introduction to Engineering Design II (IE 202)
[Solomon Westerman] [PM]
CH 3: Selecting the bid and choosing proposal team
Welcome W 15 Introduction to Engineering Design II (IE 202)
Annapolis High School Parent Information Meeting March 22
Introduction to Engineering Design II (IE 202)
The Survival Plan.
Playground Design Final Presentation
Project Overview.
Presentation transcript:

Team legado 1. Amer Al Mazrouei 2. Mohammed Sharara

1. Purpose and Goal of the project 2. Objectives tree 3. W.B.D tree (work break down tree) 4. Deliverables, timelines and responsibilities 5. D.R.S (data retrieval system) 6. Budget

 Conceive a design for a playground for children with special needs.  The design should be: 1. Safe 2. Affordable 3. reliable

Design of the playground Safe Affordable Reliable Materials Location Surface Equipments Skills developing Educational Mental skills Physical skills Materials Maintenance Cost

Design a Playground for children with special needs (W.B.D tree) Clients problem Establish function requirements Establish alternatives Testing Selecting design Revise the problem Carry out research Develop objective tree Brainstorm Consider means to be used Establish functions Develop charts Establish conceptual design Pair wise comparison Protocol testing Apply the design Review with client Final design selection

 Each team member’s responsibility is presented in L.R.C  Deadlines of deliverables are presented in a calendar

Linear Responsibility ChartMohamad AbdullaFahad Altamim Mohamed Sharara Amer AlmazroueiClient Liaison 1.0 Understand the client`s requirements x xxx 1.1 Clarify problem Statement xo 1.2 Conduct Researches x x 1.3 Develop objective tree xx Draft objective tree x x Review objective tree x o 2.0 Analyze function requirements xxx x 3.0 Generate alternatives xxxx 4.0 Evaluate alternatives x o 4.1 Weight objective ox 4.2 Develop test protocols x x 4.3 Conduct tests xo 4.4 Report test results xo 5.0 Select preferred design xxx xx 6.0 Document design results xx 6.1 Design specification x x o 6.2 Draft final report xx x x 6.3 Design review with client x x 6.4 Final report xxx x 7.0 Project management x 7.1 Weekly meetings xx x x 7.2 Develop project plan xxx x 7.3 Track progress xx x Key: x = Responsibility o = Support

 Team Legado’s D.R.S will be a website used for: ◦ Keeping track of progress ◦ The ability to access files outside work place ◦ Share files between team members

Team members Hours/dayHours/weekpayment/hour (AED) Total (AED) Mohamad Abdallah Fahad Al Tamimi Mohammed Sharara Amer Al Mazrouei The salary includes Transportation Telecommunication Materials Miscellaneous