1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.

Slides:



Advertisements
Similar presentations
Why does ERA Need to Flourish
Advertisements

2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
NERC Policies Introduction
Chapter 1 The Study of Body Function Image PowerPoint
1 Balloting/Handling Negative Votes September 11, 2006 ASTM Training Session Bob Morgan Brynn Iwanowski.
IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Role , Responsibility and achievements of SARI 145 Working Group
1 Welcome Safety Regulatory Function Handbook April 2006.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 WGISS – GEO Discussion.
The GEO Secretariat Progress Report to GEO-2 November 2003 Helen M. Wood Secretariat Director.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
Fiscal Law Project Planning Session Results December 18, 2002.
The Managing Authority –Keystone of the Control System
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
ICAO Aeronautical Communications Panel Working Group N (Networking)
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
Overview of the interoperability Regulation
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
U.S. Plans for ADS-B Briefing for
ICAO Radio Spectrum SeminarMID Office, Cairo, 4 – 6 June Implementation of ICAO Systems Prepared by Torsten Jacob ICAO ANB/CNS.
ESA Iris Programme: status
1 Multi-Function Multi-mode Digital Avionics (MMDA) NASA Glenn Research Center – End of FY05 Status Presented to ICAO ACP WGC-11 GRC/James Budinger September.
Electronic Filing of Differences(EFOD) System and Filing of Differences Task Force (FDTF) Air Navigation Bureau.
Feb 2004ICAO ACP WGF,1 WRC 2007 agenda item 1.6 Work plan for Additional aviation spectrum allocation for AM®S Presented by C. Pelmoine, EUROCONTROL.
Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
NEXCOM Next Generation Air/Ground Communications AEEC General Session December 2001 Jim Eck Air/Ground Communications Product Team Lead.
1 Discussion Item: New Satellite System Do we need (new) standards? NexSAT Steering Group 9th March 2006, Toulouse European Organisation for the Safety.
Aerospace Division Anastasia Project Airborne Communication and Navigation Satellite Technologies And Techniques in a System Integrated Approach Presentation.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CRI- Common Review Initiative Improving Accountability in the FFEL Program Through Cooperation November 17, 2003 Mike Hawkes Educational Credit Management.
CRI- Common Review Initiative Improving Accountability in the FFEL Program Through Cooperation August 27, 2003.
1 Targeted Case Management (TCM) Changes Iowa Medicaid Enterprise October 14, 2008.
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
Presentation of the proposed Annex 19 – Safety Management
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Asia Pacific Economic Cooperation Aviation Security Sub-Group Aviation Experts Group 27 th APEC TPT-WG Meeting Hanoi, Viet Nam ICAO Professional Management.
1 INAC First Nation Education Policy Framework Regional Dialogues Coordinated by AFN and INAC Education Policy Framework - Joint Steering Committee (EPF-JSC)
Training Employees 8 Human Resources Management and Supervision OH 8-1.
VOORBLAD.
SAI Performance Measurement Framework
International Civil Aviation Organization
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
Pan regional ICD for AIDC structure and status (SP/09)
African Aviation Training Organization
International Coordinating Council of Aerospace Industries Associations International Coordinating Council of Aerospace Industries Associations (ICCAIA)
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
Establishment of Space Weather Information Service
International Civil Aviation Organization
ICAO ACP Working Group M Iridium Sub Group Overview
Presentation transcript:

1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG Joint Meeting with ICAO ACP WG-C September 2006

2 Glenn Research Center ACP WGM Iridium Subgroup The Iridium Subgroup was formed in WG-M with the task to develop an implementation manual and a manual on detailed technical specifications, on the basis of the draft generic AMS(R)S SARPs that were developed by the ACP. –From Recommendation 3/2 of the ACP Working Group of the Whole ( June 2005) and in coordination between the Rapporteur of WG-M, the panel member nominated by the United States and the ACP Secretariat. Subgroup Tasks: Develop the new Iridium technical manual in a timeframe that would support the suggested applicability date of the AMS(R)S SARPs by November 2007; Create an implementation manual to provide guidance to States on commissioning the system; Identify any validation requirements associated with the Iridium technical manual and conduct appropriate validation if necessary; Establish a documentation control system to identify and manage the core documents; Coordinate with other ICAO panels as appropriate through the ICAO Secretariat; and Secure broadest participation from industry in the activities of the sub-group.

