Airport Surface Wireless Communications System Update

Slides:



Advertisements
Similar presentations
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
Advertisements

Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
FAA SATCOM Programs Briefing for
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
Aeronautical Mobile Airport Communications System (AeroMACS) Status Briefing Presentation to WG-W/4 Montreal, Canada Presented by: Brent Phillips; FAA.
Flexible Airborne Architecture
Aerospace Vehicle Systems Institute Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
©Ofcom WRC-07 Agenda item 1.5 to consider spectrum requirements and possible additional spectrum allocations for aeronautical telecommand and high bit-rate.
ESA Iris Programme: status
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
Update on Wireless Avionics Intra-Communications (WAIC) ICAO, ACP-WG-W, Montreal Marcella Ost January 22, 2010 ACP WG-W/3 IP-3.
Don Willis Federal Aviation Administration Washington, DC March 30, 2004 There are no benefits to compromising safety…only dire consequences Assessment.
International Civil Aviation Organization
Joint FAA/Eurocontrol Future Communications Study (FCS)
Direction générale de lAviation civile Ministère de l'Écologie, du Développement durable, des Transports et du Logement Direction des Services de la Navigation.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
Phillipe Renaud and Nikos Fistas
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
1 © TriaGnoSys GmbH - All rights reserved The Role of Satellites and Passenger Communications for Future Air Traffic Management Markus Werner TriaGnoSys.
Future Communications Roadmap
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Regional Preparatory Workshop for the ITU WRC-2015
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Air Traffic Management
Network Centric Operations Research Secure Mobile Networking
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
Aeronautical Mobile Airport Communications System (AeroMACS) Status Briefing Presentation to WG-M/18 Montreal, Canada Presented by: Brent Phillips; FAA.
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Federal Aviation Administration Aeronautical Mobile Airport Communications System (AeroMACS) Status Briefing ACP WG-M, Bangkok, Thailand FAA/Brent Phillips.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Presented to: By: Date: Federal Aviation Administration FY12 Infrastructure Roadmap Update Enterprise Services (Supporting Activities) NetCentric Demos/Prototypes.
Weather-in-the-Cockpit Vision
Aviation Safety Program NASA Aviation Safety Program Weather Accident Prevention Project Product Development Panel Session for User Forum Aviation Weather:
Unmanned Aircraft Systems Communications Security
Doc.: IEEE /214r1 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
1 Federal Aviation Administration November 3, 2010 FL NextGen Test Bed Overview Andras Kovacs.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Doc.: IEEE /214r0 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Glenn Research Center Networks & Architectures Branch Communications Technology 1 Will Ivancic Senior Research Engineer
Presented to: Demonstrations and Prototypes TIM By: Steve Hodges Date: 05/04/2011 Federal Aviation Administration Aircraft Access to SWIM (AAtS) FY11 planned.
NASA ARAC Meeting Update on Next Generation Air Transportation System May 3, 2005 Robert Pearce Deputy Director, Joint Planning & Development Office.
Presented to: By: Date: Federal Aviation Administration FY11 Infrastructure Roadmap Update Enterprise Services (Supporting Activities) NetCentric Demos/Prototypes.
How the NextGen Florida Test Bed could enable integration of Domestic and International Space Traffic airspace.
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
ICNS April Aeronautical Situational Awareness - Airport Surface February 10, 2016 Vladimir Linetsky, Vantage Partners, LCC Will Ivancic, NASA Glenn.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Airport Surface Wireless Communications System Update
Aeronautical Mobile Airport Communications System (AeroMACS) Status Briefing Presentation to WG-W/4 Montreal, Canada Presented by: Brent Phillips; FAA.
Aeronautical Mobile Airport Communications System (AeroMACS) Status Briefing Presentation to WG-M/18 Montreal, Canada Presented by: Brent Phillips; FAA.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
Workshop on preparations for ANConf/12 − ASBU methodology
Future Communications Infrastructure – An update
Bringing Large Commercial Airport Capabilities to Your Local Community
Joint FAA/Eurocontrol Future Communications Study (FCS)
ERAU NextGen Florida Test Bed (FTB)
Presentation transcript:

