Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.

Slides:



Advertisements
Similar presentations
GPS and EGNOS in the EUR-SAM CORRIDOR
Advertisements

B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Regional RAIM Prediction System – Progress Report
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
International Civil Aviation Organization
Introduction to Navigation Specifications
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
International Civil Aviation Organization
International Flight Inspection Symposium
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
International Civil Aviation Organization
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Technology Roadmaps H. Sudarshan
H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Global Air Navigation System ~Interoperability.
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
METIS First Master Training & Seminar
FAA’s Plan for the Future Use of GPS Briefed By: Kanwaljit S. Sandhoo (MITRE/CAASD) 8th European CGSIC/IISC Meeting, Prague December 2-3, 1999.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002 PROCEDURES FOR AIR NAVIGATION SERVICES- OPERATIONS (PANS OPS ICAO DOC. 8168) Barry Billmann Federal.
Area Nav: RNP Evolution
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS Presentation GNSS 1.1 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
سیستمهای کمک ناوبری برای متخصصان اویونیک ناوبری کارائی محور.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
Satellite Based Augmentation System (SBAS): – Augmentation of navigation satellite systems (GNSS). Operational SBAS or Systems being built (beyond study):
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Extending GPS and Galileo interoperability: from frequency/signals to integrity Francisco Salabert Head of GNSS Policy Office DDAS/ EUROCONTROL.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
Basic Indoctrination Navigation 2 HOURS
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
International Civil Aviation Organization GNSS SURVEY OUTCOME Secretariat ICAO APAC Office GNSS IMPLEMENTATION SEMINAR 26 MARCH 2012.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Overview of FAA Satellite Navigation Transition and Backup Strategies Int’l Loran Association October 28, 2002.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding EGNOS System Definition and Benefits.
Space-Based Navigation Systems
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
Satellite Navigation Program
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Presentation to US Space-Based PNT Advisory Board
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
FAA NAVAID Rationalization / Resiliency Overview
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Technology Roadmaps H. Sudarshan
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA 8 MAY 2002
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Technology Roadmaps H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
International Civil Aviation Organization
Presentation transcript:

Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member of ATMCP. The complete title of the presentation is: Need for the development of performance criteria and the concept of required total system performance (RTSP): It relates directly to the topics to be addressed under agenda item 3 of the Conference, but you will easily see connections with virtually all agenda items. Performance, including safety, provides a vehicle to discuss all aspects of Air Navigation from the planning stages to the monitoring of actual service delivery.

Outline Meeting performance requirements Basic GNSS operations SBAS operations GBAS operations Implementation issues GNSS evolution

Achieving Performance Accuracy - easily achievable, demonstrated for Cat III Integrity (alert limits match operation) - achievable, demonstrated for APV - precision approach levels challenging - conservative integrity design decreases availability

Achieving Performance (cont’d) Continuity - achievable via redundancy, demonstrated Availability - achievable, high availability challenging for the most demanding operations

Basic GNSS Operations GPS and Basic GNSS receiver fault detection (RAIM) en-route and terminal RNAV RNAV non-precision approach (lateral guidance only) RAIM requires extra satellites in view need to retain ground aids and avionics RAIM prediction & NOTAMs

SBAS Operations Core satellite constellation(s), geostationary satellites, ground network, SBAS receiver SBAS receiver uses fault detection and exclusion in absence of SBAS signal High availability of integrity for en route, terminal, non-precision approach and approach with vertical guidance (APV)

SBAS Implementation SBAS status (IPs/17,32,50,58) WAAS (USA) commissioned July 2003 EGNOS (Europe), MSAS (Japan) to be commissioned 2004-2005 GAGAN (India) under development, 2005-2006 States to ensure data integrity for SBAS approaches

SBAS-based APV APV compared with non-precision approach vertical guidance = stabilized descent & integrity no need for guidance system at airport APV compared with Cat I precision approach lateral approach design identical vertical design slightly more restrictive lowest Decision Altitude 75m (250 ft) less ground infrastructure required (e.g. lighting)

Performance Comparison Horizontal & Vertical Integrity Alert Limits LNAV/VNAV (H=556m) - SBAS* or (GPS + Baro VNAV) *with V=50m APV-I (H=40m, V=50m) - SBAS APV-II (H=40m, V=20m) - SBAS [Cat I (H=40m, V=12m ) - GBAS or future SBAS]

GBAS Status & Operations Core satellite constellations, ground station at airport, VHF datalink, GBAS receiver GBAS functionality in multi-mode receiver (MMR) Precision approach capability Cat I GBAS planned for 2006 (IP/16) Cat II/III issues studied (WP/20)

Implementation Issues GNSS Manual (IP/14) provides guidance on implementation aspects Planning & Organization GNSS implementation team Procedures development design criteria & flight inspection Airspace considerations (RNAV operations)

Implementation Issues (cont’d) Aeronautical Information Services surveys (WGS-84) and database GNSS status monitoring and NOTAMs (IP/71) Certification & operational approvals system safety analysis spectrum protection (unintentional interference) avionics certification & integration

GNSS Vulnerability (WP/17) Signal interference issues good control of the electromagnetic spectrum to reduce the risk of unintentional interference intentional interference is the key concern threat analysis required for airspace concerned

Mitigation Techniques To account for likelihood and impact of outage To ensure safety and reduce economic impact (not worth interfering) Suitable combination of: integrated on board systems (inertial) pilot and ATC procedures (radar/non-radar) back-up terrestrial navaids where necessary DME to support RNAV strategically located ILS to support landing

Future operational enhancements GBAS for Cat II/III approach & surface operations Next generation satellite constellations Galileo, GPS III, GLONASS-K better resistance to interference improved performance (Cat I SBAS likely) reduced complexity of augmentations Optimum combinations of elements & signals to be established (WP/18)

Summary Basic GNSS is in widespread use SBAS is being introduced RNAV and better non-precision approaches SBAS is being introduced APV, increased availability, reduced need for ground aids GNSS evolution operational enhancements when new signals available and fleets equipped take advantage of GNSS now, monitor future developments and plan accordingly