Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.

Slides:



Advertisements
Similar presentations
Normal Operations Data: Air Traffic Facility Evaluations and NOSS
Advertisements

SIP/2012/ASBU/Nairobi-WP/19
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 14th MEETING OF WORKING.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Federal Aviation Administration Required Communication Performance (RCP) Date:26-30 March 2007 Presented to:ICAO Worldwide Symposium on Performance of.
Overview of the interoperability Regulation
U.S. Plans for ADS-B Briefing for
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
EUROCAE WG82: Airport Data Link System ACP WGW3 IP 8 Montreal, January 2010.
Don Willis Federal Aviation Administration Washington, DC March 30, 2004 There are no benefits to compromising safety…only dire consequences Assessment.
International Civil Aviation Organization
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
LINK2000+ Status Søren Dissing
NextGen and Its Impact on Performance Worldwide Symposium on Performance of the Air Navigation System ICAO Montreal, Quebec, Canada March 26-30, 2007 Victoria.
Air / Ground Communications in Europe
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Data Communications Program
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization
SC-214 / WG-78 Mgt Meeting Nov 2010 Rockville, MD – Lockheed Martin.
Mission Trajectory Step 1 From planning to deployment.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Presented to: Network Centric Demonstrations and Prototypes Technical Interchange By: Deborah Young Date: November 4, 2009.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Federal Aviation Administration Next Generation Air Transportation System (NextGen) Briefing to COMSTAC Kelvin Coleman May 16, 2008.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
FAA NAS Enterprise Architecture – Informing Future Challenges in V&V for NextGen 2009 V&V Summit November, 2009.
Data Link Communications
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Federal Aviation Administration System Wide Information Management Segment 2 JRC Progress Presented to: Demonstrations and Prototypes TIM 5 Presented by:
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT En Route Services Survey Results A Review 5/8/2013.
Presented to:GMU System-Wide Modeling Workshop By: Joseph Post, ATO NextGen & Ops Planning Date: 10 December 2008 Federal Aviation Administration FAA System-Wide.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
International Civil Aviation Organization
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
NextGen and Its Impact on Performance
International Civil Aviation Organization
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
International Civil Aviation Organization
Ground System implication for ASAS implementation
Data Communications Program
IBAC – CNS/ATM Datalink Briefing
15-19 Nov 2010 Rockville, MD – Lockheed Martin
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
International Civil Aviation Organization
Presentation transcript:

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING GROUP M Montreal, Canada 18 – 21 November 2008 Data Communications Program Status (Presented by: Peter Muraca) SUMMARY This information paper is intended to provide status of on going activities within the FAA for the implementation of the Data Communications Program. ACP-WGM13/IP November 2008 Agenda Item: 1(a)

Data Communications Program – Status ICAO ACP WG-M #13 2 Topics Program Update Current Program Activities –Avionics Standards Development –Air-Ground Communications System Acquisition –Specifications Development Next Steps (towards Final Investment Analysis) –Economic Analysis –SIR Development –Equipage Strategy –Prototype and Test –Implementation Strategy Planning

Data Communications Program – Status ICAO ACP WG-M #13 3 Successfully completed Initial Investment Decision – July 2008 Entering Final Investment Analysis phase Program Update

Data Communications Program – Status ICAO ACP WG-M # WP1 + WP2 WP1 Draft WP2 Draft Standards Publication SC-214/WG78 Scope WP1 ED-120/DO290 Services D-TAXI D-OTIS WP2 D-FLUP 4DTRAD FLIPINT CPDLC for ATSA-ITP SC-214/WG-78 Standards Development

Data Communications Program – Status ICAO ACP WG-M #13 5 Air / Ground Communications System Acquisition Conducted bilateral meetings with potential vendors throughout Summer 2008 Released Request for Comment 30 Oct 08 –Summarizes FAA's Data Communications operation environment –Continue to communicate with industry on the details of the service acquisition Developing draft acquisition strategy paper to be released to industry for comment –The exact scope of the service and contract are still under development

Data Communications Program – Status ICAO ACP WG-M #13 6 Specifications Development Specifications development activities –En Route SSD –Tower SSD –Communications Service Provider SSD –Infrastructure SSD –Maintenance, Monitoring and Control CONOPs/SSD

