The European Organisation for the Safety of Air Navigation WG-I #16 Meeting SESAR 15.2.10 Security Tasks SpeakerLiviu POPESCU on behalf of Boleslaw GASZTYCH.

Slides:



Advertisements
Similar presentations
© Copyright 2006 FPT Software 1 © FPT SOFTWARE – TRAINING MATERIAL – Internal use 04e-BM/NS/HDCV/FSOFT v2/3 How to work in Fsoft project Authors: KienNT.
Advertisements

IMT-Advanced Technical Requirements Summary of status after 22 nd Meeting of WP8F.
1 Welcome Summary - First visit Delhi Integra A/S Independent consultancy company Headquarter located in Copenhagen, Denmark Working worldwide.
Overview of the Summary Plan for the First Evaluation of GEOSS Implementation Craig Larlee (Canada) M&E WG Co-Chair Joint meeting of M&E WG and ET January.
Instrument for Stability Priority 1 EU CBRN Risk Mitigation Meeting with the Heads of Regional Secretariats Brussels 15 May 2013 Adriaan Van Der Meer,
1 European Commission, DGENV.D. 3 Strategic Environmental Assessment Directive 2001/42/EC on the assessment of the effects of certain plans and programmes.
The Implementation Structure DG AGRI, October 2005
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
The Managing Authority –Keystone of the Control System
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
Information Day Call 2001/1 - Brussels 19 June Call for proposals 2001/1 HOW TO PREPARE AND PRESENT YOUR PROPOSAL Willy MAES DG INFSO/F3
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
European Union Cohesion Policy
SIP/2012/ASBU/Nairobi-WP/19
Future Communications Infrastructure – An update
PAN European Network Services (PENS)
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
Overview of the interoperability Regulation
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
ACP / WG-N meeting July 2006, Brussels Migration of Surveillance Data to IP: An overview European Organisation for the Safety of Air Navigation Dimitris.
P AIRPORT SURFACE DATALINK ICAO WG-S 3 ICAO Montreal, 09/07/2013.
ESA Iris Programme workplan of activities
ESA Iris Programme: status
System of Systems (DRAFT) To be approved by the ICAO Council
LINK update Datalink Implementation EC Regulation 29/2009
IVATF/2 Montreal, 11 th – 15 th July 2011 FOLLOW UP TO VOLCEX 11/01 AND GRIMSVÖTN European Organisation for the Safety of Air Navigation Žarko SIVČEV EUROCONTROL.
1 Study into IPS Suitability for Air-Ground ATM Communication Carsten Underbjerg, Ericsson Member of Helios Study Consortium European Organisation for.
European Organisation for the Safety of Air Navigation Helping AMHS Roll-out in Europe (HARE) SpeakerRichard Papior OrganisationEUROCONTROL Date and venueJuly.
1 CARE-ASAS Action Plan Francis Casaux CARE-ASAS Action Manager on behalf of EUROCONTROL.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
ADQ Implementation workshop Eurocontrol May 2013 Erika Billen.
EA Demonstration Study : Dissemination Forum – 8 June EAEA Framework Proposal Paolo Monaco EA Unit.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR
Objective COM11 ESSIP Plan 2013 Adriatik KOKONA DSS/EIPR
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
European Organisation for the Safety of Air Navigation ITEM 7 AGENCY BUSINESS PLANNING: Budget Process and Functional Budget Presented by the SCF Chairman.
Copyright The Info-Tech Research Group Inc. All Rights Reserved. D1-1 by James M. Dutcher Strategic IT Planning & Governance Creation H I G H.
Presentation of the proposed Annex 19 – Safety Management
Project Scope Management
Information Technology Project Management – Third Edition
SAS 70 Third Party Report on Controls Overview and Timetable Finance / Audit Committee Meeting Austin, Texas January 14, 2003/ February 18, 2003.
SAI Performance Measurement Framework
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
Mission Trajectory Step 1 From planning to deployment.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Operational requirements for ASM systems Giuseppe Acampora EUROCONTROL.
ICAO ACP WG S meeting 14th, 15th July 2014
AIM Operational Concept
The European Organisation for the Safety of Air Navigation AIRM Review Forum AIRM Status Report.
Future Challenges in Aviation Psychology
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
SESAR Single European Sky Air traffic management Research
Federal Aviation Administration Federal Aviation Administration 1 Presentation to: Name: Date: Federal Aviation Administration AMHS Security Security Sub-Group.
David Bowen Head of ATM Operations and Systems
Nigel Makins EUROCONTROL
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010 Mervyn Harris – ATM Business Development Manager.
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
ACP / WGN / SGN1 #7 th meeting March 2006 Migration of Surveillance Data to IP: An overview European Organisation for the Safety of Air Navigation Dimitris.
PAN European Network Services (PENS)
ESA Iris Programme: status
ESA Iris Programme workplan of activities
Juan Vázquez Sanz EUROCONTROL SRU
WG-I #16 Meeting SESAR Security Tasks
Future Communications Infrastructure – An update
P AIRPORT SURFACE DATALINK
Migration of Surveillance Data to IP: An overview
Presentation transcript:

The European Organisation for the Safety of Air Navigation WG-I #16 Meeting SESAR Security Tasks SpeakerLiviu POPESCU on behalf of Boleslaw GASZTYCH OrganisationEUROCONTROL Date and venueMontreal, Canada 28 – 30 January 2013

WG-I Meeting Montreal, January SESAR Project Overview Agenda Project scope Project members Tasks Activities Security - Scope and Deliverables

WG-I Meeting Montreal, January SESAR Project Overview Scope The main goal of Project is to verify and demonstrate the suitability of PENS as the IP network backbone infrastructure for ATM environment : Evaluation of suitability of end-to-end PENS performances as SWIM backbone (Tasks T01, T02 and T03) COMPLETED Establishment of a Security Policy for the SWIM backbone infrastructure (Tasks T04, T05 and T06) Verification of surveillance IP Multicast applications on PENS (Tasks T07, T08 and T09) COMPLETED Verification of VoIP for G/G and ground segment of A/G Communications on PENS (Tasks T10, T11 and T12)

WG-I Meeting Montreal, January SESAR Project Overview Project Members AENA, Spain DFS, Germany DSNA, France ENAV, Italy EUROCONTROL FREQUENTIS, Austria INDRA, Spain Selex ES, Italy

WG-I Meeting Montreal, January SESAR Project Tasks P Terrestrial Communication Infrastructure - SWIM backbone P Terrestrial Communication Infrastructure - SWIM backbone T01 T03 PENS (Lead EUROCONTROL) T01 T03 PENS (Lead EUROCONTROL) T07 T9 Multicast (Lead FREQUENTIS) T07 T9 Multicast (Lead FREQUENTIS) T01 Analysis of requirements and applications to be PENS users T01 Analysis of requirements and applications to be PENS users T02 Definition and Verification of Methodology for tests on PENS T02 Definition and Verification of Methodology for tests on PENS T03 Integration and Testing on PENS T03 Integration and Testing on PENS T04 SWIM Backbone Security Risk Assessment T04 SWIM Backbone Security Risk Assessment T05 Development of the Security System Model T05 Development of the Security System Model T06 Development of the final SWIM backbone security management documents T06 Development of the final SWIM backbone security management documents T07 Requirements Analysis and Test Scenarios Definition on IP Multicast T07 Requirements Analysis and Test Scenarios Definition on IP Multicast T08 Test Definition and Implementation in test- bed on IP multicast T08 Test Definition and Implementation in test- bed on IP multicast T09 Test IP multicast capability in PENS T09 Test IP multicast capability in PENS T10 Verification Analysis of VoIP ground network within PENS/ANSPs networks T10 Verification Analysis of VoIP ground network within PENS/ANSPs networks T11 Verification of VoIP systems within PENS (phase I) T11 Verification of VoIP systems within PENS (phase I) T12 Final Verification of VoIP systems within PENS (phase II) and WG67 deliverables refinement T12 Final Verification of VoIP systems within PENS (phase II) and WG67 deliverables refinement T04 T06 Security (Lead EUROCONTROL) T04 T06 Security (Lead EUROCONTROL) T10 T12 VoIP (Lead FREQUENTIS) T10 T12 VoIP (Lead FREQUENTIS) T13 Management (Lead INDRA) T13 Management (Lead INDRA)

