Introduction and Background URBS 609 Project, Unit 1.

Slides:



Advertisements
Similar presentations
Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Advertisements

CP Chapter 4 Schedule Planning.
Work Breakdown Structures
8-1 Scheduling Scheduling Defined Gantt Charts Network Techniques: PERT and CPM Determining Task Durations Probability and Simulation Some Examples.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Creating the Project Plan
Project Management in Practice Fifth Edition Copyright © 2014 John Wiley & Sons, Inc. Chapter 5 Scheduling the Project.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Systems Analysis and Design 9th Edition
PERT/CPM CALCULATIONS
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Importance of Project Schedules
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
Systems Analysis and Design 8th Edition
Project Planning Using MS Project
Project Management A Short Introduction and History URBS 609 PERT, Unit 1.
Introduction to Project Management. What is a Project? “A planned undertaking of related activities to reach an objective that has a beginning and an.
Project Management and Scheduling
Project Management Chapter 3 BUSI 2106 – Operations Management.
Project Planning Using MS Project Creating a project plan URBS 609 Project, Unit 3.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Planning Using MS Project Basic Navigation and Configuration URBS 609 Project, Unit 2.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
BSBPMG402A Apply Time Management Techniques 1 Apply Time Management Techniques Week 6 Project Time Processes – Part 2 C ertificate IV in Project Management.
Appendix A Project Management: Process, Techniques, and Tools.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
1 Using Microsoft Project 98 to Assist in Managing Information Technology (IT) Projects Kathy Schwalbe, Ph.D., PMP Associate Professor, Business/MIS Augsburg.
Basic Navigation and Configuration URBS 609 Project, Unit 2.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management MS PROJECT.
Project Management Software Application PRM 705 Lecture 32 1.
© 2008 Prentice Hall2-1 Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process.
Creating a project plan URBS 609 Project, Unit 3.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
Advanced Project Management Project Time Management Ghazala Amin.
The Project Management Life Cycle. What is the Project Management Life Cycle? A project life cycle simply includes the necessary steps, from beginning.
Richard Fisher 1 The University of Texas at Dallas Project Management Richard Fisher The University of Texas at Dallas.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Project Time Management
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
BUAD306 Chapter 17 – Project Management. Life is a Project You are already a project manager! Fraternity/sorority projects Sport-related activities Family.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Tips & Tricks for Beginning, Advanced & Intermediate Users Hosted by Michelle A. Thomas, Microsoft V-TSP.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Project Management and Information Security
Chapter 3 Managing the Information Systems Project
Project Planning Using MS Project
Introduction to Project Management Chapter 2 The Project Management Life Cycle Information Systems Project Management: A Process and Team Approach, 1e.
Importance of Project Schedules
Presentation transcript:

Introduction and Background URBS 609 Project, Unit 1

This training module was crafted using PowerPoint by Microsoft Corporation. It has been packaged with PowerPoint Viewer, a standalone Microsoft product that allows a user to view this module without use of PowerPoint. Urban and Regional Studies Institute2  Left mouse-click or enter to go to next slide  Right mouse-click or backspace to go to previous slide  ESC to exit this module This Unit of Instruction was crafted by Robert Hugg For Minnesota State University, Mankato Urban and Regional Studies Institute

 This module will provide:  Introduction to the background of MS Project  Introduction to the Advantages of using MS Project  Introduction to the Hazards of using MS Project  Tips for using MS Project  Background material for project planning  This module is constructed as the first of three blocks in a building block approach Urban and Regional Studies Institute3

 The first assumption of any project planning is that the project goal and tasks are defined  MS Project uses the same assumptions as planning a project manually:  All tasks have distinct begin and end points  All estimates can be mathematically derived  Tasks must be able to be arranged in a defined sequence that produces a pre-defined result  Like any tool, MS Project cannot define the goal of a project, the user must do that Urban and Regional Studies Institute4

 MS Project is a strong tool that is built around the PERT and CPM basics  (See PERT/CPM blocks of instruction to review the basics if these terms are unfamiliar)  Based on same basic PERT calculations invented in 1958  Based on same basic CPM calculations invented in 1958  Incorporates use of a WBS (Task list) format invented in the 1960s Urban and Regional Studies Institute5

 A highly visual, yet checklist-intensive program  Balances visual approach (charts, graphs, etc) with logical structured approach (task and resources lists)  The most widely used PM program because:  It is fairly generic in its approach  Highly automated once configured; requires relatively low amount of user manipulation  Scalable – can be used for small to enormous projects  A cost-effective choice for casual users  Easy to use core techniques  Advanced techniques are complex, however Urban and Regional Studies Institute6

 Good step-by-step tutorial for beginners  Good searchable keyword help function  Based on data entry – once configured, user enters data and Project automatically:  Computes all times and costs  Optimistic, Pessimistic, Likely and PERT- expected  Identifies Critical Path, computes late & early start dates, slack  Computes % complete on a task and project level  Identifies areas of over-tasking of resources  Draws a wide ranges of charts and graphs specific to the project  Creates a wide range of reports specific to the project  VERY customizable to meet individual user needs Urban and Regional Studies Institute7

 Based on configuration and data entered by the user, MS Project plots Gantt Charts Urban and Regional Studies Institute8 Sample MS Project Charts and Diagrams

Urban and Regional Studies Institute9 Sample MS Project Charts and Diagrams Based on configuration and data entered by the user, MS Project plots Task Calendars Based on configuration and data entered by the user, MS Project plots Task Calendars