3 Glenn Research Center Five meetings of the Iridium Subgroup have occurred. The Subgroup also reported to WGM Meeting #11 Meeting overviews: ACP WGM Iridium #1 – September 2005 Reviewed existing ICAO material on AMS(R)S; Reviewed intellectual property rights and validation activities requirements; Reviewed initial version of Iridium Technical Manual. ACP WGM Iridium #2 – 1-3 November 2005 Reviewed second draft version of Iridium Technical Manual. ACP WGM Iridium Subgroup

4 Glenn Research Center Meeting overviews: ACP WGM Iridium #3 – February 2006 Reviewed relevant industry activities, AEEC, ICAO, European Standards, RTCA SC-208 activities Reviewed the ICAO position on technical manual and implementation manual content; Reviewed third draft version of Iridium Technical Manual; reviewed cross-reference of SARPs requirements vs acceptability criteria of RTCA DO-270 and DO-262; considered verification and validation requirements; Reviewed outline and initial draft of Iridium Implementation Manual ACP WGM Iridium Subgroup

5 Glenn Research Center Meeting overviews: ACP WGM Iridium #4 – May 2006 Reviewed status of AMS(R)S SARPs review process Reviewed fourth draft version of Iridium Technical Manual Reviewed second draft of Iridium Implementation Manual Interim results reported to ACP WGM #11 – 31 May – 2 June Presented Iridium Subgroup Overview Reviewed draft versions of Iridium Technical Manual and Iridium Implementation Manual WGM made two significant recommendations: Add information on Iridium availability Include more information validating Iridium ACP WGM Iridium Subgroup

6 Glenn Research Center Meeting overviews: ACP WGM Iridium #5 – August 2006 Reviewed status of AMS(R)S SARPs responses from states Reviewed combined Technical and Implementation Manual Reviewed Satcom Availability Analysis from Future Communications Study Reviewed validation requirements and approach Reviewed Iridium as ATN subnetwork for inclusion in WGN-1 activities ACP WGM Iridium Subgroup

7 Glenn Research Center Key Issues the Iridium Subgroup has addressed: Understanding and applying the new ICAO philosophy of generic or performance-based SARPs coupled with system-specific Manual(s) –SARPs provide performance requirements, rather than system technical specifications –A separate document for each specific system implementation provides technical specifications What is the required and appropriate content of Technical and Implementation manuals –Technical manual provides system technical specifications and demonstrates compliance with SARPs –Implementation manual provides guidance for system implementation ACP WGM Iridium Subgroup

8 Glenn Research Center Key Issues the Iridium Subgroup has addressed: Whether, and how, to combine the Technical and Implementation manuals into one document –Current version is now a single document, restructured to eliminate redundancy and create a more generic manual to enable flexibility for future amendments if necessary, and to provide material that can be used for other systems manuals (e.g. Inmarsat, MTSAT) How to present Iridium performance vs. SARPs requirements and what validation is required –Iridium performance is compared to SARPs requirements in a Table –Validation of Iridium performance is documented in a separate validation report How to consider Iridium as a subnetwork within an end-to-end communications network –The draft AMS(R)S SARPs cover the satellite subnetwork –End-to-end performance is considered within the ATN structure – inclusion of Iridium as a subnetwork within ATN SARPs is being considered ACP WGM Iridium Subgroup

9 Glenn Research Center Overview of Iridium Manual Contents: The Technical manual and implementation manuals have been combined into one manual. This consolidated manual contains information about aeronautical mobile satellite communications, using the Iridium Satellite Network, including applications, potential benefits, user requirements, system architecture, interoperability and technical characteristics, as well as space, ground and airborne equipment. Information on status of development and ICAO activities (institutional arrangements, spectrum availability, SARPs and networking) is also included. ACP WGM Iridium Subgroup

10 Glenn Research Center Overview of Iridium Manual Contents: Chapter 1 Introduction includes potential benefits that can be expected from the use of a satellite communication service for AMS(R)S and an overview of how the Iridium Satellite Network supports AMS(R)S) Chapter 2 Services, User requirements and Operational Chapter 3 Standardization activities Chapter 4 ICAO Activities Chapter 5 Iridium Satellite Network Chapter 6 Iridium AMS(R)S System Chapter 7 Iridium AMS(R)S Standardization Activities ACP WGM Iridium Subgroup

11 Glenn Research Center Overview of Iridium Manual Contents: Chapter 8 Comparison of AMS(R)S SARPs and Expected Iridium Performance Chapter 9 Implementation Guidance A Validation manual has been developed to provide information on how the Iridium system complies with the AMS(R)S SARPs. Each of the AMS(R)S requirements are addressed to show validation method and details of validation. ACP WGM Iridium Subgroup

12 Glenn Research Center Status of Iridium Subgroup Activities: Continue refining the Iridium Manual and complete final draft –Including validation report Work with ACP WGN Subgroup N1 to enable inclusion of Iridium as an ATN air-ground subnetwork Contribute to finalization of draft AMS(R)S SARPs Next meeting will be October 2006 (ICAO HQ) Schedule The target date for completion of the Iridium manual is to coincide with ANC meeting to adopt AMS(R)S SARPs (now tentatively May 2007) ACP WGM Iridium Subgroup