WG-I Meeting Montreal, January SESAR Project Overview Activities CLOSED ACTITIVIES T001 Analysis of requirements and applications to be PENS users T002 Definition and Verification of Methodology for tests on PENS T003 Integration and Testing on PENS T004 SWIM Backbone Security Risk Assessment T007 Requirements Analysis and Test Scenarios Definition on IP Multicast T008 Test Definition and Implementation in test-bed on IP multicast T009 Test IP Multicast capability in PENS T010 Verification Analysis of VoIP ground network within PENS/ANSPs networks T011 Verification of VoIP systems within PENS - phase I Nearly completed T005 Development of the Security System Model T012 Final Verification of VoIP systems within PENS - phase II On-going activities T006 Development of the final SWIM backbone security management documents

WG-I Meeting Montreal, January Security Tasks Deliverables T04 SWIM Backbone Security Risk Assessment D04 – Security Risk Assessment (SRA) For FMTP, AMHS, VoIP, LARA & Network Elements T05 Security System Specification D05 - Development of Security System Model Identify security mechanisms and develop model D05 - Security System Model Testing Develop vulnerability tests and Test Bed tools Perform tests including civil/military interoperability T06 SWIM Backbone Security Management D06 - Final security management documents Final Security Risk Assessment & Security Model

WG-I Meeting Montreal, January Security Tasks Security Task Relationship T05 - Dev. of System Security Model T05 - System Security Model Testing T06 – SWIM Backbone Security Mgmt Final D06 / documents PSSGSJU Other SESAR projects D04 (SRA) ATM Security Methodology T04 – Security System Assessment D05

The European Organisation for the Safety of Air Navigation D04 – Security Risk Assessment (SRA) WG-I Meeting

WG-I Meeting Montreal, January Security Tasks D04 – Scope of Assessment Network Elements SRA FMTPAMHSVoIP Draft Delivered to PSSG Final version to SJU in July 2012 Military LARA Existing Security Docs ATM Security Methodology

WG-I Meeting Montreal, January Security Tasks SRA Contents SRA covers FMTP, AMHS, VoIP, LARA and SESAR VPN (Network Elements) For each of the above: System description Assumptions Key risks Security goals / description / sources of attacks / impact Risk assessment Identification of management options

The European Organisation for the Safety of Air Navigation D05 Development of Security System Model & Testing WG-I Meeting

WG-I Meeting Montreal, January Security Tasks Deliverables T04 SWIM Backbone Security Risk Assessment D04 – Security Risk Assessment (SRA) For FMTP, AMHS, VoIP, LARA & Network Elements T05 Security System Specification D05 - Development of Security System Model Identify security mechanisms and develop model D05 - Security System Model Testing Develop vulnerability tests and Test Bed tools Perform tests including civil/military interoperability T06 SWIM Backbone Security Management D06 - Final security management documents Final Security Risk Assessment & Security Model

WG-I Meeting Montreal, January Security Tasks T05 Security Model INTRA DOMAIN INTER DOMAIN PENS Local Network CE FW LOCAL ROUTER AMHS Local Network FMTP VOIP APPL AMHS FMTP VOIP APPL ANSPs SECURITY CONTROLS SITA SECURITY CONTROLS End-to-end SECURITY CONTROLS

WG-I Meeting Montreal, January Security Tasks D05: Identification of security mechanisms and development and testing of the Security Model D05 Part A provides additional security mechanisms (controls) that need to be implemented over and above those recommended by the SESAR WP D04 D05 Part B contains Vulnerability Test specifications, including a detailed description of the test scope and constraints. Summary of key findings, which provides strategic advice in a clear and concise form, documenting the security posture observed during tests.

The European Organisation for the Safety of Air Navigation D06 SWIM Backbone Security Management WG-I Meeting

WG-I Meeting Montreal, January Security Tasks D06 : SWIM Backbone Security Management T06 will Integrate results form the Security Risk Assessment of the SWIM performed by the SESAR project Assess and summarize the findings and recommendations from D04 and D05 D06 will describe the work carried out in the project related to the establishment of a security policy, procedures and architectures for the SWIM Backbone

The European Organisation for the Safety of Air Navigation WG-I Meeting Security Tasks This presentation is created by EUROCONTROL and is based on ©SESAR JOINT UNDERTAKING material developed within the frame of the SESAR Programme, co-financed by the EU and EUROCONTROL. The opinions expressed herein reflect the authors view only. The SESAR Joint Undertaking is not liable for the use of any of the information included herein. Reprint of information included herein with approval of publisher and with reference to source code only