NASA A/G Communications Technology Assessment Study First Order Analysis of Required Bandwidth for the Next-Generation Aeronautical Data Link March 14,

Slides:



Advertisements
Similar presentations
Investigation framework for L-band FCS EMC compatibility analysis
Advertisements

EE:450 – Computer Networks
Cognitive Radio Communications and Networks: Principles and Practice By A. M. Wyglinski, M. Nekovee, Y. T. Hou (Elsevier, December 2009) 1 Chapter 12 Cross-Layer.
1. Introduction.
Wireless Networks Should Spread Spectrum On Demand Ramki Gummadi (MIT) Joint work with Hari Balakrishnan.
Fostering worldwide interoperabilityGeneva, July 2009 IEEE IP over Broadband Access in Support of Convergence Dr. W. Charlton Adams, President, IEEE.
Flexible Airborne Architecture
Don Willis Federal Aviation Administration Washington, DC March 30, 2004 There are no benefits to compromising safety…only dire consequences Assessment.
1 Proposal for methodology to estimate spectrum requirements for AMS(R)S satellite systems under AI 1.7 (WRC-11) Presentation at the ACP/WGF 19 th meeting.
Phillipe Renaud and Nikos Fistas
Future Communications Roadmap
© 2010 The MITRE Corporation. All Rights Reserved. Sector Capacity Prediction for Traffic Flow Management Lixia Song April 13 th, 2010.
SIMS-201 The Telephone System Wired and Wireless.
(Data and Signals - cont)
Regional Preparatory Workshop for the ITU WRC-2015
Florida Institute of technologies ECE 5221 Personal Communication Systems Prepared by: Dr. Ivica Kostanic Lecture 15: Capacity of CDMA systems Spring 2011.
Copyright © Chang Gung University. Permission required for reproduction or display. On Femto Deployment Architecture and Macrocell Offloading Benefits.
Communications Research Centre (CRC) Defence R&D Canada – Ottawa 1 Properties of Mobile Tactical Radio Networks on VHF Bands Li Li & Phil Vigneron Communications.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Status of ITU-R Work On Agenda Item 1.6 M. Biggs.
Optimization of Radio resources Krishna Chaitanya Kokatla.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
CELLULAR COMMUNICATIONS. LTE Data Rate Requirements And Targets to LTE  reduced delays, in terms of both connection establishment and transmission.
Technical Guide For Mesh AP – MAP-3120 What’s the difference between Mesh Bridge and AP WDS Bridge?
4/11/20151 Mobile Computing COE 446 Wireless Multiple Access Tarek Sheltami KFUPM CCSE COE Principles.
VSMC MIMO: A Spectral Efficient Scheme for Cooperative Relay in Cognitive Radio Networks 1.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Florida Institute of technologies ECE 5221 Personal Communication Systems Prepared by: Dr. Ivica Kostanic Lecture 7: Example of link budgets and coverage.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
College of Engineering Optimal Access Point Selection and Channel Assignment in IEEE Networks Sangtae Park Advisor: Dr. Robert Akl Department of.
Department of Electronic Engineering City University of Hong Kong EE3900 Computer Networks Data Transmission Slide 1 Continuous & Discrete Signals.
Modeling OFDM Radio Channel Sachin Adlakha EE206A Spring 2001.
1 Cross-Layer Design for Wireless Communication Networks Ness B. Shroff Center for Wireless Systems and Applications (CWSA) School of Electrical and Computer.
EL 675 UHF Propagation for Modern Wireless Systems Henry L. Bertoni Polytechnic University.
Adaptive Self-Configuring Sensor Network Topologies ns-2 simulation & performance analysis Zhenghua Fu Ben Greenstein Petros Zerfos.
Radio Networks Design & Frequency Planning Software Application area: 1. Radio network frequency planning and system design, system EMC simulation/modeling.
Radio Communication SL – Option F.1. Radio communication includes any form of communication that uses radio (EM) waves to transfer information –TV, mobile.
Autumn2004 © University of Surrey SatComms A - part 4 - B G Evans 4.1 Satellite Communications A Part 4 Access Schemes in Satellite Networks -Professor.
College of Engineering WiFi and WCDMA Network Design Robert Akl, D.Sc. Department of Computer Science and Engineering Robert Akl, D.Sc. Department of Computer.
Meteorological Spectrum Issues- Outcome of the 2003 World Radiocommunication Conference Presented By: David Franc National Weather Service December 2,
Copyright: S.Krishnamurthy, UCR Power Controlled Medium Access Control in Wireless Networks – The story continues.
Airborne RLAN and Weather Radar Interference Studies at C Band Paul Joe 1, Frank Whetten 2, John Scott 1 and Dennis Whetten 2 1 Environment Canada 2 The.
ENERGY-EFFICIENT FORWARDING STRATEGIES FOR GEOGRAPHIC ROUTING in LOSSY WIRELESS SENSOR NETWORKS Presented by Prasad D. Karnik.
Evaluation Criteria and Traffic Models Update Farooq Khan IEEE Plenary Meeting Orlando, FL, USA March 15-19, 2004.
MASNET GroupXiuzhen ChengFeb 8, 2006 Terms and Concepts Behind Wireless Communications.
k Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Preliminary Proposal.
WIDEBAND CODE DIVISION MULTIPLE ACCESS & THE CAPACITY IN CODE DIVISION MULTIPLE ACCESS Presented by Maheshwarnath Behary Assisted by Vishwanee Raghoonundun.
Designing for High Density Wireless LANs Last Update Copyright Kenneth M. Chipps Ph.D.
Adaphed from Rappaport’s Chapter 5
ECE 4710: Lecture #2 1 Frequency  Communication systems often use atmosphere for transmission  “Wireless”  Time-varying Electro-Magnetic (EM) Wave 
Unit III Bandwidth Utilization: Multiplexing and Spectrum Spreading In practical life the bandwidth available of links is limited. The proper utilization.
Amplitude/Phase Modulation
Pertemuan 4 Bandwidth.
CDMA X EV-DO by S.Vidhya. CDMA 2000 CDMA2000 (also known as C2K or IMT Multi ‑ Carrier (IMT ‑ MC)) is a family of 3G[1] mobile technology standards,
Doc.: IEEE /1057r0 Submission Multiple Resource Unit Allocation for TGax OFDMA Sept 2015 Slide 1 Date: Authors: Kome Oteri (InterDigital)
Impacts of Carrier Wavelength and Physical Environment on Coverage of ORBCOMM LMSS with Different Antenna Radiation Patterns Steven J. Ma,Dr. Dave Michelson.
1 Spectrum Co-existence of IEEE b and a Networks using the CSCC Etiquette Protocol Xiangpeng Jing and Dipankar Raychaudhuri, WINLAB Rutgers.
Unit 4 Cellular Telephony
Fundamentals of Cellular Networks (Part III)
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
VDL 2 capacity simulations
SPECTRUM REQUIREMENTS FOR FUTURE AERONAUTICAL MOBILE (ROUTE) SYSTEM - AM (R )S ( Presented by Christian Pelmoine /Dale Stacey, Eurocontrol.
Evaluation Model for LTE-Advanced
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
5G Micro Cell Deployment in Coexistence with Fixed Service
Presented by Mohamad Haidar, Ph.D. May 13, 2009 Moncton, NB, Canada
Communications Operating Concept & Requirements (COCR)
VDL 2 capacity simulations
Presentation transcript:

NASA A/G Communications Technology Assessment Study First Order Analysis of Required Bandwidth for the Next-Generation Aeronautical Data Link March 14, 2006

2 Background The Draft ICAO position for the World Radiocommunication Conference 2007 requests additional allocations for mobile route communications –These additional allocations could enable, among other things, provisioning of a next-generation aeronautical communications system, specifically designed for data communications –Eurocontrol and the FAA, with the support of NASA, have entered into a bilateral study to determine the user requirements for, the technical capabilities of, potentially applicable technologies, and the roadmap for attaining this next-generation communications system User requirements, including expected number of users and required data rate, are specified in the Communications Operating Concept and Requirements for the Future Radio System (abbreviated as the COCR) This paper presents the results of a first order analysis that estimates the required bandwidth for the next-generation A/G communications system –This may be useful to spectrum management professionals faced with a requirement to justify the aforementioned reallocation of spectrum

3 Analysis Process Link Budget Derive Radio Coverage Using MLM data for all sectors provided by MITRE Calculate PIAC per radio site Coverage above FL180 for US Place En-route Radio Sites Account for channel access mechanism Calculate required channel rate # Freq required Freq reuse factor Total BW Calculate Required BW Use COCR loading calculations Add VDL2 overhead Estimate information throughput (service rate)

