Background Hong Kong, China has put AIDC into operational use between HK and Sanya since Feb 2007. Standalone system use real-time data from ATM System.

Slides:



Advertisements
Similar presentations
Slide 1 FastFacts Feature Presentation February 21, 2013 To dial in, use this phone number and participant code… Phone number: Participant.
Advertisements

ELECTRONIC DATA COLLECTION SYSTEM Howard Hamilton.
Business Process Improvement in the Economic Programs Directorate at the U.S. Census Bureau Deborah M. Stempowski Shirin A. Ahmed U.S. Census Bureau ICES.
Chairmans Report - 3 rd Meeting of the CAeM Expert Team on Education and Training. ET/ET 3 Kelowna BC, Canada August 2010.
Global ATM Operational Concept
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
Presented by Jean-Yves PIRAM
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
© 2010 The MITRE Corporation. All rights reserved. AERONAUTICAL COMMUNICATIONS PANEL (ACP) THIRTEENTH MEETING OF THE WORKING GROUP I Bangkok, Thailand.
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
System of Systems (DRAFT) To be approved by the ICAO Council
Briefing on APANPIRG Priorities and Targets
09/03 Page 1 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003 FAA AMHS Implementation Plan Bangkok, Thailand November 19, 2003.
Selecting an Advanced Energy Management System May 2007 Chris Greenwell – Director Energy Markets Scott Muench - Manager Technical Sales © 2007 Tridium,
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.
Dr. Olli M. Turpeinen (C/MET/AIM)
Report ET-ODR activities World Meteorological Organization (WMO) CAeM XIV.
49 th Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, India, 8-12 October Presented by the International.
25 August 2014Page 1 Civil Military Cooperation in Enhancing operations Asia and Pacific Regional Sub-Office 2014 BEIJING, CHINA; 30 JUN-11 JUL 2014.
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Pan regional ICD for AIDC structure and status (SP/09)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
DIGITAL COMMUNICATION Packet error detection (CRC) November 2011 A.J. Han Vinck.
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Development of AIDC ICD in APAC Region
APAC SIP on ASBU B0-FICE AIDC Implementation Seminar Basic SYSCO Principles and Standard OLDI Communication EUR Environment ICAO EUR/NAT Office Celso Figueiredo.
LOA template AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
APAC PBN Seminar F.LECAT (ICAO)
AIDC Top priority in APAC Special Implementation Project AIDC Bangkok, Oct Prepared by F.Lecat 1.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
ATM Implementation Support by ICAO APAC RSO
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
AMHS WORKSHOP POLICY & DOCUMENTATION. AMHS WORKSHOP POLICY & DOCUMENTATION  Operational Requirements for facilities or services are established through.
香港民航處 Civil Aviation Department Hong Kong ICAO Second Cycle of USAP Audits Hong Kong China.
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
ATS Message Handling System (AMHS)/ System Wide Information Management (SWIM) Workshop and the Seventh Meeting of Aeronautical Telecommunication Network.
28-31 October RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS Secretariat - APAC OFFICE 28 October 2014 SIP AIDC Seminar in Bangkok SP/01.
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
Session 3 : User-Producer Dialogue H. W. FUNG Commissioner for Census and Statistics Hong Kong, China October 2006.
Viet Nam AIDC. AIDC Implementation Status HCM - AIDC – available for current ATM System Ver 1 HaNoi – AIDC - available for current ATM System Ver 3 Conduct.
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
AIDC Implementation Seminar 28th – 31st October 2014
APAC PBN Seminar F.LECAT (ICAO)
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
AIDC Top priority in APAC
Workshop on preparations for ANConf/12 − ASBU methodology
AIDC status October 2014 © Thales Australia Limited. This document and the information it contains is commercial-in-confidence and shall remain the.
RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
AIDC Implementation in Hong Kong, China
AEROTHAI AIDC Implementation Status
ALLPIRG/4 WP/33 Appendix 1.
Templ ref: PPT-ISO-colour.001 Doc Ref no:
FAA Data Communications Program System Engineering
Presentation transcript:

AIDC Implementation in Hong Kong, China APAC/NAT AIDC TF/2 - AIDC Seminar Stanley Lau Ag. Senior Electronics Engineer Civil Aviation Department Hong Kong, China 23 July 2013

Background Hong Kong, China has put AIDC into operational use between HK and Sanya since Feb 2007. Standalone system use real-time data from ATM System. Further AIDC technical tests have been conducted with other ACCs such as Guangzhou, Zhangjiang, Taibei HK and Taibei AIDC operation commenced on 16 Nov 2012. Success in reduction of ATM personnel workload and elimination of human errors arising from voice communications via Inter Area Speech Circuit (IASC).

Operation Efficiency Using subset of core messages, namely, EST, ACP, LAM, LRM as well as TOC and AOC with Sanya recently (28 Mar 2013) out of the 13 core messages as agreed with counterparts in accordance with APAC AIDC ICD and ICAO ASBU B0-25. Efficiency gained by utilizing AIDC is significant. e.g. in Dec 2012, about 29,000 transactions (HK-Sanya and HK-Taibei) were completed, representing the equivalent number of IASC calls were saved. Less than 6% of transactions reverted to voice, including missing flight plans, late/fail AFTN transmissions as well as operation needs. Expecting more extensive AIDC usage in new ATMS.

Implementation Issues Different versions of AIDC messages and Cyclic Redundancy Check (CRC) initial values (Xmodem, Kermit, 0xffff and 0x1d0f) being utilized, AIDC partners require to indicate which ICD version and CRC initial values during technical testing. LRM and error code/messages feedback from counterparts needed to be captured in the Problem Message Queue (PMQ) of the ATM System and require prompt response to the counterparts e.g. voice coordination. AFTN and subsequent ATN network with inherent network latency, circuit diversion/re-route or system maintenance of the network that will affect the timeliness of AIDC messages, which are considered as time- and mission-critical.

Main Screen of CAD AIDC system Blue = Arrival Yellow = Departure Pink = Over Flight Same colour code as the ATM system paper strip

Civil Aviation Department Hong Kong, China Dialogue Boxes for [EST] message (top left) and [ACP] message (bottom right) The AIDC system would check the incoming [EST] with the existing flight plan information. No [ACP] dialogue would be pop-up automatically if inconsistency found.

Thank You Reference: APAC ATNICG/8 – WP17 (http://www.bangkok.icao.int/cns/meeting.do?method=download&year_id=16&meeting_id=271&doc_id=3610)