US Army Corps of Engineers BUILDING STRONG ® Hydrogeneration Optimization Team (HOT) JOC Brief George Brown, BPA Larry Haas, Corps Bent Mouritsen, Reclamation.

Slides:



Advertisements
Similar presentations
Farmer School of Business Discussion of The Acceptance and Adoption of Continuous Auditing by Internal Auditors: A Micro Analysis Douglas Havelka Farmer.
Advertisements

International Hydrographic Organization CAPACITY BUILDING (Brief) CB Strategy CB Management Further Developments.
1 Priority-Based Budgeting Performance Measurement: What’s New for FY 2008 A techie & manager training of performance measures changes for FY 2008 A techie.
Preliminary Results of Management Question Survey Jim Geiselman & Jen Bayer March 16, 2006 Pacific Northwest Aquatic Monitoring Partnership (PNAMP)
T1 ITB Status Phase 1“Proof of Concept” Field Test conducted McNary U9 Dec Although limited operating range tested, results promising Continuous.
Testing and Quality Assurance
Innovative Approaches to Mapping Local Public Health Systems Serving Aboriginal Peoples Martin Cooke, University of Waterloo Storm Russell, Métis Nation.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Quality evaluation and improvement for Internal Audit
How the Texas Project Delivery Framework Can Chart the Course for All Your Application Development TASSCC 2008 Annual Conference August 11, 2008.
CMM Level 3 KPA’s CS4320 Fall Organizational Process Focus (Goals) Software process development and improvement activities are coordinated across.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
Putting CQI Into Action Starting Early Together Allegheny County, PA (Pittsburgh) Sarah Thurston, Quality Assurance Team.
BUILDING STRONG ® Betting on the Silver Jackets in North Dakota CORPS OF ENGINEERS SHOWCASE: Interagency Silver Jackets Teams Today.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
Arizona Department of Education Superintendent John Huppenthal Mark Masterson, CIO Pamela Smith, AELAS Program Director Mark Svorinic, AZ-SLDS Program.
FOLLOW UP SITE VISIT Dr Robert Schofield Dr Arthur Brown Advisors to the Quality Assurance and Accreditation Project Republic of Egypt.
National Accountability Initiatives and Their Impact on NCCCS J. Keith Brown CCPRO Fall Conference October 18, 2010.
Committee of Practitioners ESEA Flexibility Waiver Review June 25, 2014.
Large Wind Turbines Technology Lee Jay Fingersh BLM WEATS August 31, 2010.
National Boundaries Group Update to Coordination Group Laura Waggoner, US Census Bureau and Robert Pierce, US Geological Survey, Co-Chairs March 18, 2014.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
DEVELOPING REGIONAL SERVICE PLANS: AN OVERVIEW EAST TEXAS MEETING October 6, 2005.
Java Collections An Introduction to Abstract Data Types, Data Structures, and Algorithms David A Watt and Deryck F Brown © 2001, D.A. Watt and D.F. Brown.
US Army Corps of Engineers BUILDING STRONG ® The US Committee on the Marine Transportation System and e-Navigation PIANC Annual Meeting 27 August 2012.
NEET Workgroup #3 - Residential Subgroup Snohomish County PUD November 2008.
U.S. Department of Education Mathematics and Science Partnerships: FY 2005 Summary.
Bonneville Spillway Flow Discrepancy TMT – August 4 th 2004 Laurie Ebner Hydraulic Engineering – Portland District US Army Corps of Engineers.
Getting It… Developing Interagency Core Trail Data Standards National Park Service - Bureau of Land Management - USDA Forest Service Together.
Dr. Carol Schultz Department of Doctoral Studies Angela Poole Doctoral Research Assistant
hydroAMP asset management framework
Quality Concepts within CMM and PMI G.C.Reddy
Georgia Institute of Technology CS 4320 Fall 2003.
Improving Nuclear Safety Through Operating Experience Feedback NEA/IAEA/WANO- Conference Cologne 29 – 31 May 2006 Human and Organisational Factors Including.
2014/2024 Review Columbia River Treaty Bonneville Power Administration - U.S. Army Corps of Engineers Briefing for the Central Asian Delegation January.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
UNIVERSITY OF MARYLAND CENTER FOR ADVANCED TRANSPORTATION TECHNOLOGY Organizational Maturity Prepared for the Operations Summit by Philip J. Tarnoff.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
Arizona Department of Education Superintendent John Huppenthal Mark Masterson, CIO Pamela Smith, IT Program Director September 14, 2011 ADE1.
US Army Corps of Engineers BUILDING STRONG ® Keys to a Successful AE Contract David Yankey, PE Chief, Army and Air Force Section Engineering Management.
Streamlining & Redesign of the Accreditation Process: Preliminary Discussions Donna M. Gollnick.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
Altarum Institute integrates independent research and client-centered consulting to deliver comprehensive, systems-based solutions that improve health.
US Army Corps of Engineers BUILDING STRONG ® ESTABLISHING AND RUNNING AN EFFECTIVE SILVER JACKETS TEAM F LOOD R ISK M ANAGEMENT AND S ILVER J ACKETS W.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Florida Enterprise GIS Workgroup Collaborating and sharing to empower and enhance GIS services and resources statewide Sara Wander, GISP
QUALITY MANAGEMENT PRINCIPLES. Objectives 4 Understand usefulness of CASE tools 4 Types of CASE tools 4 Data flow diagrams (DFD)
Process for Review of 6 th Plan Supply Curves June 19, 2009 Lauren Gage
Wind Turbine Power Plant. Sources ●
European Middleware Initiative (EMI) – Training Kathryn Cassidy, TCD EMI NA2.
US Army Corps of Engineers BUILDING STRONG ® Power Plant Uprate Brief Missouri River Mainstem Mid-West Board Meeting Gary Hinkle Omaha District June 2015.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Slide 1 FEDERAL ENVIRONMENTAL SYMPOSIUM (West) – 6/3/09 Implementing Energy Efficiency in Remote.
Seventeen (17) Principles of Internal Cont New Gov’t Internal Control Standards.
PRIIA 305 Technical Subcommittee Systems Engineering Processes for Passenger Equipment Acquisition and Life Cycle Support Presented at: NGEC Executive.
Preventing Corruption Within Security Forces: Cooperation with Agencies Outside of the Forces David M. Crane Office of the Inspector General US Department.
1 BPA Fish and Wildlife Division Wildlife Management Costs: An Analysis Using Pisces Data November 2006 Council Update Coeur d’Alene, Idaho.
Western States Power Corp.
Systems Analysis and Design
Cloud-Based Process Planning for CNC Code Generation
Economic Dispatch of Combined-Cycle Units
T1 OPTIMIZATION March 2006.
Check On Learning Q: What manual, regulation, or publication governs The Army Management Structure for Fiscal Year? DFAS-IN MANUAL FY DFAS-IN 37-1.
POSTPROCESSING Review analysis results and evaluate the performance
T1 ITB Status Phase 1“Proof of Concept” Field Test conducted
Employer Misclassification Predictive Analytics
Role of State Audit Bureau of Kuwait in promoting and audit of IT Security  
Six Sigma Introduction 1 1.
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Hydrogeneration Optimization Team (HOT) JOC Brief George Brown, BPA Larry Haas, Corps Bent Mouritsen, Reclamation HOT, Co-Chairs 21 May 2013

