First step is to identify cash flows as either benefits, disbenefits, or costs Benefits(B)--Advantages to the people Disbenefts--Disadvantages to the people.

Slides:



Advertisements
Similar presentations
Simplify Warm-up. Compare and Contrast Notes - Adding and Subtracting with LIKE Denominators When you are adding or subtracting rational expressions….
Advertisements

Rate of Return Multiple Alternatives Lecture slides to accompany
By JESUS GOMEZ. * HAVE SAME DENOMINATORS. * HAVE DIFFERENT NUMERATORS. * ADD ONLY NUMERATORS. * LEAVE DENOMINATORS ALONE. * HAVE SAME DENOMINATORS. *
Engineering Economy Practice Problems
Drake DRAKE UNIVERSITY Fin 200 NPV IRR and Capital Budgeting.
Exam 4 Practice Problems Douglas Rittmann, Ph.D., P.E.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Net Present Value and Other Investment Criteria Chapter Nine.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
1 By Assoc. Prof. Dr. Ahmet ÖZTAŞ Gaziantep University Department of Civil Engineering CE ECONOMIC DECISION ANALYSIS IN CONSTRUCTION CHP 7 -Benefit/Cost.
(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits.
EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD
Evaluating Projects with Benefit/Cost Ratio Method
Benefit/Cost Analysis Lecture slides to accompany
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 9-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Present Worth Analysis Lecture slides to accompany
1 Internal Rate of Return Internal Rate of Return (IRR): The interest rate i* at which NPW = 0 Note: This is the same as finding the roots of a polynomial.
Rate of Return Analysis: Multiple Alternatives Consider the following: You have $20,000 to invest in either alternative A or alternative B. Your MARR is.
Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the.
Comparing Projects Using Time Value of Money
Unit 4 – Capital Budgeting Decision Methods
The second objective today is to evaluate correctly capital investment alternatives when the time value of money is a key influence.
Engineering Economics. John Ayers September 17, 2004.
CHAPTER 11 EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD $$$ $
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 9-1 Developed.
Mutually Exclusive Independent Are compared only against do-nothing More than one can be selected Are compared against each other Only one can be selected.
10.4 Addition and Subtraction: Like Denominators Goal: to add and subtract rational expressions with like denominators.
12-6 Rational Expressions with Like Denominators Objective: Students will be able to add and subtract rational expressions with like denominators.
MIE Class #5 Manufacturing & Engineering Economics Concerns and Questions Concerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
© 2012 by McGraw-Hill All Rights Reserved 9-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 9 Benefit/Cost.
Exam 3 Practice Problems For Engineering Economy By Douglas Rittmann.
© 2012 by McGraw-Hill, New York, N.Y All Rights Reserved 5-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin.
Add & Subtract Rationals – Common Denominator To add or subtract rational expressions with common denominators: 1) Add or subtract the numerators 2) Write.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. 1 Blank & Tarquin: 5th Edition. Ch. 9 Authored by: Dr. Don.
Do Now (3x + y) – (2x + y) 4(2x + 3y) – (8x – y)
A shifted uniform series starts at a time other than year 1 When using P/A or A/P, P is always one year ahead of first A When using F/A or A/F, F is in.
10.4 Addition and Subtraction: Like Denominators.
Task 2.6 Solving Systems of Equations. Solving Systems using Substitution  Solve using Substitution if one variable is isolated!!!  Substitute the isolated.
8-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 8 Rate of Return Multiple Alternatives © 2012 by.
1 Incremental Analysis A technique or approach that can be used with NPW, EAW, and later with IRR and Cost/Benefit to determine if an incremental expenditure.
Economic Analysis in the Public Sector Benefit/Cost Analysis.
Incremental Analysis Based on concept that any avoidable investment that does not yield at least the MARR should not be made Involves determining the ROR.
Chapter 6: Comparison and Selection Among Alternatives
Chapter 6: Comparison and Selection Among Alternatives
Solving Systems of Equations using Elimination
Present Worth Analysis Lecture slides to accompany
Fractions: Adding and Subtracting Like Denominators
Chapter 6: Comparison and Selection Among Alternatives
Benefit Cost Analysis and Public Sector Economics
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 6: Comparison and Selection Among Alternatives
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Shifted Uniform Series
Present Worth Analysis Lecture slides to accompany
6-3 Solving Systems Using Elimination
EXAMPLE Benefits and Costs of a Convention Center and Sports Complex
Chapter 11 Investment Decision Criteria
Fractions: Adding and Subtracting Like Denominators
Present Worth Analysis Lecture slides to accompany
Lecture slides to accompany Engineering Economy, 8th edition
Adding and Subtracting Rational Expressions
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
10.4 Addition and Subtraction: Like Denominators
B/C Ratio-Multiple Alts
AW of infinite-life alts
Chapter 6: Comparison and Selection Among Alternatives
Alternative Classification
Steps of the Incr. Analysis Process
Shifted Series & Random Single Amounts
Chapter 6: Comparison and Selection Among Alternatives
Presentation transcript:

First step is to identify cash flows as either benefits, disbenefits, or costs Benefits(B)--Advantages to the people Disbenefts--Disadvantages to the people Costs--Expenditures by the government Conventional B/C ratio = B - D C Note 1: All terms in equation must be expressed alike( P,A, or F) Note 2: Do not use minus sign for costs Note 3: Savings to gov’t are subtracted from costs

Conventional B/C ratio = B - D C Modified B/C ratio = B – D – M&O C (M & O cost subtracted from numerator rather than added to denominator) If B/C ≥ 1, accept project For B/C < 1, reject Example: A flood control project will have a first cost of $1.4 million with an annual maintenance cost of $40,000 and a 10 year life. Reduced flood damage is expected to amount to $175,000 per year. Lost income to farmers is estimated to be $25,000 per year. At an interest rate of 6% per year, should the project be undertaken? Solution: Express all values as A and then find B/C ratio: B = $175,000 D = $25,000 C = 1,400,000(A/P,6%,10) + 40,000 = $230,218 B/C = (175,000 – 25,000)/230,218 = 0.65 Therefore, do not build project

Two types: independent and mutually exclusive Next, compare first two alts incrementally Then, eliminate one and compare survivor w/ next alt Finally, continue comparing alts until only 1 remains For mutually exclusive, first rank alternatives according to increasing total cost(add DN for stand alone alternatives) For independent, compare alts against DN and select all that have B/C ≥ 1

Example: The benefits, disbenefits, and costs shown below are for mutually exclusive alternatives. At an interest rate of 6% per year, which one, if any, should be selected? Project ID Benefits, $/yr Disbenefits, $/yr Costs, $/yr A 615,000 36, ,000 B 200,000 30, ,000 C 400,000 25, ,000 Solution: The alternatives are stand alone(i. e. each has benefits) Therefore, add DN and rank according to cost: DN, B, C, A Compare DN vs B: B/C = (200 –30)/150 = 1.1 eliminate DN B vs C: [(400 –200) – (25 – 30)]/(290 – 150) = 1.5 eliminate B C vs A: [(615 –400) – (36 –25)]/(500 – 290) = 0.8 eliminate A Only one alt remains. Therefore, select alt C