TRBnet for the CBM MVD-Prototype Borislav Milanović In cooperation with: J. Michel, M. Deveaux, S. Seddiki, M. Traxler, S. Youcef, C. Schrader, I. Fröhlich,

Slides:



Advertisements
Similar presentations
Supported by GSI, BMBF (06FY9099I), EU (FP7-WP26) A Prototype Readout System for the MVD of the CBM Experiment Christoph Schrader for the CBM-MVD Collaboration.
Advertisements

ESODAC Study for a new ESO Detector Array Controller.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
CHEP04 - Interlaken - Sep. 27th - Oct. 1st 2004T. M. Steinbeck for the Alice Collaboration1/20 New Experiences with the ALICE High Level Trigger Data Transport.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
K. Honscheid RT-2003 The BTeV Data Acquisition System RT-2003 May 22, 2002 Klaus Honscheid, OSU  The BTeV Challenge  The Project  Readout and Controls.
HEP UCL Cambridge University Imperial College London University of Manchester Royal Holloway, University of London University College London Matthew Warren,
Status of the Micro Vertex Detector of the CBM Experiment N. Bialas 1, N. Chon-Sen 2, G. Claus 2, C. Colledani 2, R. De Masi 2, M. Deveaux 1, D. Doering.
Institute for Nuclear Physics, University of Frankfurt C. Schrader; Sept. 2011, Mont Sainte Odile, Workshop Institute for Nuclear Physics, University of.
MAPS readout Systems Christoph Schrader Dresden
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Understanding Data Acquisition System for N- XYTER.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
1 Read out & data analysis of the MVD demonstrator S. Amar-Youcef, M. Deveaux, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S. Seddiki, T. Tischler,
Institute for Nuclear Physics, University of Frankfurt 1 A concept for the MVD-DAQ C.Schrader, S. Amar-Youcef, N. Bialas, M. Deveaux, I.Fröhlich, J. Michel,
Design and Performance of a PCI Interface with four 2 Gbit/s Serial Optical Links Stefan Haas, Markus Joos CERN Wieslaw Iwanski Henryk Niewodnicznski Institute.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Frontend of PHENIX Si pixel K. Tanida (RIKEN) FEM/DAQ meeting for PHENIX upgrade (10/24/02) Outline Overview of PHENIX Si pixel detector ALICE1 chip readout.
David Bailey University of Manchester. Overview Aim to develop a generic system –Maximise use of off-the-shelf commercial components Reduce as far as.
, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Network Architecture for the LHCb DAQ Upgrade Guoming Liu CERN, Switzerland Upgrade DAQ Miniworkshop May 27, 2013.
Frank Lemke DPG Frühjahrstagung 2010 Time synchronization and measurements of a hierarchical DAQ network DPG Conference Bonn 2010 Session: HK 70.3 University.
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
1 Network Performance Optimisation and Load Balancing Wulf Thannhaeuser.
Data Acquisition Backbone Core J. Adamczewski-Musch, N. Kurz, S. Linev GSI, Experiment Electronics, Data processing group.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
LHCb front-end electronics and its interface to the DAQ.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
Guido Haefeli CHIPP Workshop on Detector R&D Geneva, June 2008 R&D at LPHE/EPFL: SiPM and DAQ electronics.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
Modeling PANDA TDAQ system Jacek Otwinowski Krzysztof Korcyl Radoslaw Trebacz Jagiellonian University - Krakow.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
CODA Graham Heyes Computer Center Director Data Acquisition Support group leader.
Integration of the MVD Demonstrator S. Amar-Youcef, A. Büdenbender, M. Deveaux, D. Doering, J. Heuser, I. Fröhlich, J. Michel, C. Müntz, C. Schrader, S.
ROM. ROM functionalities. ROM boards has to provide data format conversion. – Event fragments, from the FE electronics, enter the ROM as serial data stream;
COMPASS DAQ Upgrade I.Konorov, A.Mann, S.Paul TU Munich M.Finger, V.Jary, T.Liska Technical University Prague April PANDA DAQ/FEE WS Игорь.
Grzegorz Korcyl - Jagiellonian University, Kraków Grzegorz Korcyl – PANDA TDAQ Workshop, Giessen April 2010.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
ROD Activities at Dresden Andreas Glatte, Andreas Meyer, Andy Kielburg-Jeka, Arno Straessner LAr Electronics Upgrade Meeting – LAr Week September 2009.
Mu3e Data Acquisition Ideas Dirk Wiedner July /5/20121Dirk Wiedner Mu3e meeting Zurich.
The trigger-less readout for the Mu3e experiment Dirk Wiedner On behalf of the Mu3e collaboration 31 March 20161Dirk Wiedner.
CHEP 2010, October 2010, Taipei, Taiwan 1 18 th International Conference on Computing in High Energy and Nuclear Physics This research project has.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
16th IEEE NPSS Real Time Conference 2009 University of Heidelberg
The Jülich Digital Readout System for PANDA Developments
Data and Control link via GbE
Modeling event building architecture for the triggerless data acquisition system for PANDA experiment at the HESR facility at FAIR/GSI Krzysztof Korcyl.
The Data Handling Hybrid
Enrico Gamberini, Giovanna Lehmann Miotto, Roland Sipos
TELL1 A common data acquisition board for LHCb
Silicon Lab Bonn Physikalisches Institut Universität Bonn
Evolution of S-LINK to PCI interfaces
HADES goes SIS-100* SIS-18 DAQ upgrade possibilities
VELO readout On detector electronics Off detector electronics to DAQ
Data Link Issues Relates to Lab 2.
SVT detector electronics
LHCb Electronics Brainstorm
New DCM, FEMDCM DCM jobs DCM upgrade path
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
TELL1 A common data acquisition board for LHCb
Presentation transcript:

