HP Integrity PDM Implementations. Large Defense Contractor Competition: Sun, Dell $4.2 M of Integrity/ProLiant/HP 9000 server and storage solutions ChallengeSolutionResult.

Slides:



Advertisements
Similar presentations
Infrastructure Services. Introducing Al-Futtaim Technologies One of the regions leading System Integrators Strong partnerships with leading global ICT.
Advertisements

© 2009 VMware Inc. All rights reserved vCenter Site Recovery Manager 5.1.
IBM Software Group ® Integrated Server and Virtual Storage Management an IT Optimization Infrastructure Solution from IBM Small and Medium Business Software.
Proposed Storage Area Network Facilities For Discussion.
©2010 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. Speaker Name—Title Date the future.
Which server is right for you? Get in Contact with us
Protect Your Business and Simplify IT with Symantec and VMware Presenter, Title, Company Date.
1 Vladimir Knežević Microsoft Software d.o.o.. 80% Održavanje 80% Održavanje 20% New Cost Reduction Keep Business Up & Running End User Productivity End.
Violin Memory Inc. Proprietary 11 Dell Partnering Solution Examples AccountSolutionVMEM $ ValueDell Drag Database as a Service$1.5MComing Soon Splunk DB.
© 2005 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Adaptive Enterprise Business and.
UNS Energy Corp / Tucson Electric Power Case Study: Virtualization: Lower IT Costs and Improve Operations Speaker: Chris Rima, Supervisor, Infrastructure.
Virtualization: Key Tool for the final target Yiannis Koukoutsis IT Architecture Consultant Fujitsu Siemens Computers.
1 Storage Today Victor Hatridge – CIO Nashville Electric Service (615)
Tunis, Tunisia, 28 April 2014 Business Values of Virtualization Mounir Ferjani, Senior Product Manager, Huawei Technologies 2.
Adam Duffy Edina Public Schools.  The heart of virtualization is the “virtual machine” (VM), a tightly isolated software container with an operating.
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP StoreOnce How to win.
Cisco and NetApp Confidential. Distributed under non-disclosure only. Name Date FlexPod Entry-level Solution FlexPod Value, Sized Right for Smaller Workloads.
IS NEWS MICROSOFT OFFICE SHARE POINT SERVER 2007 By: Raul Rodriguez HTM 304.
Microsoft Virtual Server 2005 Product Overview Mikael Nyström – TrueSec AB MVP Windows Server – Setup/Deployment Mikael Nyström – TrueSec AB MVP Windows.
DNS Arrow Virtualisation and the business opportunity it presents. Steve Pearce Managing Director.
MICROSOFT CONFIDENTIAL Microsoft Confidential Integrated Virtualization Fireside Chat – November 3 rd, 2009 Kenon Owens Technical Product Manager Integrated.
Virtualized Hosting Business Models Mike Riolo Director of Sales – Hosting Markets May 8, 2007.
Wireless Solution Training for the (Enterprise) Carpeted Office February 2004 Tina Herrera
SharePoint Portal Server 2003 JAMES WEIMHOLT WEIDER HAO JUAN TURCIOS BILL HUERTA BRANDON BROWN JAMES WEIMHOLT INTRODUCTION OVERVIEW IMPLEMENTATION CASE.
High Availability & Oracle RAC 18 Aug 2005 John Sheaffer Platform Solution Specialist
CERN IT Department CH-1211 Genève 23 Switzerland t Next generation of virtual infrastructure with Hyper-V Michal Kwiatek, Juraj Sucik, Rafal.
Selling Consolidation’s Value. Why Consolidate? Reduce Complexity Increase Productivity Reduce TCO Improve End User Experience Improve IT Performance.
Bologna Aprile Atempo Product Suite Atempo Time Navigator™ Secure, highly scalable protection of heterogeneous data in complex, mission-critical.
Sanbolic Enabling the Always-On Enterprise Company Overview.
Exchange 2000 on Windows 2000 Data Center The Opportunity for Server Consolidation.