Airport Surface Wireless Communications System Update Presented to: ACP WG-M By: Brent Phillips/FAA Systems Engineering and Safety Office Date: Nov 16, 2009 Glenn Research Center Cleveland, Ohio

Outline of Topics FY05-07 Background AP17: Future Communications Study WRC-07 New Spectrum Allocations for A/G Comms FY08-09 Activities NextGen Planning with FAA and Eurocontrol coordination NAS Enterprise Architecture Communications Roadmap Project Level Agreement: Future Communications C-band Airport Surface Wireless Communications FY10+ Activities New RTCA Special Committee SC-223 Pending AP:30 Future Communications Infrastructure Research Program Status Mobile and Fixed Applications Test Bed and Hardware Implementation Next Steps 2

ICAO Endorsed Common FCS Technology Recommendations [ICAO ACP R1] Develop a new system based on the IEEE 802.16e standard operating in the C-band and supporting the airport surface environment. United States Europe Airport Oceanic/Remote Continental P34/TIA-902 LDL B-AMC AMACS Inmarsat SBB Custom Satellite IEEE 802.16e Common Shortlist A I R T R A F F I C O R G A N I Z A T I O N ato

Airport Surface Communications Highest concentration of users in NAS Air traffic control, airport operations, airline operations, safety Mobile and fixed assets Mobile access to SWIM 4

C-band Datalink Recommendations Develop airport surface system based on IEEE 802.16e standard [A1.1] Identify the portions of the IEEE standard best suited for airport surface wireless communications, identify and develop any missing functionality and propose an aviation specific standard to appropriate standardisation bodies; [A1.2] Evaluate and validate the performance of the aviation specific standard to support wireless mobile communications networks operating in the relevant airport surface environments through trials and test bed development; [A1.3] Propose a channelization methodology for allocation of safety and regularity of flight services in the band to accommodate a range of airport classes, configurations and operational requirements; [A0.4] Complete business analysis in relation to the FCI components and implementation from the perspective of the ground infrastructure and the airlines. A I R T R A F F I C O R G A N I Z A T I O N ato

2007 World Radiocommunications Conference Decision The WRC-07 approved adding an AM(R)S allocation for 5091-5150 MHz to the International Table of Frequency Allocations Removed prior limitation in so-called MLS Extension Band for “support of navigation/surveillance functions” AM(R)S designation for safety and regularity of flight applications No interference allowed with other occupants in the band: non-GEO satellite feeder links and aeronautical telemetry Protected allocation enables ICAO to develop international standards for airport mobile (i.e., wheels in contact) surface wireless communications networks that include fixed assets Ideal for airport surface wireless network with short range (~10 km or less sector coverage) and high data throughput (10s of Mb/s) The WRC-11 will consider adding an AM(R)S allocation in the 5000-5030 MHz band A I R T R A F F I C O R G A N I Z A T I O N ato

NextGen Implementation Plan 2009 Contributed to FAA planning and content of NextGen Implementation Plan Improve Collaborative Air Traffic Management New ATM Requirements: Future Communications FY09 Milestones Concepts of use, preliminary requirements, and architecture for C-band airport surface wireless communication system Test bed infrastructure to enable validation of aviation profile of IEEE 802.16e standard

NextGen Implementation Plan 2009

PLA and SAA Tasks Governing FAA Project Level Agreement G1M 02-02_SysDev_09PLA signed on 27 February 2009 Space Act Agreement (SAA3-978 Mod 1) Defined GRC’s responsibilities signed on 6 May 2009 FAA FY09 Funding ~$700k in May 2009; ~$1.4M in September 2009 ITT Task Order Task 7 L-band and C-band ConUse, Requirements Architecture, Prototypes, Test Bed Upgrade GRC Tasks FAA Planning and RTCA Support C-band Interference Assessment and Channelization Methodology Wireless Network Security Assessment NASA-CLE Test Bed Management