Urban and Regional Studies Institute10 Sample MS Project Charts and Diagrams Based on configuration and data entered by Based on configuration and data entered by the user, MS Project plots Network Diagrams

Urban and Regional Studies Institute11 Sample MS Project Charts and Diagrams Based on configuration and data entered by Based on configuration and data entered by the user, MS Project plots Resource Graphs

Urban and Regional Studies Institute12 Sample MS Project Tables and Reports Based on configuration and data entered by Based on configuration and data entered by the user, MS Project plots Tabular Data

Urban and Regional Studies Institute13 Sample MS Project Tables and Reports Based on configuration and data entered by Based on configuration and data entered by the user, MS Project plots Tabular Tracking Data

Urban and Regional Studies Institute14 MS Project Strengths Sample MS Project Tables and Reports Based on configuration and data entered by Based on configuration and data entered by the user, MS Project plots High Level Reports…

Urban and Regional Studies Institute15 MS Project Strengths Sample MS Project Tables and Reports …to-do lists on a person by person basis… …to-do lists on a person by person basis…

Urban and Regional Studies Institute16 MS Project Strengths Sample MS Project Tables and Reports …lists of tasks that should have started but have not… …lists of tasks that should have started but have not…

Urban and Regional Studies Institute17 MS Project Strengths Sample MS Project Tables and Reports …lists of tasks that are scheduled to begin soon… …lists of tasks that are scheduled to begin soon…

Urban and Regional Studies Institute18 MS Project Strengths Sample MS Project Tables and Reports …lists of critical tasks (makes it easy to identify tasks that become critical once a project is crashed)… …lists of critical tasks (makes it easy to identify tasks that become critical once a project is crashed)…

Urban and Regional Studies Institute19 MS Project Strengths Sample MS Project Tables and Reports and much, much more and much, much more All charts, diagrams, and reports are designed to help a manager organize and track a project All charts, diagrams, and reports are designed to help a manager organize and track a project All come in a standard configuration All come in a standard configuration Most typically used information Most typically used information Easiest to read format Easiest to read format All are also customizable to show the most meaningful data All are also customizable to show the most meaningful data

 Flexible and customizable  Designed to enhance communication  Between manager and workers  Between managers and stakeholder  A good tool to manage expectations  Charts, diagrams, tables etc can be saved in various formats for use:  On the web, in print, electronically Urban and Regional Studies Institute20 MS Project Strengths

 Makes it easy to lose touch with the project – very automated  Automates all calculations  Scheduled dates, costs projected dates, etc  Tracks when a resource is over-allocated but does not provide a warning when it happens  Conflicts are not intuitively displayed  Will “let” a project get over budget/over-time  A tool that must be monitored when used Urban and Regional Studies Institute21 MS Project Weaknesses

 No Risk Assessment Function  Does not calculate probability of completion  A Key weakness – this info is always requested  A Manager must compute this manually/with Excel  Crashing costs/times are not calculated  Must be computed on a task basis and then compared to the baseline (or done manually)  Assumes manual intervention by Project Manager  Crash the project manually and save as a new baseline  Project is heavily influenced by the Earned Value method (EVM)– typical Risk Assessment is not a factor in EVM Urban and Regional Studies Institute22 MS Project Weaknesses

 Much less work for a user compared to manual/MS Excel project planning  Does most of the required calculations  Wide range of graphs, charts, reports  Very customizable, very flexible  Makes communicating project status easier – expectation management Urban and Regional Studies Institute23 MS Project Benefits Review

 Very Automated – easy to lose touch  No Risk Assessment function  Must be done in MS Excel/manually  Based on PERT/CPM but also influenced by EVM  Weighs by project/task costs, not just completion  Does not consider intangible progress that is common in Social Sciences projects  Knowledge as part of the process, not just the result  Progress as part of the process not just task completion Urban and Regional Studies Institute24 MS Project Hazards Review

 Know the project goal before beginning  Know the required tasks before beginning  Identify resources before beginning  Identify task relationships before beginning  Refer to the tutorial as often as needed  Refer to help section as often as needed  Keep the configuration as simple as possible  Avoid losing touch with the project Urban and Regional Studies Institute25 Tips for Using MS Project

Urban and Regional Studies Institute26 MS Project Final Thoughts MS Project is only a tool –it does not create or “own” the project – it reflects the data provided MS Project is only a tool –it does not create or “own” the project – it reflects the data provided The simpler the configuration, the easier the data will be to understand, for all involved The simpler the configuration, the easier the data will be to understand, for all involved If the plan doesn’t look right, it probably isn’t If the plan doesn’t look right, it probably isn’t –Check resource and task assignments/relationships –Check constraints and dependencies –Look for what has changed in a plan and follow the clues - a small unintentional change can wreak havoc

 Dr. Anthony Filipovitch  MS Project, by Microsoft Corporation  MS Excel, by Microsoft Corporation  PM Body of Knowledge (PMBOK), Philadelphia: PMI, 2000  Project Management Institute (PMI) Resource Center  Project Management Institute Website Project Management Institute Website Urban and Regional Studies Institute27

You have completed URBS 609 Project Unit 1 Please proceed to URBS 609 Project Unit 2 Urban and Regional Studies Institute28 This Unit of Instruction was crafted by Robert Hugg For Minnesota State University, Mankato Urban and Regional Studies Institute