1 WSS performance and the creation of Maluti-a-Phofung Water Presentation for Local Dialogue 15 May 2009 Maluti-a-Phofung Municipality.

Slides:



Advertisements
Similar presentations
11 Scaling Up World Bank Group Engagement with Civil Society: A Strategic Priorities Paper Civil Society Team EXTIA.
Advertisements

Good governance for water, sanitation and hygiene services
THE DEVELOPMENT BANK OF SOUTHERN AFRICA
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Communal services in Tajikistan: A poverty and social impact assessment C. Stephen Lam Almaty, Kazakhstan 13 April 2011.
Universal Coverage – Can we guarantee health for all? 3 – 4 October 2011, Kuala Lumpur Nossal perspective.
Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
“city of people, ON THE MOVE” ONE TEAM, ONE VISION.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
Capacity building for public authorities – EE7 Veronika Czako Project Adviser, EASME.
Lessons Learned for Strong Project Delivery & Reporting Sheelagh O’Reilly, Kristin Olsen IODPARC Independent Assessors for the Scottish Government IDF.
Application Summary The Tshwane Sustainable Human Settlement Strategy and Financing Plan Sub-Saharan Africa – South Africa Summary South Africa recently.
Inputs to the Budget Vote 20 Sport and Recreation South Africa Presentation to the Portfolio Committee on Sport and Recreation 01 JULY.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
AGENCE FRANCAISE DE DEVELOPPEMENT The quest for sustainability in National Development Banks Ignace MONKAM-DAVERAT Financial and Private Sector Development.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Identify the institutions which have a stake in the
REGULATION OF THE WATER SECTOR IN SOUTH AFRICA: DEALING WITH THE REALITIES OF POVERTY AND INEQUALITY Mr. Silas Mbedzi Chief Director Institutional Oversight.
Support Systems for Indigenous Primary Health Care Services Alister Thorpe, Kate Silburn #, Ian Anderson 23 March 2010 # La Trobe University.
LOCAL CAPACITY BUILDING GAPS Why Does the Local Level Matter? What Can We Do? By Eng. P. L. Ombogo, CEO (LVSWSB)
LOCAL GOVERNMENT INFRASTRUCTURE NEEDS vs DEVELOPMENT CHARGES.
Water Services Reform – the Durban experience : successes and challenges Neil Macleod Durban South Africa.
Title Consultation on the 7 th replenishment of IFAD’s resources IFAD’s operating model : overall structure and components Consultation on the 7th replenishment.
1 Delivery Mechanisms and Scoping Joint Response Team - DWAF, SALGA, NT and dplg Using Section 78.
PRESENTATION TO THE ROAD PAVEMENT FORUM 09 November 2010 Progress & Update since the Road Construction & Maintenance Summit.
Commissioning Self Analysis and Planning Exercise activity sheets.
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
African Centre for Statistics United Nations Economic Commission for Africa Addressing Data Discrepancies in MDG Monitoring: The Role of UN Regional Commissions.
Social Housing Foundation. Meeting with Housing Portfolio committee Role, purpose and mandate Strategy map Supporting housing delivery Key achievements.
Performance Stories Evaluation - A Monitoring Method to Enhance Evaluation Influence Riad Naji, Catriona King, Richard Habgood.
Case Study Findings Water Dialogues – South Africa Presentation for Local Dialogue 6 March 2009 Water Services in Bushbuckridge Local Municipality.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
Department of Labour Unemployment Insurance Fund Budget 2006/07 UIF Presentation to Portfolio Committee 13 March 2006.
INFRASTRUCTURE CSIR 2015 CONFERENCE “IDEAS THAT WORK"
Urban water supply The privatization process in Mozambique
OECD Water Programme Pillar 1, Output 1 “Pricing Water Resources and Water & Sanitation Services” World Water Week Stockholm, August 2008.
1 The creation and operation of uThukela Water (Pty) Ltd as a multi-jurisdictional service delivery partnership for water delivery A presentation of preliminary.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
‘ By Abdou Karim LO Minister of State for Reform and Technical Assistance AfCoP/MfDR Co-Chair.
Kathy Corbiere Service Delivery and Performance Commission
1 Consolidated Municipal Infrastructure (CMIP) and Municipal Infrastructure Grant (MIG) DPLG PRESENTATION TO THE PORTFOLIO COMMITTEE ON LOCAL GOVERNMENT.
“Presentation to the Joint Budget Committee IMPLICATIONS OF THE MTBPS TO THE COMPREHENSIVE INTEGRATED HUMAN SETTLEMENT PLAN FOR HOUSING DELIVERY IN THE.
By the Director-General of the Department of Provincial and Local Government (the dplg), Ms Lindiwe Msengana-Ndlela Monday, 7 May 2007 Presentation to.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
1 WATER BOARDS TARIFF INCREASES: IMPACT AND IMPLICATIONS ON LOCAL GOVERNMENT STRUCTURES BY MTHOBELI KOLISA EXECUTIVE DIRECTOR:MUNICIPAL INFRASTRUCTURE.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Comments on the 2013 DoRB Standing and Select Committees on Appropriations 6 March 2012 By Councillor Loyiso Nkosiyane (SALGA National.
1 SOUTH AFRICAN ASSOCIATION OF WATER UTILITIES PRESENTATION TO THE PARLIAMENTARY PORTFOLIO COMMITTEE OF WATER AFFAIRS AND FORESTRY ON THE IMPACTS OF THE.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION Portfolio Committee on Water Affairs and Forestry 22 June 2005 V.227.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
Models of Aggregation for Water Supply and Sanitation Provision Capacity Building Module.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Cowlitz County, WA Accounting Function Review
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION
Presentation to the Portfolio Committee on Energy
Municipal Water Infrastructure Grant (MWIG)
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
Trevor Balzer: Acting CFO Helgard Muller : CD Water Services
SALGA Comments on LG Grants Division of Revenue Bill, 2011
ASOSAI Working Group On Environmental Auditing
COMMENTS ON THE DEBT OWED BY MUNICIPALITIES TO WATER BOARDS SALGA INPUT 20 MARCH 2007 BY WILLIAM MORAKA.
ROLE AND MANDATE In terms of the National Development Agency (NDA) Act (Act No 108 of 1998 as amended), NDA was mandated to contribute towards the eradication.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Building Statistical Capacity UNSD perspective
Water Services Targets
PRESENTATION TO THE PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY
Presentation transcript:

1 WSS performance and the creation of Maluti-a-Phofung Water Presentation for Local Dialogue 15 May 2009 Maluti-a-Phofung Municipality

2 Structure of presentation Introducing the research team The objectives of the research The methodology Background and overview  Institutional entities and their roles  Institutional comparisons Key technical indicators Community perspectives Summary of major issues

3 The research team Project leader: Anne Mayher Researchers: Sibusiso Khanyile and Brand Nthako Finance research: Cobus Oosthuizen Additional analysis and editorial support: Glen Robbins

4 Objectives of the research To examine the impact of the institutional arrangements introduced to fulfill the WSS function in terms of:  Performance against key indicators  Community perspectives  Including some comparison with previous arrangements To draw on this research to inform:  Local advocacy through a Local Dialogue  Themes for the broader Water Dialogues – South Africa process with particular attention paid to institutional issues.

5 The methodology Examination of available documentation (primary and secondary sources) Interviews with key informants Community participatory workshops Sourcing of specialist financial information Expert input from Water Dialogues stakeholders Feedback sessions with local stakeholeders

6 Overview of Maluti-a-Phofung Municipality Maluti-a-Phofung is a local municipality and forms part of the Thabo Mofutsanyana District Major centres: Harrismith, Phutaditjaba, Kestell Population of (2001 census) – now estimated at % of population in former Qwa- Qwa homeland areas Economic focus on agriculture with limited industrial and tourism development Unemployment estimate at 65% Migrant employment remains important Major historical services disparities between former Qwa-Qwa areas and Harrismith/Kestell Maluti-a-Phofung is located in the south-east of the Free State Province

7 WSS institutional timeline 1994  DWAF assumes control of former QwaQwa WSS arrangements  Harrismith TLC incorporates surrounding schemes 1998  DWAF contracts Sedibeng to handle for QwaQwa scheme 1999  Harrismith explores obtaining external support in the running of its WSS arrangements 2000  Newly created Maluti-a-Phofung Municipality contracts Rand Water (Amanziwethu) to assist with management and expertise in running of the Harrismith-Intabazwe- Tshiame WSS 2001  Sedibeng contract renewed by MaP Municipality in partnership with DWAF and extended to cover Kestell area 2003  Section 78 process proposes creation of external entity, wholly owned by the MaP Municipality to handle integrated WSS for MaP areas as a whole.  Sedibeng and Amanziwethu contracts renewed on short term basis  Maluti-a-Phofung Water Pty (Ltd) created and assumes WSP role  Uzinzo (WSSA and Amanzabantu) contracted on 6 year deal to provide management and expertise to enable MaP Water to function sustainably in the future