Cisco Confidential 1 © 2010 Cisco and/or its affiliates. All rights reserved. Data Center Solutions Marketing Data Center Business Advantage Customer Proof.
Preparing your Fabric & Apps for Windows Server 2003 End of Support Jeff Woolsey Principal Program Manager.
Presentation Content Our service catalog Remote DBA Service Proactive DBA Service Why use Citagus’ Managed Solutions Benefits Our Value Proposition.
John Sheehy e-TechServices.com, Inc. 08:00 16 Aug Session 6830 Server Consolidation: Maximizing Your Shared Resources.
1 © Copyright 2010 EMC Corporation. All rights reserved.  Consolidation  Create economies of scale through standardization  Reduce IT costs  Deliver.
Presentation To. Mission Think Dynamics is in the business of automating the management of data center resources thereby enabling senior IT executives.
VMware View built on FlexPod Flexible IT Infrastructure for Desktop Virtualization.
Adam Duffy Edina Public Schools.  Traditional server ◦ One physical server ◦ One OS ◦ All installed hardware is limited to that one server ◦ If hardware.
Selling the Storage Edition for Oracle November 2000.
Storage Trends: DoITT Enterprise Storage Gregory Neuhaus – Assistant Commissioner: Enterprise Systems Matthew Sims – Director of Critical Infrastructure.
VirtualizationAll-In-OneUpgrades Technical Consulting IntegrationSolution Manager.
E-TechServices's IT Strategy Open. Virtualize. Rationalize. A Strategy for Optimal IT Deployment.
Copyright/Privacy message 1 HP Solution Block: SAP ERP 6.0 & HP ProLiant ® SAP ERP 6.0 & HP ProLiant Multiprocessor Servers Turn up the volume on success.
Essential Capabilities The Platform You Own Choice of Solutions for your Business needs Choice of Solutions for your Business needs Preserve your.
ALIGN | INTEGRATE | TRANSFORM Database consolidation and modernisation for large Oracle database estates Executive summary.
Compete (and Complementing) VMWare Leon Booth, Solution Specialist, Microsoft Scott Gosling, Practice Lead, Data#3 Terry Burgess, vWorkspace Specialist,
© 2007 IBM Corporation IBM System Storage IBM System Storage™ 4Q07 Announcement Highlights.
HUAWEI TECHNOLOGIES CO., LTD. Huawei FusionSphere Key Messages – Virtualization, Cloud Data Center, and NFVI.
A Measured Approach to Virtualization Don Mendonsa Lawrence Livermore National Laboratory NLIT 2008 by LLNL-PRES
© 2016 Global Market Insights. All Rights Reserved Integrated Systems Market
U N C L A S S I F I E D LA-UR Leveraging VMware to implement Disaster Recovery at LANL Anil Karmel Technical Staff Member
Peter Idoine Managing Director Oracle New Zealand Limited.
Breaking free from conventional thinking about CRM Presented by: Microsoft Dynamics CRM and HP platforms Plaza Dynamics Conventional Thinking: Integrated.
Global Commercial Channels Sales Play Card Customer Challenge Windows Server 2012 feature PowerEdge 12G feature Customer Benefits “I’m unable to grow due.
Chapter 6: Securing the Cloud
The Efficient Data Center - Dell Advanced Infrastructure Manager
Organizations Are Embracing New Opportunities
What is Cloud Computing - How cloud computing help your Business?
Cloud vs. On-premise 5 Advantages of Cloud Deployment
Information Technology Virtualization Update
How to prepare for the End of License of Windows Server 2012/R2
Storage Trends: DoITT Enterprise Storage
Presented to Insert Company Name or Logo.
Cloud Consulting Services and Solutions
Note to Oracle Sales Teams
Introduction By mid-2006, the NYISO was averaging < 2% utilization across nearly 500 UNIX servers and suffering from growing power, cooling and space requirements.
Capitalize on Your Business’s Technology
PureSystems Computer Services
Presentation transcript:

HP Integrity PDM Implementations

Large Defense Contractor Competition: Sun, Dell $4.2 M of Integrity/ProLiant/HP 9000 server and storage solutions ChallengeSolutionResult Efficient use of IT for the best ROI Replacement of old PA-RISC servers Enhance collaboration between sites Siemens PLM TeamCenter Enterprise PDM, Oracle e-Business Suite High Availability and Disaster Recovery (ServiceGuard and RAC clusters and Cluster Extension EVA for Windows) Central computing power used in time- sharing by teams located around the world Integrated PDM & ERP Close partnership between HP, UGS and Oracle was a key decision criteria

Large Discrete Manufacturer Competition; IBM $6.1 M of partitioned Integrity Superdomes ChallengeSolutionResult Upgrade PA-RISC environment to faster systems with increased flexibility Inherent risks of moving complex application stack to another platform Reduce TCO Siemens TeamCenter Enterprise PDM, Oracle e-Business Suite High Availability and Disaster Recovery (ServiceGuard and RAC clusters (HPUX servers) and Cluster Extension EVA for Windows) Central computing power used in time- sharing by teams located around the world Integration of PDM and ERP Close partnership between HP, UGS and Oracle was a key decision criteria

Back-up details

Siemens PLM/HP PLM Sales Success Deal Highlights: Environment to support the Siemens TeamCenter Enterprise Product Lifecycle Management (PLM), Oracle e-Business Suite, and GOLD applications Close partnership between HP, Siemens and Oracle was a key factor High Availability and Disaster Recovery provided by extended ServiceGuard and RAC clusters (HPUX servers) and Cluster Extension EVA for Windows Solution: (12) rp3440 servers (+9 later) (6) rp4440 servers (+7 later) (1) rp8420 server (+1 later) (2) rx4640 servers (+4 later) (1) rx8620 server (+1 later) (2) rx1620 servers (7) DL580 servers (+3 later) (3) Cisco 9000 Switches (+3 later) (2) EVA 4000 Arrays (+2 later) (2) MSL6060 Tape Libraries Extended Cluster & SAN services Competitors: SUN, DELL Large Defense Contractor $4.2 M Strategic Significance: Complex PLM/ERP deal utilizing Adaptive Enterprise concepts; win over SUN and Dell

Deal Spotlight: TC PDM PA-RISC to Integrity Consolidation Success Customer Benefits Accelerate the deployment schedule – minimal application migration is required Maximize the benefits of virtualization Realize substantial operating cost savings Minimize risk exposure – no O/S change Experience manageable manpower requirements with some services included Option to enable Capacity on Demand for rapid/immediate resource provisioning in a predictable procurement time frame Take advantage of a platform for the future with an upgrade path to future Itanium processors while concurrently being able to run Montecito and PA-RISC processors in separate electrically isolated partitions. This continues the HP investment protection functionality of HP Superdomes. Solution: 2 X SuperDome 128-way (52 active) (1.6GHz/24MB CPU/SX2000) 640 GB RAM (40 x 16GB) 1 SuperDome 128-way (44 Active) (1.6GHz/24MB CPU/SX2000) 704 GB RAM (44 x 16GB) 1 SuperDome 128-way (60 active) (1.6GHz/24MB CPU/SX2000) 640 GB RAM (40 x 16GB) 7 X HP SureStore Tape Array 5300 Serviceguard & HP-UX Enterprise OE Scott Douglas CBM John Drenguis EAM Competitors: IBM Large Discrete Mfg $6.1 M Location: US Project start date: Oct month deployment Rev: TCV $6.1M over 5 yrs Strategic proposal: Replace 211 aging PA-RISC servers with new, faster, more reliable systems which provide significantly increased flexibility while protecting from the inherent risks of moving complex application stack to another platform and reducing TCO