BUILDING STRONG ® HOT Long Term Direction The team will continue to pursue hydropower optimization initiatives such as:  Share knowledge, experiences, and optimization products between BPA, the COE, and the BOR.  Further develop knowledge of unit specific performance. Pursue Kaplan type turbine Gate Blade Optimization (GBO)(T1) efforts to inform and improve plant optimization (T2) by creating unit specific performance data. This will allow higher plant efficiencies.  Investigate/share stand alone optimization software to be used at smaller plants that don’t have GDACS and T2 optimization software.  Support GDACS efforts at the WVY projects and aid incorporation of T2 optimization software.  3D Cam surveys to assure proper operation of the 3D cams.  Unit and plant efficiency audits. Develop a method and routine for regularly checking unit operation vs. optimal operation.

BUILDING STRONG ® HOT FY13 Activities  CORPS GDACS team and Reclamation are working together to share the Optimization Type 2 (T2) algorithm in developing stand-alone plant optimization software for plants (Black Canyon) not on GDACS.  Preliminary GBO (Gate Blade Optimizer) analysis indicates significantly better data collection results with GBO integrated into the new digital governor software at The Dalles.  CORPS subagreement amendment for realignment of existing funding within the Power Plant Efficiency Improvement (PPEI) subagreement.

BUILDING STRONG ® HOT FY14 Plan  Prove GBO concept on one unit at The Dalles by producing new CAM table and then begin production mode by moving more GBO’s to The Dalles for data collection, unit by unit, and development of individual unit performance curves.  Follow plants with new digital governors and begin GBO at Bonneville and John Day Projects.  Annual 3D Cam operation survey to verify units are operating efficiency as intended.  HOT meeting in fall to adopt revised charter coordinated with three agencies to include Reclamation.