TRBnet for the CBM MVD-Prototype Borislav Milanović In cooperation with: J. Michel, M. Deveaux, S. Seddiki, M. Traxler, S. Youcef, C. Schrader, I. Fröhlich, C. Müntz

Overview 1/22 Overview

2/22

HADES Specifications data channels 520 PCBs / 550 FPGAs 6 Detector Systems Au Au:  20 kHz trigger rate (10 5 collision rate)  200 particles/event  200 MByte/s – Specifications 3/22

Protocol  HADES and FAIR  DAQ  FPGA + Optical Links Network  Unified Bus  Secure Transmission TRBnet ? – Explanation 4/22

372 x 30 x 6 x 9 x 24 x 4 x 12 x 3 x 2 x 20  2 GBit/s – Network 5/22 - Jan Michel, „Status of the HADES Upgrade“ -

6/22 TRBnet Key Features

Architecture Optical Network Detector 2 Detector n Trigger System Data Processing Slow Control Detector 1... TRBnet Key Features – Architecture 7/22

Dataflow Optical Network Detector 2 Detector n Trigger System Data Processing Slow Control Detector 1... TRBnet Key Features – Dataflow 8/22 Max. 3 μs latency

TRBnet Specifications Layers Unique IDs CRC checksum addr1addr2addr3 CRC 5 x 16bit Four prioritized virtual Channels TRBnet Key Features – Specifications 9/22

TRBnet Specifications Channel 1 Trigger Data Channel 2 Event Data Channel 3 Slow Control Channel 4 Monitoring 1 Optical Link TRBnet Key Features – Channels Channel switching after each data packet 10/22

TRBnet Facts 80 bit/packet, 64 bit payload  Overhead 16 bit! Error detection  No inconsistent data through transport Secure Transfers  All boards answer each transfer Independent on underlying System/Data TRBnet reduces net-bandwidth to 63%  E.g. Optical Link 3 Gbit/s 2 Gbit/s TRBnet Key Features – Facts 11/22

12/22 MVD Requirements

MVD MVD Requirements – Geometry MAPS 13/22

Station 1 Simulation MVD Requirements – Station 1 simulation 14/22 Data Rate per Sensor [MByte/s] - Sélim Seddiki, „MVD DAQ Prototype“ - 1 prototype Au 25GeV 5  10 5 collision rate T int = 10 μs approx. 7 GByte/s

MVD Prototype MimoSIS-1 M26 high-res. inspired 3 cm 2 MVD Module: 2-sided, 0,37 between sensors: 2 x 50 µm Si, 300 µm CVD-Diam., 2 x 35 µm Glue → 350 µm Si equ, (0.37 % X0), Ø 359 µm Si equ, (0.383 % X0) 5 sensors / module 500 µm overlap of opposite sensors (pitch: ~ 20 µm) 9 cm 2 - Christian Müntz -  5  4 = = 15/22 MVD Requirements – Prototype

Comparison Main challenge:  40 Gbit/s  Self-Triggering MVD Requirements – Datarate HADESMVD 20 kHzNonstop MB/s5 GB/s (Prototype) 16/22 Trigger Particles Datarate

17/22 Evaluation and Future Actions

Scheme FPGA TRBnet HUB FPGA... => 25 optical links 2 Gbit/s effective*... Evaluation and Future Actions – Readout 40 Gbit/s *Bandwidth depends on the FPGA frequency TRBnetMVD-Prototype 18/22

Scheme 19/22 Evaluation and Future Actions – Readout FPGA TRBnet HUB FPGA TRBnet... 2 Gbit/s effective* *Bandwidth depends on the FPGA frequency => 25 optical links 40 Gbit/s MVD-Prototype 8b10b + twisted pair copper ROC

First Steps MAPS Addon Board with PEXOR Card  First TRBnet implementation for MAPS TRBnet Hubs  Datarate simulation 1 MAPS PC 20/22 Evaluation and Future Actions – First steps data

Summary TRBnet is ideally suited for the first MVD prototype simulations ▫Already implemented ▫Highly modular (written in VHDL) ▫Various configurations ▫Low latency (3 μs), decent bandwidth (63 %) ▫Extensible - new designs, larger data buffers Tested on XILINX and Lattice HADES ▫up to 100 MHz, 16bit data format First steps towards the ROC 21/22 Evaluation and Future Actions – Summary

References J. Michel, „Development of a Realtime Network Protocol for HADES and FAIR Experiments“ J. Michel, „Status of the HADES Upgrade“ I. Fröhlich, „The Readout of the CBM MVD“ M. Deveaux, „Status of the Micro Vertex Detector of the CBM Experiment“ S. Seddiki, „MVD DAQ Prototype“ 22/22 References