ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

NJDEP MSRP Annual Report DEP-Online Registration Tutorial
METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
METAL CAN SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART KKKK June, CFR PART 63, SUBPART KKKK June, 2006.
IRON & STEEL FOUNDRY MACT COMPLIANCE ASSURANCE
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
General Monitoring Requirements and Options
Harmonization of Parts 60 and 75
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
Anne M. Inman, P.E. Air Permits Division September 11, 2012.
MON MACT Storage Tank & Transfer Racks Presenter: James Leonard November 5, 2003 ACC/SOCMA Conference New Orleans, LA.
RICE MACT and Oil Analysis
Modeling the New 1-Hour Nitrogen Dioxide (NO 2 ) and Sulfur Dioxide (SO 2 ) NAAQS Alan Dresser Research Scientist I October 14, 2011.
NSPS OOOO & Fracking Air Quality Rule Updates Oil & Gas Environmental Compliance Conference – Appalachian Basin May 13-14, 2014 Robert Keatley, PE Senior.
What’s new in RADIUS 4.0 and NJDEP Online Technology for submission.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Wes Thornhill, Chief Industrial Chemicals Section Air Division
Managing Environmental Issues with Hospital Expansion Projects Tank, Generator, and Boiler Installations from an Environmental Permitting Perspective Chris.
Boiler MACT and Other Air Developments 2011 Southern Section AWMA Conference Callaway Gardens, GA Boiler MACT and Other Air Developments 2011 Southern.
Division of Air Quality Update on EPA Boiler MACT Rules Steve Schliesser Environmental Engineer March 2012.
Blue Skies Delaware; Clean Air for Life Small Boiler Permits State of Delaware DNREC - Air Quality Management William K. Harris.
Standardized Authorizations (Permits by Rule & Standard Permits)
Used Oil Space Heaters NJDEP ACE ACADEMY May 6, 2015 Presenter: Janet Johnson 1.
Dry Cleaner Rule Update NJ Draft Rule Not Moving Forward.
Presentation to Board of Forestry November 29, 2011 Alice Edwards Division of Air Quality Alaska Department of Environmental Conservation
Sohail Ghanchi Energy Technology and Policy The University of Texas at Austin.
MICHELLE WILSON ARIZONA DEPARTMENT OF WEIGHTS AND MEASURES SEPTEMBER 17, 2013 Stage II Vapor Recovery Update.
VOC and NO x Rules Related to the Oil and Natural Gas Industries Air Quality Division Bob Gifford Air Quality Specialist, Air Quality Division Presented.
Frank Steitz Air Quality Permitting Program 10/12/2012
New Air Quality Regulation “NSPS OOOO” Oil and Natural Gas Industry Workshop October 24, 2012 Robert Keatley, PE Senior Engineer/Supervisor DEP – Division.
1 Collecting and Entering Data for Point Sources Melinda Ronca-Battista and Angelique Luedeker ITEP/TAMS Center.
Emission Statement Update & RADIUS 4.0 Danny Wong April 10, 2013 ACE Academy 1.
The Cost of Clean Air FEES REVISED: 2011 NACAA Membership Meeting Cleveland, OH October 5, 2011.
New Orleans / ACC / SOCMA November 2003 Randy McDonald, OAR, USEPA.
Our Vision – Healthy Kansans living in safe and sustainable environments.
Georgia Environmental Protection Division Stage II Gasoline Vapor Recovery Decommissioning Workshop June 11, 2014 EPD Tradeport Training Room.
NJDEP RADIUS PORTAL Bachir Bouzid April 10, 2013 ACE Academy 1.
Air Permitting Update Yogesh Doshi ACE Academy New Jersey Department of Environmental Protection.
Vandenberg Air Force Base E-85 Fueling Facility California Air Resources Board E-85 Workshop Presented by Stu S. Webster Metcalf & Eddy 02 February 2006.
| Philadelphia | Atlanta | Houston | Washington DC Boiler MACT Compliance Plans: Failure to Develop Plans Is Planning to Fail Susie Bowden|
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
E85 Fuel Dispensing at LBNL CARB E85 Workshop, February 2, 2006 Slide # 1 Berkeley Lab’s Involvement in the California Air Resources Board’s Research and.
NSPS Residential Wood Heater Recommendations WESTAR Meeting Portland, OR November 18, 2009 Lisa Rector Senior Policy Analyst
Enhanced Vapor Recovery Amendments Workshop September 9, 2002 Air Resources Board California Environmental Protection Agency.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
RECLAIM Seminar October 26, 2005 Judy B. Yorke, P.E., C.P.P. Yorke Engineering, LLC x25
Massachusetts Multi-pollutant Power Plant Regulations Sharon Weber Massachusetts Department of Environmental Protection EPA Utility MACT Working Group.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
1 Greenhouse Gas Inventories for Tribes Melinda Ronca Battista, ITEP.
Brad Miller Anna Kelley. National Ambient Air Quality Standard Update New Sulfur Dioxide Non-Attainment Area – Effective October 4, 2013 Ozone Secondary.
General Operating Permit (GOP) for Combined Heat & Power (CHP) Engines & Turbines.
Joe Stapinski Senior UST Inspector (317)
1 NEW RISK SCREENING TOOLS Joel Leon September 16, 2011.
Presented at the Fifth Annual California Unified Program Conference February 6, 2003 Enhanced Vapor Recovery Cindy Castronovo Air Resources Board Cal-EPA.
 To discuss MassDEP’s draft revisions to the following regulations:  Stage II – 310 CMR 7.24(6)  Stage I – 310 CMR 7.24(3)  Definitions – 310 CMR.
2012 Emissions Inventory Workshop 1. 2  The owner or operator of any facility that is a source of air contaminants shall submit a complete emission.
Complying with Periodic Emissions Monitoring Requirements
General Permits and General Operating Permits under construction
GENERAL PERMITS ACE ACADEMY / May 9, 2018.
Bureau of stationary sources
Air Permitting General Permit Updates
Mike Adhanom, Section Chief, Division of Air Quality
rulemaking Rule Proposed (Publication) Adoption Effective Operative
16th annual regulatory update conference November 17, 2017
Boiler Sheltered Initiative
Compliance and Enforcement Updates and other Holiday Treats
Air and Water Management Association Regulatory Conference Symposium
Presentation transcript:

ONLINE GENERAL PERMITS NJDEP October 9, 2013 ACE Academy

Two Permitting Procedures Case- by-Case Case- by-Case PCPs – Radius Application and on-line submittalPCPs – Radius Application and on-line submittal General Permits General Permits On-line RegistrationOn-line Registration

General Permits (GP) N.J.A.C. 7: “General Permits” N.J.A.C. 7: “General Permits” GP is a pre-approved permit and certificate which applies to a specific class of significant sources GP is a pre-approved permit and certificate which applies to a specific class of significant sources Fee $410 Fee $410 Valid for 5 years Valid for 5 years

CURRENTLY AVAILABLE We have 22 different General Permits available for Minor Sources and 4 General Operating Permits for Major facilities We have 22 different General Permits available for Minor Sources and 4 General Operating Permits for Major facilities

Updates in GPs New General permits available on-line: New General permits available on-line: GP-004A - Fuel Dispensing FacilitiesGP-004A - Fuel Dispensing Facilities (replacing GP-004 and GP-014) GP-009A – Boiler(s) and Heater(s) each greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr combusting gaseous fuel (replacing GP-009)GP-009A – Boiler(s) and Heater(s) each greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr combusting gaseous fuel (replacing GP-009) Under Construction: Under Construction: GP-001A – Solid Material Storage (replacing GP-001)GP-001A – Solid Material Storage (replacing GP-001)

GP-004A Fuel Dispensing Facilities 6

Applicability FD-4A-1: Marina gasoline storage tank(s) FD-4A-1: Marina gasoline storage tank(s) FD-4A-2: Airport gasoline storage tank(s) FD-4A-2: Airport gasoline storage tank(s) FD-4A-3: Fuel service station gasoline storage tank(s) equipped with Stage I (monthly facility throughput <= 10,000 gallons and commenced operation on or before 6/29/2003) FD-4A-3: Fuel service station gasoline storage tank(s) equipped with Stage I (monthly facility throughput <= 10,000 gallons and commenced operation on or before 6/29/2003) FD-4A-4: Fuel service station gasoline storage tank(s) equipped with Stage I and Stage II having an annual facility throughput of less than or equal to 9 MM gallons; OR FD-4A-4: Fuel service station gasoline storage tank(s) equipped with Stage I and Stage II having an annual facility throughput of less than or equal to 9 MM gallons; OR FD-4A-5: Fuel service station gasoline storage tank(s) equipped with Stage I and Stage II with an additional vapor recovery system control having an annual facility throughput <= 15 MM gallons. FD-4A-5: Fuel service station gasoline storage tank(s) equipped with Stage I and Stage II with an additional vapor recovery system control having an annual facility throughput <= 15 MM gallons. Note: E-85 storage tank(s) equipped with Stage I vapor control system