8 Institutional background of WSP entities (I) Sedibeng ( )  Serviced former QwaQwa areas with mandate from DWAF (and funding)  Sedibeng is a public Water Board that has sought to extend its activities outside its original scope of operations to raise revenue  Scheme involved bulk and reticulation activities with a focus on Phutaditjaba and surrounding peri-urban areas  Sedibeng provided the full management of the function  Until Sedibeng assumed responsibility for Kestell it did not have a significant billing function in the area (thanks to a DWAF subsidy)

9 Institutional background of WSP entities (II) Amanziwethu ( )  An entity created by Rand Water (a public Water Board) to supply services to Harrismith TLC  Serviced Harrismith and surrounding areas through support of WSS activities of the Harrismith TLC and subsequently the MaP Municipality  Amanziwethu officials seconded to work with municipal staff around priority support areas in a “business unit”  Scheme involved mostly reticulation activities for town of Harrismith and surrounding townships  Amanziwethu sought to assist Harrismith and later MaP Municipality to raise revenue levels and quality of services

10 Institutional background of WSP entities (III) MaP Water Pty (Ltd) (and Uzinzo) ( )  A publically owned entity created to provided integrated WSS to the entire MaP area – a WSP  Entity given a mandate by its “shareholder” (MaP Municipality) with the mandate administered through the WSA function in MaP Municipality  Uzinzo consortium contracted in by MaP Water to provide management services and to build sustainable capacity within the MaP Water entity  Uzinzo a JV between two private sector entities active in the WSS sphere (WSSA and Amanzabantu Services)

11 Motivation for establishment of MaP Water According to respondents and Section 78 process the key factors informing the decision to create MaP Water Pty Ltd were that:  External providers have always been operating in the area resulting in a lack of existing internal capacity and difficulties with sourcing skilled personal to work for municipality  There was a need for an entity to house formerly separate schemes and to manage complex integration process (eg harmonisation of conditions, services)  The prospects for raising additional resources were higher outside the institutional structure of the Municipality (both debt and donor)  The institutional arrangement would allow for corporatisation with potential benefits of dedicated management and ring- fencing of assets and activities from other municipal services

12 WSP entity service comparison (I) In terms of services rendered the entities were substantially different making a direct comparison difficult.  Different policy contexts  Different funding basis  Different institutional forms  Different services and scales of operations The figures below are presented to provide an broad sense of the nature of service coverage. However, it should be noted that they also capture dynamic shifts – for example the conversion of standpipe connections to residential connections by MaP Water from the previous Sedibeng (in QwaQwa) Residential Connections 600 Communal Standpipe Access 0 Water Tanker Access 0 Unserved Residential Connections Communal Standpipe connections 1350 Water Tanker Service 3292 Unserved Residential Connections 2620 Communal Standpipe connections 0 Water Tanker Service Unserved Amanziwethu (‘00-’06)Sedibeng (’98-’06)MaP Water (’06- )

13 WSP entity service comparison (II) It is notable how under MaP Water the service arrangements have changed with a strong focus on the shift from standpipes to residential connections (QwaQwa) and the overall rise in metered connections along with a ongoing decline in the unserved.

14 WSP entity service comparison (III) Overall in, backlog terms, each successive entity has reduced total backlogs from over 1/3 of the population to less than 10% since WSA Total Water Backlog - April 1994 Total Water Backlog - Oct 2001 Total Water Backlog - April 2007 Maluti a Phofung Local Municipality - FS194140,28475,85230,970 Source: DWAF NWIS

15 WSP entity service comparison (IV) Note: This table provides a comparison of consolidated financials of Sedibeng and Amanziwethu (adjusted to 2007) against those of Map Water (2007) It highlights: (1) Increase in water sales revenue under MaP Water (2) High level of DWAF grant allocations for MaP Water (3) The losses incurred by the municipality with the previous arrangement compared to net profit generated for reinvestment in service upgrading under MaP Water (but DWAF grant driven)