Data Communications Program – Status ICAO ACP WG-M #13 7 Final Investment Analysis – Activities Economic Analysis –Cost estimation development for software development, hardware procurement, air-ground network acquisition, equipage incentivization, etc. –Develop understanding of system benefits to include operational scenarios SIR Development –Create acquisition documents for air-ground network –Release of Request for Proposal to industry –Proposal evaluation

Data Communications Program – Status ICAO ACP WG-M #13 8 Final Investment Analysis – Activities ( cont.) Equipage Strategy –Incentivization strategy –Avionics targets –Rulemaking strategy Coordination with overall NextGen rulemaking plan Prototype and Test –Services Validation –Security, HF –Aircraft / Flight test capabilities –Interoperability –Communication Infrastructure –Demonstrations –Foundation for formal T&E process Implementation Strategy Planning –Target ARTCCs to maximize benefit –Early stages – roll out plan / trade space analysis

Data Communications Program – Status ICAO ACP WG-M #13 9 BACK-UP

Data Communications Program – Status ICAO ACP WG-M # Initial Investment Decision Final investment Decision Major Milestones Near Term Activities Tower En Route TRACON 20 Deployment Complete Equipage/ Airspace Requirements Complete Service Level Agreements Complete Safety Assessments Complete Initial Requirement Documents Complete Initial Cost Benefit Analysis Develop Initial Equipage Strategy Complete JRC 2A, Initial Investment Decision - Develop and Release SIR - Receive and Evaluate proposals - Develop Interface Requirements - Mid-term Human Factors and Standards - Finalize Business Case Analyses - Complete JRC 2B, Final Investment Decision - Contract Awards Investment Analysis Readiness Decision Key Sites: Program Timeline

Data Communications Program – Status ICAO ACP WG-M #13 11 ControllerFlight Crew 1.0 Ground User Interface (GUI) 2.0 Ground Data Processing (GDP) 3.0 Ground Message Delivery (GMD) 4.0 Air- Ground Message Delivery (AGMD) 5.0 Airborne Message Delivery (AMD) 6.0 Airborne Data Processing (ADP) 7.0 Airborne User Interface (AUI) FAA System Scope Program Scope User System Scope FAA System Scope –Program funds enhancements required to perform data communications in: Ground User Interface (e.g. ERAM/DSR display software) Ground Data Processing (e.g. application software to create clearances) Ground Data Delivery (e.g. wide area networking between ground facilities) Ground components of A/G Message Delivery (e.g. radio, ground antenna) User System Scope –Users fund enhancements required to perform data communications in: Airborne components of A/G Message Delivery (e.g. aircraft radio, antenna) Airborne Message Delivery (e.g. aircraft networking) Airborne Data Processing (e.g. app s/w in comm & flight management units) Airborne User Interface (e.g. cockpit displays & s/w) System Scope

Data Communications Program – Status ICAO ACP WG-M #13 12 Data Comm Capabilities – Globally Harmonized Original;/Revised Departure Clearances, D-ATIS Widespread Delegated Separation = Merging & Spacing (M&S), Crossing and Passing (C&P), In-Trail Procedures (ITP), Paired Approaches (PAIRAPP) Widespread 4-D Agreements Red = Terminal Function Black = En Route Function Purple = Cross Domain Function Operational Capabilities DC In Tower DC In En Route DC In TRACON Conformance Management Initial Trajectory Based Ops Operational Terminal Info Service NAS Status / Delays / Constraints / Sequencing & Hazardous WX TRACON Data Comm Including Routine Clearances, Comm Mgmt, 4-D TAP/CDA & Time Based Metering Initial 4-D = Tailored Arrival Procedures (TAP) / Continuous Descent Approaches (CDA) to OEP Airports Clearances Comm Mgmt TFM Reroutes Time Based Metering Rule Existing Aircraft Capabilities (FANS 1/A+, ATN CPDLC, … SC214 Equipage Avionics Available Aircraft Equipage Avionics Standards Segment 1 Segment 2 Segment 3 Conformance Management Complex Clearances Widespread M&S / C&P / ITP / PAIRAPP Widespread 4-D Agreements NextLink / SESAR Forward Fit RuleA/C Retrofit Rule All Europe Ground System Taxi-Out & In; Terminal Info European Deployment Comm Mgmt ATC Microphone Check LINK 2K+SESAR TAP/CDAs Implementation Package 1 Initial TAP/CDAs Implementation Package 3Implementation Package 2 En Route ATC Clearances