GP-004A Requirements for Fuel Dispensing Facilities State Requirements:State Requirements: Stage I and Stage II Vapor Recovery System Stage I and Stage II Vapor Recovery System Includes higher gasoline throughput, especially for facilities that have additional control(s); Includes higher gasoline throughput, especially for facilities that have additional control(s); Includes the use E-85 fuel; Includes the use E-85 fuel; Includes the option of testing the Pressure/Vacuum Valve annually in accordance with N.J.A.C.7: or replacing the Pressure/Vacuum Valve every two years; Includes the option of testing the Pressure/Vacuum Valve annually in accordance with N.J.A.C.7: or replacing the Pressure/Vacuum Valve every two years; Includes the option to operate a Stage II system compatible with ORVR nozzles Includes the option to operate a Stage II system compatible with ORVR nozzles

GP-004A Requirements for Fuel Dispensing Facilities Federal Requirements: Federal Requirements: MACT Federal Requirements based on the monthly gasoline throughput of each facility (see next table for requirements) MACT Federal Requirements based on the monthly gasoline throughput of each facility (see next table for requirements)

10

GP-009A Boiler(s) and Heater(s) each greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr combusting gaseous fuel 11

GP-009A Applicability A single boiler and/or indirect fired process heater with a maximum gross heat input rate greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr, or A single boiler and/or indirect fired process heater with a maximum gross heat input rate greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr, or Multiple boilers and/or indirect fired process heaters, each with a maximum gross heat input rate greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr. Multiple boilers and/or indirect fired process heaters, each with a maximum gross heat input rate greater than or equal to 10 MMBTU/hr and less than 50 MMBTU/hr. Burning the following commercial fuels Natural Gas; Propane and/or No. 2 Fuel Oil only during periods of gas curtailment

GP-009A Requirements for Boiler(s) and Heater(s) State Requirements:State Requirements: Revised Subchapter 19 ( Revised Subchapter 19 (annual adjustment, record keeping and reporting, requirements of the combustion processes in accordance with N.J.A.C. 7:27-19; Revised Subchapter 9 (Sulfur limits) Revised Subchapter 9 (Sulfur limits) Requires stack testing for boilers greater than 25 MMBTU/hr and combusting natural gas and/or propane to demonstrate compliance with SOTA limits for CO and NOx emission concentrations in lb /mmbtu

GP-009A Requirements for Boiler(s) and Heater(s) Federal Requirements:Federal Requirements: Revised NSPS ( Initial notification reports required for boilers greater than 10 MMBTU/hr in accordance with to NSPS, Subpart Dc 40 CFR 60.48c(a))

GP-001A Solid Material Storage 15

GP-001A Solid Material Storage Applicability Applicability Single Solid Material Storage Equipment equipped with a particulate control apparatus having a minimum design removal efficiency of at least 99%, orSingle Solid Material Storage Equipment equipped with a particulate control apparatus having a minimum design removal efficiency of at least 99%, or Multiple Pieces of Solid Material Storage Equipment equipped with a particulate control apparatus having a minimum design removal efficiency of at least 99%.Multiple Pieces of Solid Material Storage Equipment equipped with a particulate control apparatus having a minimum design removal efficiency of at least 99%.

GP-001A Requirements for Solid Material Storage Requirements for GP-001A: Requirements for GP-001A: Allows multiple pieces of solid material storage equipment to be registered;Allows multiple pieces of solid material storage equipment to be registered; GP-001A will have an inventory list of equipment, emission points, control devices, and emission units; andGP-001A will have an inventory list of equipment, emission points, control devices, and emission units; and Requires records of material stored.Requires records of material stored.

How To Register Online Business Portal Online Business Portal Paper (Not allowed as of January, 2010) Paper (Not allowed as of January, 2010)

Requirements for Online Business Portal Requirements for Online Business Portal Obtain Facility ID / Program Interest Number Obtain Facility ID / Program Interest Number Create a MyNewJersey Portal access account at Create a MyNewJersey Portal access account at Enter facility specific information Enter facility specific information Details on Source Operations Details on Source Operations Certify (Individual With Direct Knowledge & Responsible Official) Certify (Individual With Direct Knowledge & Responsible Official) Credit card payment, bank routing number (e-check) or Bill Me Later Credit card payment, bank routing number (e-check) or Bill Me Later

How do I obtain a General Permit? The first step is to create a "My New Jersey Account" at: The first step is to create a "My New Jersey Account" at: Once you have created the account, you will be able to log into NJDEP Online Portal and complete a general permit online. Once you have created the account, you will be able to log into NJDEP Online Portal and complete a general permit online.

General Permit Help Line (609)

22