4 Derive Basic Radio Coverage Area from Link Budget The first step is to presume some physical layer parameters, and derive the radio communications coverage area from link budget calculations –Since this is a Future Radio System, to be deployed at L-Band, it is assumed that the physical layer of VDL M2 has been redesigned to be FSK modulation with a 100 Kbps data rate. –Link Budget (shown below) closes at 160nmi Assumes FSK modulation and data rate is selected to meet capacity requirements. A binary modulation was chosen due to the increased path loss at L-Band – the reduction in required Es/No more than offsets the increased noise due to larger BW Calculated from statistics derived from multiple iterations of the IF-77 Electromagnetic Wave Propagation Model (Gierhart-Johnson) model for slightly rolling plains

5 Place Radio Sites The second step is to develop a lay down for radio coverage in a region of interest –We have selected the continental United States, and show a notional radio placement to provide coverage above FL180 Radio Site ID (arbitrary number, used for tracking in spreadsheet)

6 Calculate PIAC per radio site The third step is to derive an estimate of the Peak Instantaneous Aircraft Count (PIAC) in each radio coverage volume To formulate this estimate, –Used 2020 PIAC number from MITRE MLM data This provides a number of aircraft in the en-route sectors of each center (ARTCC) as projected to the year 2020 –Assume uniform distribution within ARTCC –Derive PIACs for each ARTCC above Flight Level 180 This step is necessary as the radio coverage area (assumed) was for flight level 180 and above, and the MITRE data sometimes includes aircraft below this flight level –For each radio site estimate % ARTCC(s) coverage This step allows an estimate of the percent of aircraft in each center that fall in a particular radio sites coverage volume –Calculate PIACs for each radio site

7 Use COCR loading analysis to derive capacity requirements –COCR analysis includes message overheads through the Network layer (assumes ATN OSI overheads), models arrival rates for each message type and treats the A/G network as an M/G/1 server Add VDL-2 message overhead to account for sub-network loading 1 Derive Required Information Throughput 1 Loading is not particularly sensitive to the sub-network overhead. For example, inspection of the graph to the right does not show appreciable differences between the fully loaded message set and the COCR loading analysis, which leaves off at the network point of attachment. This is not the case for channel access mechanism, which can significant impact the required data rate.

8 Estimated Required Information Throughput Given the previously calculated PIAC values, and the transfer function between PIAC and loading (previous chart) map data requirements to radio sites as shown below. Information Throughput Required Radio Site ID

9 For a CSMA with collision detection with random backoff, a relationship between offered load and information throughput can be derived as S = Ge -2G –Relationship is plotted below –Using the above plot, actual channel BW required is ~5 times the information throughput (this is considered conservative for VDL M2 – published results indicate an achieved efficiency closer to 32%) Calculate Required Channel Rate Peak value at ~18%

10 Estimated Required Channel Rate Given the previously calculated information throughput, and transfer function (previous slide) we can calculate the required channel signaling rate. –Map shows required signaling rates between 122 and 430 kbps Channel Rate Required Radio Site ID

11 Calculate Required BW Use the following steps to estimate required BW –Assume a base radio data rate that is commensurate with serving a common denominator number of users – 100 kbps was selected Sensitivity analysis showed lower data rates were more efficient, but would not meet throughput requirements –For each radio site, given the required data rate, scale by the base data rate and take the ceiling. This is the number of the frequencies needed for each radio site –Count all radio sites frequencies to obtain total number of radio frequencies required –Scale by frequency reuse factor to account for reuse data rate –Multiply total number of frequencies by base data rate and efficiency (bps/Hz) to arrive at the BW required Derived BW required is approximately 10 MHz –Recall that this is just for en-route airspace, above FL 180. As coverage is pushed down to the surface, more BW would be required *Reuse factor of 1.23 is very conservative. In essence, we have assumed that coverage is provided from FL180 through FL450, and that the reuse factor is being driven by aircraft at the highest altitudes. *

12 Closing Thoughts The predicted bandwidth required was for green field spectrum –The need to engineer for compatibility with existing systems (if an overlay system in envisioned) will drive up spectrum requirements Use of pulsed signaling with low duty cycle is a technique that might be effective in promoting compatibility with DME equipment. This would drive up the spectrum requirements of the new system –Some efficiencies can be gained by use of a deterministic channel access mechanism Has the potential of reducing required bandwidth for the information transfer requirements of the future radio system However, the considerations required for co-site compatibility still apply and will work to drive spectrum requirements up Predicted BW was only for en-route communications. Coverage was assumed to be required above FL180 only. Additional channels/BW would be required to push coverage down to the surface

NASA A/G Communications Technology Assessment Study Supplemental

14 Calculate PIAC per Radio Site