16 Issues arising from technical study: Comparing the institutional arrangements On the institutional reform process (from Sedibeng & Amanziwethu to MaP Water):  Concerns were raised about the rigour of Section 78 process and related lack of public engagement On the institutional comparison (between Sedibeng, Amanziwethu and MaP Water):  Different mandates, geographic focus areas, structures and funding aside, MaP Water does appear to have successfully integrated the services with a surplus being generated for reinvestment.  However, the surplus is in large part a function of increased DWAF subsidies which are not necessarily guaranteed in the future. In terms of service comparisons (between Sedibeng, Amanziwethu and MaP Water):  Major progress has been made on backlog eradication and MaP Water has significantly raised the number of residential connections (converted from standpipes).  This process has also involved a shift to metering which was not a major priority for Sedibeng

17 Issues arising from technical study: MaP Water Pty Ltd’s performance In order to reflect on MaP Water’s performance it is critical to understand the allocation of institutional roles and responsibilities that inform what it does. An institutional “supply chain” exists in which the performance of each entity is very dependent on the performance of others. MunicipalityWSA MaP Water (Pty) Ltd Uzinzo Roles: Section 78 process Policy direction WSA approvals and oversight Billing Operating and capital Allocations Capital project Implementation (bulks) Roles: WSS planning (WSDP) WSS coordination WSS standards WSP contracting WSP oversight WSP M&E Roles: Implementation and management of WSDP Programme including Budgeting, administration, HR, strategic and technical capabilities Reticulation scheme Design, implementation & maintenance Roles: Entity establishment & consolidation (systems, Procedures, technology, knowledge transfer) Expert support Capacity building

18 Issues arising from technical study: MaP Water Pty Ltd’s performance Major issues identified included:  Municipal staff, MaP staff and Uzinzo consortium members agree they are still on a learning curve with respect to roles and responsibilities  A key challenge has been the turn-over of skills/staff at MaP Water – in particular with regard to seconded staff form the Uzinzo consortium  The effectiveness of the Municipal billing arrangements remains a concern with low priority given to recovery of water revenue form customers thereby limiting Uzinzo’s ability to secure and improved incentive in terms of operations.  The quality and responsiveness of capital programmes in the Municipality, on which MaP Water depends, needs ongoing attention.  The high DWAF subsidy level might not continue leaving a requirement for major revenue adjustments/efficiency improvements.

19 Issues arising from community workshops (I) Rationale for selection of community participatory workshop sites:  Since 84% of the population live in the former QwaQwa area and 15% live in Harrismith (the other 1% live in Kestell), 3 communities were chosen in the former QwaQwa area – Bolata, Thaba Bosiu, and Riverside - and 1 was chosen from Harrismith – namely, Intabazwe (urban township and informal settlement)

20 Issues arising from community workshops (I) Key issues identified by areas:  “Urban” QwaQwa issues were around: The introduction of metering and the impact this will have on poor consumers Quality of service (pressure and downtime) Lack of consultation/communication  Peri-urban/rural QwaQwa: Uneven access and lack of FBW Lack of access to water mains and cost of connection “Illegal” connections where residents connected themselves under circumstances where there was no provision or they could not afford connection cost  Intabazwe Reliability The introduction of metering and the impact this will have on poor consumers Use of restrictors Lack of sanitation and standpipes for informal settlement Lack of consultation and communication Weak reporting lines/accountability

21 A summary of core issues identified In terms of the institutional arrangements/model:  Oversight, monitoring, planning and policy issues are still evolving but there are apparent gaps (eg irregular mtgs and no independent review in place)  Public engagement and communication matters have remained quite marginal around WSS matters  Planning for a declining subsidy environment needs attention as does the effectiveness of revenue management by the Municipality  Building local capacity must be a focus of attention As backlogs are reduced the quality and level of services as well as their affordability needs consistent attention:  Planning, delivery and operations management must become more consultative and informed by user perspectives  Particular service delivery matters needing attention include: The roll out of metering The approach to free basic services The cost of connections and water supply Lack of standpipes in informal and peri-urban settlements Quality and responsiveness of service providers Communication and consultation must be enhanced to secure greater accountability and user voice