C-Band/L-Band Research Budget BLI FY09 FY10 FY11 FY12 FY13 FY14 1A09E C-Band $1.810M $0.815M $0.500M* $0M L-Band $0.375M $0.200M $0.200M* SatCom* N/A $0.250M* TBD Totals $2.185M $1.015M $0.950M* $1.200M* * Proposed elements of research plan for AP-30 “Future Comms Infrastructure” 10

Communications Roadmap (1 of 4) CY 2008 2009 2010 2013 2014 2012 2011 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 SWIM SWIM Segmt.1 SWIM Segmt. 2 SWIM Segmt. 3 SWIM—Core Services Telecom 214 LDRCL X RCL X 215 BWM X 102 DMN X NADIN PSN X X.25 Service Discontinued; Users transferred to FTI IP FTI-1 X 130 491 FID 74 FTI-2 ANICS FID 129 ASTI 216 NADIN MSN NMR CRD 217 IARD 496 IID 497 FID 498 Airport Wireless Communication System Note: Fixed User Ground Communications as a component of a Mobile User Communications Network Supporting Activities Airport Wireless Communications System (R&D Effort) RTCA 802.16e Aviation Standard Development

C-Band Research Description – FY09-10 Develop ConUse, requirements, and architecture for the C-Band airport surface wireless communications system Conduct supporting system analyses (e.g. high-level safety, interference, wireless security, risk assessment)  Develop detailed system designs based on IEEE 802.16 standards Establish an operational capability in NextGen CNS Test Bed to characterize the performance and conduct services demos/trials Develop test and demo plans and execute those plans to establish baseline performance as point of departure for proposed aeronautical services modifications Develop initial recommendations for joint RTCA/EUROCAE standards activities and provide support to new RTCA SC, and propose methods to validate standards in follow-on tasks Provide subtask related support to FAA-EUROCONTROL and ICAO working group meetings as required

RTCA SC for AeroMAX RTCA Program Management Council approved new Special Committee to develop an airport surface wireless communications standard Established RTCA SC-223 in July 2009 Engaged industry participation from their perspectives: Honeywell (Co-Lead) and Rockwell Collins, avionics providers ITT (Co-Lead) and Sensis, service providers Boeing, aircraft manufacturer Drafted Terms of Reference basing the proposed aviation standard on a profile of the IEEE 802.16e WiMAX standard Plan to coordinate with EUROCAE WG-82 Kickoff meeting planned for 2-3 November 2009 in DC

Pending Action Plan 30: FCI AP-30 Future Communications Infrastructure On 30 July 2009, the FAA-Eurocontrol Coordinating Committee (CCOM) approved the AP-30 “Eurocontrol/Jacky Pouzet and FAA/Brent Phillips to develop a work programme for the agreed new Action Plan to cover Communication Infrastructure that will focus on WiMAX at terminal areas. TOR and AWP2010 to be proposed at CCOM 11.” Conduct the research and technology development for the FCI based on the ICAO endorsed findings and recommendations of AP-17: Future Communications Study (FCS) FAA/Steve Bradford endorsed NASA’s co-signatory role on AP-30 as on AP-17 FAA-NASA to focus on airport surface AeroWiMAX FAA to allow Eurocontrol to lead on L-band enroute NASA-funded research on SatCom FCI for FAA is preferred

