INDIA AIDC IMPLEMENTATION STATUS AND ISSUES

Slides:



Advertisements
Similar presentations
RSMC New Delhi Activity Report S.R. Kalsi India Meteorological Department New Delhi.
Advertisements

Background Hong Kong, China has put AIDC into operational use between HK and Sanya since Feb Standalone system use real-time data from ATM System.
UNIVERSITY of GLASGOW A Comprehensive Approach to ATM Incorporating Autonomous Aircraft ATM Research Group University of Glasgow.
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
8th Annual Global California Conference June 23, 2011 Considerations for US Exporters Bobrick Washroom Equipment, Inc.
SEPARATE PROCEDURES AND ROUTES FOR GENERAL AVIATION
Air Traffic Management
Pan regional ICD for AIDC structure and status (SP/09)
LED LIGHTING WORKSHOP Bangalore May 16, Industry growth Growth per annum US $ 2 Billion Estimated.
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Thailand AIDC Implementation Status SIP AIDC Seminar October 2014.
..Page 1 CIMEX III – DIRECT CALL FROM LAEM CHABANG TO SRI LANKA, INDIA & MIDDLE EAST Chiwan Port Kelang Jebel Ali Xiamen Shantou Laem Chabang Colombo Nhava.
I.R.IRAN AIDC/OLDI Status
AIDC safety benefits & limitations AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
LOA template AIDC Implementation Seminar 28 th – 31 st October 2014 Adam Watkin Airservices Australia.
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
Class: 4th Standard Subject: EVS Topic: Omana’s Journey
Volunteers at CRY. Come from all walks of life Volunteers at CRY.
AIDC Top priority in APAC Special Implementation Project AIDC Bangkok, Oct Prepared by F.Lecat 1.
We would be happy to make you and your workplace cheerful and comfortable. Thank You A 360 O solution provider for World Class Modular Office Furniture.
VISUAL DISPLAYS By: Kem Okonkwo Regina Leaks. Definition Visual Display: Visualization is any technique for creating images, diagrams or animation to.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
B.PRADHAN,IAS CVO,AAI. Structure of Presentation  Background  Why need Next Gen ATS  What is Next Gen ATS  Benefits of Next Gen Systems  Conclusion.
Market Intelligence for India The Second Largest Population in the World!
Announce Strategic Partnership! 16 th July 2015.
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES Presented by Airports Authority of India SIP AIDC Seminar October 2014.
28-31 October RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS Secretariat - APAC OFFICE 28 October 2014 SIP AIDC Seminar in Bangkok SP/01.
How to Troubleshoot CD, DVD, BLU- RAY Drive issues in Windows XP of Dell XPS 720 Here are some tips to resolve issues on CD, DVD, and Blu-Ray Drive in.
1 ILA Berlin - May 2008 Marc Brochard - EEC EPATS ATM General Requirements & relative issues to be solved.
20 th Steering Committee Meeting COSCAP – South Asia Colombo 5 th – 8 th April 2011 Maldives.
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1.
Viet Nam AIDC. AIDC Implementation Status HCM - AIDC – available for current ATM System Ver 1 HaNoi – AIDC - available for current ATM System Ver 3 Conduct.
INDIAN RAILWAYS  I. Rly. Vision for Next 10 Years  Opportunities for International Partners A Presentation by – Mr. Arbind Kumar Director (Projects)
V. VSOMASUNDARAM, Board Member (Air Navigation Services), Airports Authority of India.
Service Enhancement AMHS Implementation Workshop Chennai, India 15 th – 17 th December 2008.
Rakhi.in offer special types of rakhi collection for brothers Send Rakhi to India and all its Prime city.
AIDC Implementation Seminar 28th – 31st October 2014
Airports in India Role of Airport Role Description Civil Enclave
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
Vertical, lateral separations based on time / distance
BICSI INDIA DISTRICT Conferences & Seminars 2017
INITIATIVES TAKEN BY AAI UNDER
Thailand AIDC Implementation Status
AIDC Top priority in APAC
Airtel Virtual Number Service:
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
UkSATSE aspects Andrey KVASHNIN ATC Supervisor of the LVIV ACC
AIDC status October 2014 © Thales Australia Limited. This document and the information it contains is commercial-in-confidence and shall remain the.
RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS
longitudinal separations based on time / distance
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
MUMBAI JOBS Developed by
AIDC Implementation in Hong Kong, China
INDIA AIDC IMPLEMENTATION STATUS AND ISSUES
AEROTHAI AIDC Implementation Status
EUROCONTROL SURVEILLANCE STRATEGY
Wheelchair Dealers in Kolkata Wheelchair Dealers in Kolkata.
Send rakhi in India and it’s all cities with express delivery service via Sendrakhi.comSendrakhi.com.
Giancarlo Buono Nicosia, April 13th 2018
دانشگاه شهیدرجایی تهران
Yayati Express Logistics Pvt. Ltd.
AIDC safety benefits & limitations
تعهدات مشتری در کنوانسیون بیع بین المللی
EasyTDS TDS Management Software
بسمه تعالی کارگاه ارزشیابی پیشرفت تحصیلی
Geo Units Formation Dates In India
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Free Indian Business Directory, Business Listing Site - Pinmarq List your local business for free on top business listing site in India. Find latest reviews.
Wireless MAC Multimedia Extensions Albert Banchs, Witold Pokorski
Presentation transcript:

INDIA AIDC IMPLEMENTATION STATUS AND ISSUES Presented by Airports Authority of India Mini Seminar AIDC 23rd July 2013

ATM Automation systems in India Raytheon(AT3) Delhi, Mumbai Raytheon (AT3+) Chennai Indra (Aircon2100) at 38 mid/small sized airports Indra (Aircon2100) at Kolkata – Under Installation Selex ATM System at Bengaluru and Hyderabad Kolkata(New ATM system under installation)

AIDC Status Delhi (AT3) AIDC with Mumbai (AT3) AIDC with Ahmedabad (Aircon2100) Nagpur (Aircon2100) Implemented Varanasi (Aircon2100) Mumbai (AT3) AIDC with Chennai (AT3+) Under trial operation Muscat Planned Karachi Planned (initial testing carried out) Chennai (AT3+) AIDC with Mumbai Under trial operation Bengaluru Hyderabad Planned and configured Cochin Kuala Lumpur Male(Maldives) Planned Colombo

AIDC Implementation Issues Diverse ATM systems at ATSUs Some issues in Aircon2100 (under resolution) Non display of NO, CO in radar data block. Generation of MAC msg on termination of FPL. Route terminator "T" to be configured which affects AMAN profile/trajectories of the pairing stations When the actual boundary ETO in an ABI varies from the system calculated ETO (based on the EOBT) of the overflying aircraft, the system rejects the ABI message with an LRM. SSR codes of pairing unit sometimes do not match due to limited available codes.

Challenges in AIDC Implementation Interoperability between diverse ATM Systems. Implementation and system design issues attributed to revision of AIDC ICD versions.

Suggestions HMI for AIDC functionalities may be considered to be included in AIDC Guidance Material. To avoid prohibitive cost of frequent ATM Automation systems upgrade, backward compatibility of ICD versions should be assured. AIDC messages need time bound response within a short span of time for effective operations. Therefore, higher priority than normal flight plan messages may be considered for AIDC messages.

Thanks for Kind Attention