Why Airport Surface Wireless Communications? Existing airport communications infrastructure lacks flexibility and underground cabling is expensive to deploy Aging infrastructure, costly to maintain, vulnerable Existing cabling infrastructure not available at all airports Limited comms integration, lack of network connectivity Current NAS modernization and anticipated “NextGen” Air Traffic System increase demands for CNS information sharing stakeholders ASDE-X sensors, runway incursion prevention, weather & wake sensors… Controllers, pilots, airlines, ramp, de-icing, service & emergency dispatch… Wireless mobile airport surface communications network benefits: Reliable, secure integration of voice/video/data at all airport locations Enables “SWIM” networked integration of data sources and users Allows flexible, expandable, affordable deployment at airports of all sizes Reduces VHF spectrum congestion

Cable Cuts During Runway Refurbishment

Potential Airport Surface Communications Network Applications Vendor Network Vehicle Vehicle ADS - B Station Security ATCT Core WiMax Virtual ATCT Core ASR WAN LCGS WiMax Vehicle Vehicle VOR RTR/RCAG ASR ADS - B Station Wireless Cable Asset Tracking Data Services C-Band Airport Surface Communications and NASA GRC CNS Testbed Plans 17

Potential Mobile Applications ATC Comm with any aircraft (A/C-to-fixed, A/C-to-A/C) anywhere ATC comm with any vehicle in the airport movement area (runway and taxiways, but not ramp area where airlines control) Tower datalink system (TDLS) for flight clearances Loading FMS via CMU with 4D trajectories and modifications Aeronautical information services updates and graphical weather AOC and non-ATS voice and data between airlines and pilot Surface management, gate control, de-icing state GPS and AIS updates (e.g., moving maps for taxi routes) Mobile SWIM A/C access/send information (e.g. tactical Wx); Other vehicles, receive only Fire, safety, snow removal, de-icing (in movement area) Airport operations security; security video from cockpit and cabin Hazards advisories and NOTAMS

Potential Fixed Applications Sensor data collection/dissemination for situational awareness MLAT/ASDE-X ADS-B Airport Surface Radar (ASR) data Network enabled Weather Data (ASOS, LLWAS, TDWR, ITWS, icing conditions) Cable/Telco replacement/augmentation Backup/primary alternative to wired connections Extend cable loop infrastructure to remote surface assets Temporary connection of fixed assets during surface construction or service restoration

Installation Completed 9-10-09 GRC Bldg 500 CPE RU08 GRC Bldg 500 CPE RU08 Installation Completed 9-10-09 Bldg 4 BS, CPE, Backhaul RU07 Pri Hanger CPE RU01 Pri Hanger CPE RU01 Bldg 110 Core Server Backhaul Bldg 110 Core Server Backhaul CMF Bldg CPE RU06 CMF Bldg CPE RU06 Term C CPE RU02 Term C CPE RU02 ARFF BS, Backhaul RU05 ARFF BS, Backhaul RU09 Snow Barn CPE RU04 Snow Barn CPE RU04 ALSF CPE RU05 ALSF CPE RU05 Glycol Tanks CPE RU03 CPE and Backhaul Radio Antenna Pointing

Alvarion BreezeMax Extreme C-Band BTS ODUs

Alvarion BreezeMax Extreme C-Band Subscriber Station ODU .

BTS, GPS and Backhaul ODUs at B4 GPS ODU GPS ODU BTS 1-1 ODU BTS 1-2 ODU 11 GHz Backhaul ODU

Subscriber Station ODU and Enclosure on B4 Roof SS Electronics Enclosure

C-Band Research Description – FY10 Conduct supporting system analyses [e.g. high-level safety and risk assessment (ITT) and interference and wireless security (NASA)]  Develop test and demo plans and execute those plans in the NASA CNS Test Bed to establish baseline AirMAX network and channel performance as point of departure for proposed aeronautical services modifications to the IEEE 802.16e standards Develop AirMAX network and system designs based on the proposed aviation profile of the IEEE 802.16e standards Develop recommended channelization methodology and channel plans for 5091-5150 MHz allocation Develop recommendations to joint RTCA/EUROCAE standards committees and provide support to RTCA SC-223, and validate standards in the NASA-CLE CNS Test Bed

Thank You 26